What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
Which of the following topics needs to be addressed by retail project teams when administering the supply chain survey in order to meet the requirements of Materials and Resources, Ongoing Purchasing and Waste Policy, Option 1?
Under what scenario must building visitors be surveyed for the Location and Transportation Credit, Alternative Transportation, Option 1?
Which of the following strategies improves cooling tower water efficiency?
Cooling tower blowdown is necessary because
Which of the following prerequisites or credits have synergies with Materials and Resources Prerequisite, Facility Maintenance and Renovation Policy?
A cafeteria purchases $325.00 USD worth of United States Department of Agriculture (USDA) Organic Certified produce from a farm located 50 mi. (80 km) from the project building during the performance period. What is the maximum allowable value for this purchase that can be claimed towards Materials and Resources Credit, Purchasing- Ongoing?
The Materials and Resources (MR) section includes which of the following building products in Credit calculations?
Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of
the following statements is correct when considering baseline water usage in relation to water use?
An essential goal of retro commissioning, re-commissioning, or on-going commissioning for a building's energy using systems is to
What credit rewards customers who change their normal consumption patterns in response to the varying price of
energy over time?
What type of Credential does the principal participant of a project need to earn in order to achieve one point in the innovation credit?
For projects not eligible for the ENERGY STAR® rating, the project team could demonstrate compliance with Energy
and Atmosphere Prerequisite, Minimum Energy Efficiency Performance by
What is the maximum length of time allowed for a gap in performance monitoring before needing to restart the performance period?
Which refrigerant was phased out due to the Montreal Protocol?
A building owner wishes to provide better Indoor Environmental Quality to the building occupants while containing capital costs. The LEED AP suggests pursuing Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2. Filtration. However, the existing HVAC system was not designed to accommodate the required filters but is otherwise efficient and operating well. Which strategy would enable credit achievement?
When developing a transportation survey, a LEED AP must make certain that the survey instrument collects information
What information regarding a lamp is required to comply with Materials and Resources Credit, Purchasing - Lamps?
Which of the following is considered an ongoing purchase for the purpose of calculating Materials and Resources
Credit, Solid Waste Management - Ongoing?
What strategy should be performed if submetering of the irrigation system is not available or difficult to implement for an existing building to comply with the Sustainable Sites Credit, Site Management?
Which of the following environmental concerns is exacerbated by impervious surfaces?
Which of the following is a result of a low impact development rainwater management program?
Which of the following strategies are eligible for reducing the landscape water demand in Water Efficiency Credit, Outdoor Water Use Reduction?
Which of the followings operational elements need to be tracked only once during the performance period in order to meet the Sustainable Sites, Site Management Credit?
A property manager is evaluating various bids from pest management services. Which of the following service certifications would assist the existing building in achieving Indoor Environmental Quality Credit, Integrated Pest Management?
In following the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) Indoor Air Quality (IAQ) Guidelines for Occupied Buildings under Construction, what is the Minimum Efficiency Reporting Value (MERV)
as determined by ASHRAE 52.2-2007 required for renovation activities?
Which of the following is the most appropriate use of untreated stormwater?
What is the required frequency for conducting a waste stream audit in maintaining a high-performing solid waste management program?
A LEED AP performs several on-site reviews for LEED compliance and encounters the followingscenarios. Which scenario requires the installation of additional meters to comply with Energy and Atmosphere Prerequisite, Building-Level Energy Metering?
A building manager has purchased and installed new T8 (fluorescent) lamps throughout the project facility. All other lamps remained the same. The project building's average picogram per lumen hour decreased. A valid explanation for this change is that
The minimum amount of renovation or new construction work required to qualify for Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations is
Buildings account for what percentage of total energy use?
Evapotranspiration data is applied to what credit?
What public health risk must be balanced with water efficiency and chemical usage in every water treatment program?
What is the maximum allowed performance period defined for re-certification of a LEED Operations and Maintenance building?
In order to earn Indoor Environmental Quality Credit, Green Cleaning - Custodial Effectiveness Assessment, what is the highest APPA Leadership in Educational Facilities' Custodial Staffing Guidelines score a facility may achieve?
What is the minimum percentage reduction from the baseline required to earn the exemplary performance point for the Indoor Water Use Reduction Credit, Option 2?
The LEED AP is searching the Addenda Database for LEED Interpretations that pertain to Sustainable Sites Credit,
Light Pollution Reduction. Which interpretations must be used when attempting this credit?
A project is using an on-site captured rainwater system and municipally treated wastewater for both flush fixtures and irrigation. To which of the following Water Efficiency prerequisites or credits can these alternative water sources be applied?
A building is installing outdoor light fixtures that will directly emit light into the night sky. What is the minimum lamp lumens of the fixtures that must be partially or fully shielded to achieve a point for Sustainable Sites Credit, Light Pollution Reduction?
A LEED AP Operations and Maintenance project is at the end of the second month of the performance period when the team notices that the water meter readings for one of the two submeters is not being recorded. What advice should the LEED AP give the project team in order to comply with Water Efficiency Credit, Water Metering?
According to Sustainable Sites Credit, Rainwater Management, what is the maximum time allowed to comply with a failed inspection?
Storage locations are required for which of the following recyclable materials?
An individual tenant in a multi-tenant building is unwilling or unable to provide their purchasing data. How does this affect the overall requirement for Materials and Resources Credit, Purchasing - Ongoing?
At a minimum, which two factors must be continuously monitored by the system in order to achieveIndoor Environmental Quality Credit, Thermal Comfort?
According to Indoor Environmental Quality Credit, Daylight and Quality Views, what is the view factor in the diagram below?
When conducting the Indoor Environmental Quality Credit, Occupant Comfort Survey what is the minimum percentage of building occupants that must respond?
What is the allowed maximum tenant space exclusion for Energy and Atmosphere Prerequisite, Minimum Energy Performance?
Which of the following statements must be true in order to achieve the Water Metering Credit?