Question 1

Contract documents serve as the legal contract between

Options:

A.

the client and the designer

B.

the client and the contractor

C.

the designer and the contractor

D.

the contractor and the suppliers

Question 2

During construction, the general contractor notices conflicting information between the construction drawings and the specifications. The FIRST step the contractor should take is to

Options:

A.

issue a change order

B.

make an interpretation

C.

notify the owner of the discrepancy

D.

notify the designer of the discrepancy

Question 3

While visiting a job site, it is observed that the junction boxes for wall sconces are mounted at thewrong height. What should be done?

Options:

A.

Tell the electrical contractor on-site to move them and follow up with written documentation

B.

Issue a proposal request to the general contractor to verify the cost for having them relocated

C.

Notify the general contractor’s superintendent on-site and follow up with written documentation

D.

Wait until construction has been completed and then note the problem on the punch (deficiency) list

Question 4

A project is considered substantial and complete when

Options:

A.

Partial occupancy has been issued

B.

Deficiencies have been documented

C.

Progress payments have been administered

D.

The owner can use it for its intended purpose

Question 5

What is the MAXIMUM occupant load of a business occupancy with one exit?

Options:

A.

49

B.

50

C.

69

D.

70

Question 6

Which wall assembly would produce the highest STC rating?

Options:

A.

2x4 studs at 16" [406 mm] OC, 2 layers of 5/8" [15 mm] gypsum board on each side, full batt insulation

B.

2-1/2" [64 mm] metal studs at 16" [406 mm] OC, 1/2" [13 mm] gypsum board on each side, full batt insulation

C.

3-1/2" [89 mm] metal studs at 16" [406 mm] OC, 5/8" [15 mm] gypsum board on each side, full batt insulation

Question 7

A restaurant is designated as which occupancy classification?

Options:

A.

public: group P-3

B.

business: group B

C.

restaurant: group R

D.

assembly: group A-2

Question 8

A designer is working on a joint venture project with a local engineering firm for a large university project. What drawing system will BEST incorporate coordination of project information?

Options:

A.

Facility condition index (FCI)

B.

Building information modeling (BIM)

C.

Project life cycle management (PLM)

D.

Virtual design and construction project manager (VDC)

Question 9

Which of the following is MOST likely to require a louvered door?

Options:

A.

IT closet

B.

Hotel room

C.

Executive office

D.

Dental exam room

Question 10

Why is corrective work completed post-occupancy often MORE costly for the contractor?

Options:

A.

The warranty has expired

B.

Progress payments are not included

C.

The work must be performed after hours

D.

Revisions are billed on a cost-plus basis

Question 11

What are the three parts of a Construction Specification Institute (CSI) specification?

Options:

A.

general, products, execution

B.

allowance, alternate, application

C.

information, purchasing, installing

D.

requirements, finishes, construction

Question 12

Which item causes the MOST issues when planning for systems workstations in an office space?

Options:

A.

The workstation cost is too expensive for the client’s budget

B.

The thickness of the panels was not considered when maintaining clearances

C.

The height of the panels is too low to reduce sound from traveling between workstations

D.

The electrical outlets are not maintained at the correct height to accommodate equipment

Question 13

What are the PRIMARY components of sustainability?

Options:

A.

global, wellness, and universal

B.

LEED, SMaRT, and Green Globes

C.

eco-friendly, non-toxic, and organic

D.

environmental, social, and economic

Question 14

During demolition, the contractor discovers dry rot in some existing walls that are to remain. After reaching an agreement with the client and contractor on a solution, what should be issued before construction continues?

Options:

A.

a bulletin

B.

an addendum

C.

a change order

D.

a change directive

Question 15

The project team is reviewing a mock-up of a faux plaster ceiling finish. The mock-up is a 4'x4' board on an easel in the contractor’s construction trailer. What should the designer request?

Options:

A.

A larger mock-up with the adjacent wall and light fixture finishes

B.

Three mock-ups with different shades of plaster and softer ambient lighting

C.

To view the sample horizontally from below and with lighting similar to the design

Question 16

During construction of a project in another city, what is a common and efficient way for a small firm to manage the progress?

Options:

A.

visit the location of the project on a weekly basis

B.

joint-venture with a design firm local to the project

C.

partner with a prominent company local to the designer

D.

hire one employee that will remain in the city of the project

Question 17

What kind of schedule shows which tasks are the highest priority and what the effect will be on the overall project if the tasks take longer than estimated?

Options:

A.

Work Flow

B.

Gantt Chart

C.

Critical Path Method (CPM)

D.

Program Evaluation Review Technique (PERT)

Question 18

How do project managers guide a project if they or the design team lacks expertise in a certain area?

Options:

A.

Find appropriate consultants and include them in the design team

B.

Use an appropriate consultant if a problem arises during the project

C.

Require project team members to research information on the design criteria

D.

Select one member of the design team to receive training in the expertise required

Question 19

What should a designer recommend to BEST save on construction costs in a corporate office project with a tight improvement allowance?

Options:

A.

Reuse the existing doors and millwork where possible

B.

Save as many existing nonstructural walls as possible

C.

Maintain the existing water closet and lavatory locations

D.

Design an open-plan for each space without suspended ceilings

Question 20

In a soft goods furniture specification, what information should always be included?

Options:

A.

Fabric specification

B.

Installation instructions

C.

Location of the item on the plan

D.

Furniture vendor’s contact information

Question 21

What is the BEST way for a designer to determine whether the payment application of a contractor is consistent with the work completed to date?

Options:

A.

Request a breakdown of the pricing in the payment application to be reviewed by the consultants

B.

Participate in periodic site visits to compare progress onsite to progress claimed in the payment application

C.

Review the project schedule to determine what should be completed by the date of the payment application

D.

Call the subcontractors individually to verify that the work noted on the payment application is indeed complete

Question 22

A building code official has declined to issue a building permit for a project. The official explains that the plans and specifications do not meet code in terms of partition fire ratings and finishes. In order to keep the project on schedule, what would be the FIRST step in dealing with the problem?

Options:

A.

File an appeal with the city

B.

Notify the client immediately

C.

Notify the contractor by phone

D.

Discuss the problem with the code official

Question 23

During construction, a designer has been informed that the floor tile specified will delay occupancy. What is the BEST course of action?

Options:

A.

Modify the specifications to an alternate flooring type that is in stock

B.

Change the specifications to an in-stock tile and obtain the client’s agreement

C.

Notify the client and all subtrades that the anticipated schedule will be delayed

D.

Give an estimate of how far behind schedule the project is, with a new completion date

Question 24

Which consultant should be contacted to correct omissions on the drawing shown below?

as

Options:

A.

Electrical

B.

Plumbing

C.

Structural

D.

Fire protection

Question 25

The office manager for a client signed a contract for design services. However, the owner refuses to pay the design fee because the office manager did not have the authority to sign the contract. This is an issue of

Options:

A.

mutual assent

B.

breach of contract

C.

contractual capacity

D.

designer responsible disclaimer

Question 26

What is the MOST cost-effective way to locate plumbing fixtures in a commercial building renovation?

Options:

A.

Install plumbing fixtures by vertical penetrations

B.

Place plumbing fixtures in the axis of the building

C.

Locate plumbing fixtures on the exterior walls of the building

D.

Place plumbing fixtures as close to existing plumbing lines as possible

Question 27

Which drawings and information would be presented during the design development phase?

Options:

A.

Preliminary floor plan, elevations, and details

B.

Bubble diagrams, scale models, and finish schedule

C.

Finalized floor plans, 3-D drawings, and finish samples

D.

Criteria matrix, orthographic drawings, and blocking diagrams

Question 28

The purpose of shop drawings is to

Options:

A.

Analyze the fabrication method

B.

Approve completeness of the details

C.

Check conformance with the design intent

Question 29

Which of the following installations would require a structural engineer to be involved?

Options:

A.

A wall-mounted furniture workstation

B.

A demountable partition wall

C.

A non-load-bearing interior wall

D.

An operable partition wall

Question 30

Which wall section provides for a two-hour fire-rated wall?

as

Options:

A.

1 5/8" [41 mm] metal studs, 1/2" [13 mm] regular gypsum board applied to each side, 3/8" [9 mm] regular gypsum board applied to each side

B.

Two layers 1/2" [13 mm] metal studs, regular gypsum board applied to each side

C.

1 5/8" [41 mm] metal studs, 1/2" [13 mm] type X gypsum board applied to each side, 1/4" [6 mm] regular gypsum board applied to each side, 2" [50 mm] glass fiber insulation

D.

1 5/8" [41 mm] metal studs, two layers 1/2" [13 mm] type X gypsum board applied to each side, glass fiber insulation

Question 31

Which person is MOST responsible for ensuring that the construction drawings are code-compliant?

Options:

A.

Developer

B.

Building owner

C.

Interior designer

D.

Building inspector

Question 32

The designer attends the weekly progress meetings and is responsible for the meeting minutes. How does the designer ensure that the minutes prepared are accurate?

Options:

A.

Issue a clause in the minutes indicating that minutes are approved and accepted as written

B.

Issue minutes including a clause stipulating minutes will be approved within 24 hours of issue

C.

Issue minutes including a clause enabling attendees to submit revisions within a specified time frame

D.

Issue draft minutes within 24 hours of the meeting, followed by final minutes within 72 hours of meeting completion

Question 33

A corporate client tells their designer that they will be purchasing all of their ancillary furniture directly, and would only like the designer’s assistance with the remaining pieces. Which of the following would be in the designer’s scope to specify?

Options:

A.

Reception sofa

B.

Break room barstools

C.

Open office workstations

Question 34

A project is running behind schedule and over budget. What should the designer do FIRST?

Options:

A.

Review and determine budget cuts with the client

B.

Simplify installation methods to save both cost and time

C.

Contact the client to discuss the problem as soon as possible

D.

Rank construction priorities and complete the critical path elements first

Question 35

What is the MINIMUM distance a vending machine can be located on the push side of a door with a closer and latch in an employee breakroom?

Options:

A.

12" [305 mm]

B.

18" [457 mm]

C.

24" [610 mm]

Question 36

What is required prior to occupancy to improve indoor air quality?

Options:

A.

clean the air intake vents

B.

run the mechanical system

C.

test carbon monoxide detectors

Question 37

Which scheduling method BEST shows the interrelationships of tasks?

Options:

A.

work plan

B.

Gantt chart

C.

critical path

D.

milestone chart

Question 38

What should be addressed FIRST in a letter of agreement?

Options:

A.

Legal obligations

B.

Scope of services

C.

Amount of retainer

D.

General bid conditions

Question 39

How are the actual riser and tread dimensions for a set of stairs determined?

Options:

A.

Divide floor opening by desired tread dimension

B.

Divide floor opening by desired riser dimension

C.

Divide floor-to-floor height by minimum riser dimension

D.

Divide floor-to-floor height by maximum riser dimension

Question 40

When estimating the total FF&E costs for installation, maintenance, and replacement, which of the following is being completed?

Options:

A.

Actual costs

B.

Planned value

C.

Life-cycle costing

D.

Cost-benefit analysis

Question 41

Changes made to the contract documents during the bid (tender) process are documented in a(n)

Options:

A.

Bulletin

B.

Addendum

C.

Change order

Question 42

What spaces are typically grouped together in a multistory building’s service core?

Options:

A.

lobby, elevator, corridors, stairs

B.

stairs, elevator, toilet rooms, supply closet

C.

kitchen, toilet rooms, loading docks, laundry

D.

janitors closets, electrical closets, data rooms, HVAC

Question 43

Which type of mechanical heating system uses pipes or tubing embedded within the ceiling, floor, or wall construction?

Options:

A.

electric

B.

radiant

C.

hot-water

D.

forced-air

Question 44

When completing an analysis of the existing conditions for a two-story commercial building, what are some CRITICAL accessibility items to review?

Options:

A.

entrances, exit signs, and location of accessible parking

B.

exit signs, interior path of travel, and location of accessible parking

C.

entrances, restroom (washroom) facilities, and vertical transportation

D.

interior path of travel, fire protection system, and vertical transportation

Question 45

A conflict on the job site impacts the location of a wall sconce, requiring an adjustment. The BEST way to communicate this change is for the

Options:

A.

interior designer to request the electrical engineer issue a change order

B.

interior designer to provide a sketch as part of a supplemental instruction

C.

general contractor to request a change directive prior to making a change

D.

electrical engineer to issue an addenda as part of the contract documents

Question 46

Delivery of product directly to the client’s address is known as

Options:

A.

pro forma

B.

sidemarked

C.

drop shipped

D.

freight on board

Question 47

When reviewing the general contractor’s pay application, the designer should approve the amount for

Options:

A.

Utilities and property taxes

B.

Subcontractors’ travel expenses

C.

Delivered materials stored on-site

Question 48

The purpose of a post-occupancy evaluation is to determine

Options:

A.

Compliance with the punch (deficiency) list

B.

The quality of general contractor performance

C.

The completeness of the construction documents

D.

Client satisfaction or dissatisfaction with the project

Question 49

A residential client wants to build an addition that would occupy the entire side-yard. What is the interior designer responsible for checking before proceeding?

Options:

A.

soils report

B.

access route

C.

setback requirement

D.

neighborhood agreement

Question 50

During a high school renovation project, the school board and several teachers each call the designer several times a week to request changes. What is the BEST way for the interior designer to keep the project on schedule?

Options:

A.

Send a weekly summary of calls, emails, and meetings to the stakeholders

B.

Ask the client to establish a point person and a clear line of internal decision-making

C.

Set up a weekly meeting with all stakeholders to discuss all of their proposed changes

D.

Talk to each stakeholder and take the time to incorporate all of the changes they request

Question 51

In a project that includes a home renovation and procurement of new furniture, what is the BEST fee structure?

Options:

A.

Hourly fee method and cost-plus method

B.

Square foot method and fixed fee method

C.

Fixed fee method and square foot method

D.

Value-oriented method and hourly fee method

Question 52

Where allowed by jurisdictional statute, when would an independent interior designer’s seal on drawings be acceptable?

Options:

A.

In combination with an architect’s seal on construction documents

B.

On the life-safety section of the construction documents

C.

In combination with a structural engineer’s seal

D.

On non-structural interior construction documents