LEED AP Interior Design + Construction (LEED AP ID+C) V4 Questions and Answers
Which of the following is required for a cooling tower and evaporative condenser in the Water Efficiency Prerequisite, Indoor Water Use Reduction?
The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will
For Indoor Environmental Quality Credit, Quality Views, which one of the following space types must be included when calculating the percentage with Quality Views?
A project has access to two alternative water sources. How should they determine which source to use where?
Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?
When developing the overall energy strategy of the project, which credit should the client consider to work synergistically with the Energy and Atmosphere Credit, Enhanced Commissioning, on an ongoing basis?
A project team wants to achieve Materials and Resources Credit, Building Product Disclosure and
Optimization - Material Ingredients. By what means can a product demonstrate their material ingredient optimization?
What must a project team inventory to determine if a project has enough reused surfaces to document Materials and Resources Credit, Interior Life-Cycle Impact Reduction, Option 1. Interior Reuse?
Discussing the project goals to help identify the credits and options that the team should attempt is an example of
Which material would have the largest contribution to Materials and Resources Credit, Building Product Disclosure and Optimization- Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?
To determine the area of interior nonstructural elements, the LEED AP will include which one of the following in the calculation for Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse?
The Commissioning Authority (CxA) must report results, findings and recommendations directly to the
What primary role does the LEED AP have during the LEED certification process?
Which of the following should a project team take into consideration during the discovery phase of site selection to earn Integrative Process Credit?
A tenant is soliciting proposals for a Commissioning (Cx) agent for Energy and Atmosphere Credit, Enhanced Commissioning. Which qualification must the agent meet?
When attempting Regional Priority Credit, Regional Priority what must be provided in the documentation?
Which project team members should be present at a goal setting workshop when using an Integrative Process project approach?
Regarding the Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, in addition to materials costs, what information is needed to determine the total cost of each product?
A project owner requests that additional outside air be provided to the building occupants in order to improve employee health, welfare, well-being and productivity. However, doing so could make it more difficult to achieve which credit?
The project team for a bank project located in a mall is wondering whether they can earn Location and Transportation Credit Surrounding Density and Diverse Uses, Option 2. Diverse Uses. When evaluating a map of nearby diverse uses, which of the following would you recommend to be entered in the calculation?
A tenant with 1,000 employees wishes to pursue LEED Interior Design and Construction Certification for their space in which they will be the sole tenant. Which of the following building attributes will help the tenant achieve points in the Location and Transportation category?
A client has moved into a building that has photovoltaic panels installed on the roof. Which credit applies?
For the achievement of Materials and Resources Credit, Interiors Life Cycle Impact Reduction, Option 1. Interior Reuse, how are hazardous materials accounted for in the calculation?
The use of MERV 13 (F7) air filters is required to obtain what credit?
A project is pursuing Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control. Which lighting control could the design team specify to meet the credit requirements for open-office workstations?
A design team is working on the hotel interior project in a hot and dry location. A heating, ventilating and air conditioning (HVAC) system is within the project scope. Which of the following strategies will contribute to minimization of ozone depleting potential and global warming potential for the project?
To assess the feasibility of earning Location and Transportation Credit, Reduced Parking Footprint, the project team should be familiar with what local government regulation?
A tenant is targeting LEED Platinum certification and has hired a LEED AP Interior Design and Construction consultant to help identify and use opportunities to achieve synergies across disciplines and building systems.
Which of the following analyses are required to be completed in the Integrated Process Worksheet to achieve an additional point?
Best practices recommend that the LEED AP confirm that minimum program requirements have been met
A tenant moves into an existing building where no modifications to the building envelope will be made. What credit would be affected by the visible light transmittance of the existing exteriorglazing?