Black Friday Biggest Discount Flat 70% Offer - Ends in 0d 00h 00m 00s - Coupon code: 70diswrap

ASQ CQE Dumps

Page: 1 / 18
Total 175 questions

Certified Quality EngineerExam Questions and Answers

Question 1

Typically, a product that exhibits a constant failure rate follows what type of distribution for thefailure rate?

Options:

A.

Lognormal

B.

Poisson

C.

Exponential

D.

Binomial

Question 2

Which of the following equations is used to calculate the upper control limit for an average chart?

Options:

A.

x-a2r

B.

x-a2 r

C.

X+ D4 R

D.

X-D-R

Question 3

A company is designing a production process for a new consumer product. To ensure that the product will be traceable from design and production through end-user receipt and use. the company must develop a system for product

Options:

A.

review

B.

packaging

C.

identification

D.

storage

Question 4

Rank in order, from most to least effective, the controls for mitigating risk.

1. Safety devices

2. Design change

3. Training

Options:

A.

1,2,3

B.

1,3,2

C.

2,1,3

D.

2,3,1

Question 5

Working on ail design phases simultaneously is characteristic of

Options:

A.

design for six sigma

B.

design for reliability

C.

quality function deployment

D.

concurrent engineering

Question 6

A graph of a data set, composed of a series of rectangles, each proportional in width to the range of values in a class and proportional in height to the number of items or fraction of items falling in these classes, is called which of the following?

Options:

A.

Histogram.

B.

Raw data.

C.

Ogive.

D.

Venn diagram.

Question 7

How many total degrees of freedom are in an unreplicated 23 factorial experiment?

Options:

A.

7

B.

6

C.

5

D.

1

Question 8

as

A in this drawing, the symbol is being used to indicate the

Options:

A.

reference plane

B.

basic definition

C.

datum

D.

feature

Question 9

Choosing design settings to minimize the effect of noise is a goal of

Options:

A.

robust design

B.

tolerance design

C.

design verification

D.

design for maintainability

Question 10

Which of the following definitions describes severity?

Options:

A.

Probability that the failure would be avoided or detected

B.

Probability that the failure will occur

C.

Effect on uncertainty on objectives

D.

Impact that the failure would have

Question 11

An inventory list of laptops in a sales office is an example of which measurement scale?

Options:

A.

Nominal

B.

Ordinal

C.

Interval

D.

Ratio

Question 12

In an ISO-compliant quality system, which of the following methods would be most effective for identifying employee training needs?

Options:

A.

Allowing employees to identify their own training needs

B.

Conducting a needs analysis for each job category

C.

Requiring all employees to complete the same training courses

D.

Requiring supervisors to identify training for their employees

Question 13

Four ingredients are blended to make a final product. Using the data below, what is the expected weight and variation of the final product?

Ingredient A 70 ± 3.00 grams

Ingredient B 20 ± 1.73 grams

Ingredient C 15 ± 1.73 grams

Ingredient D 10 ±- 1.00 grams

Options:

A.

115 ± 7.46 grams

B.

115 ± 5.73 grams

C.

115 ± 4.00 grams

D.

115 ± 3.61 grams

Question 14

A test-retest study is performed to a coordinate measuring machine (CMM) using a working standard of 100.00 ± 0.001 mm (95% confidence). The length of the standard is measured 30 rimes. The mean and standard deviation of the measurements are x = 107.88: mm and 5 = 2.497 mm. All of the measurements are made are the same location on the standard and are taken by the same technician, who mounts and dismounts the unit for each measurement.

The necessary correction for the CMM is estimated to be

Options:

A.

-7.883 rum

B.

-2.497 mm

C.

2.497 mm

D.

7.883 mm

Question 15

Failure mode, effect, and criticality analysis, (FMECA) is primarily for the purpose of

Options:

A.

Learning as much about the item as possible after qualification test.

B.

Determining the way an item will most likely fail to help obtain design and procedural safeguards against such failures.

C.

Determining, by extensive analysis, the reliability of an item.

D.

Determining the cause of a failure, by dissecting the item, to help obtain corrective action.

Question 16

Two advantages of process mapping are the ability to

Ⅰ. Visualize the process being described.

Ⅱ. Discover manufacturing problems only.

Ⅲ. Discover quality problems only.

IV. Check current processes for duplication or redundancy.

Options:

A.

I and IV only

B.

II and III only

C.

I and III only

D.

II and IV only

Question 17

Which of the following tools specifies the use of a feedback cycle?

Options:

A.

Flowchart

B.

Cycle-time reduction

C.

Gantt chart

D.

Plan-do-check-act

Question 18

Quality planning is an activity that identifies the needs of which of the following stakeholders?

Options:

A.

Management

B.

Suppliers

C.

Employees

D.

Customers

Question 19

A process produces rejects at a rate of 6° o. If multiple samples of 5 are drawn from a population of 100.000. what is the expected number of rejects per sample?

Options:

A.

0.3

B.

30.0

C.

5,000.0

D.

6,000.0

Question 20

The following diagram was developed from a designed experiment.

as

Which of the following statements is true about the factors in this experiment?

Options:

A.

They are confounded.

B.

They are replicated.

C.

They show randomization.

D.

They show interaction.

Question 21

Who has primary responsibility for determining the purpose and scope of an audit?

Options:

A.

Client

B.

Auditee

C.

Auditor

D.

Audit manager

Question 22

The sample size for ANSI ASQ Z1.4. Level II plan is based on the

Options:

A.

size of the lot to be inspected

B.

size of the batch to be manufactured

C.

average size of production lots

D.

decision of the quality assurance manager

Question 23

A company is developing a machine that has many modules. Each module works as intended, but when placed in the machine the system performs at less than desired levels. System changes have further optimized each module, but overall system optimization has continued to decline. This is an example of

Options:

A.

a feasibility study

B.

a SWOT analysis

C.

a PEST analysis

D.

an unintended consequence

Question 24

In the failure rate model shown below, which one of the sections represents the period when catastrophic failures are likely to occur?

Options:

A.

A

B.

B

C.

C

D.

All sections can experience catastrophic failure.

Question 25

Which of the following assumptions is a robustness factor suitable for validating statistical conclusions?

Options:

A.

Low reliability of measures

B.

High statistical power

C.

Low reliability of treatment

D.

Violated expectations of test

Question 26

What type of test should be used to detect certain kinds of subsurface flaws?

Options:

A.

Visual inspection

B.

Liquid penetrant

C.

Magnetic particle

D.

Rockwell

Question 27

The holes in this drawing have what kind of tolerance?

as

The holes in this drawing have what kind of tolerance?

Options:

A.

Collateral

B.

Bilateral

C.

Unilateral

D.

Vertical

Question 28

A company's quality policy should be developed by the

Options:

A.

executive level of management

B.

manager of quality

C.

most productive process improvement team

D.

quality engineering department

Question 29

The values of two different variables are related to each other such that an increase in the value of the first variable is accompanied by a decrease in the value of the second variable. If the variables are perfectly correlated, their correlation coefficient will be equal to

Options:

A.

2.0

B.

1.0

C.

0.0

D.

-1.0

Question 30

During the causes of a problem have been verified in the analysis phase of a six sigma project, they will form the basis of the solution in Much of the following phases?

Options:

A.

Control

B.

Define

C.

Improve

D.

Measure

Question 31

Adjusting machine settings to reduce the effect of ambient temperature changes on the seal strength of a paper package is an example of

Options:

A.

robust design

B.

analysis of variance

C.

statistical process control

D.

process capability

Question 32

Which of the following tools can be used to determine the best option from many choices based on their importance and merits?

Options:

A.

Interrelationship digraph

B.

PERT chart

C.

Tree diagram

D.

Prioritization matrix

Question 33

Risk control includes making decisions using which of the following pieces of information?

Options:

A.

Acceptable levels of risk

B.

Fault tree analyses results

C.

Check sheet comparisons

D.

Analysis of experiments

Question 34

A failure node and effects analysis (FMEA) should be classified in what cost of quality category?

Options:

A.

Appraisal

B.

Prevention

C.

Control

D.

Inspection

Question 35

A company uses four components (W. X. Y. and Z) to create its final product. The source and time factors for these components are listed below. What is die critical path for this company's final product?

ComponentSourceAcquisition TimeInstallation TimePredecessor Steps

WInternaln/a4 weeksNone

XExternal5 weeks4 weeksNone

YInternaln/a4 weeksW.X.Z

ZInternaln/a6 weeksNone

Options:

A.

6 weeks

B.

8 weeks

C.

9 weeks

D.

13 weeks

Question 36

A leak test is performed on every water tank. The production superintendent wants to know the location of each leak on defective tanks. Which of the following tools is most appropriate for collecting this data?

Options:

A.

Pareto diagram

B.

Automatic gauging system

C.

Data coding

D.

Check sheet

Question 37

The probability of an accident for the head event "H" given below is:

Options:

A.

0.0700

B.

0.1125

C.

0.0689

D.

0.1100

Question 38

A test-retest study is performed to a coordinate measuring machine (CMM) using a working standard of 100.00 ± 0.001 mm (95% confidence). The length of the standard is measured 30 rimes. The mean and standard deviation of the measurements are x = 107.883 mm and 5 = 2.497 mm. All of the measurements are made are the same location on the standard and are taken by the same technician, who mounts and dismounts the unit for each measurement.

The precision of the CMM is estimated to be

Options:

A.

0.456

B.

2.497

C.

7.833

D.

12.735

Question 39

When nonconforming items are found, which of the following actions should be taken first?

Options:

A.

A Retest

B.

Destruction

C.

Identification

D.

Return to supplier

Question 40

A three-level, two-variable, full factorial experiment is to be run. The minimum number of runs will be

Options:

A.

6

B.

8

C.

9

D.

18

Question 41

The relationship between factors can be displayed using which of the following tools?

Options:

A.

Control chart

B.

Matrix diagram

C.

Check sheet

D.

Process map

Question 42

In reliability testing, operating an item in order to stabilize its characteristics is known as

Options:

A.

burn-in

B.

infant mortality

C.

debugging

D.

derating

Question 43

as

M in tills drawing, the symbol is being used to indicate the

H Calculator

Options:

A.

minimum material condition

B.

minimum measured condition

C.

maximum material condition

D.

maximum measured condition

Question 44

The primary purpose of the material review board is to

Options:

A.

monitor scrap and rework costs

B.

minimize quality costs

C.

disposition nonconforming product

D.

determine the root cause of problems

Question 45

Which of the following activities is a form of error-proofing?

Options:

A.

Housekeeping

B.

Fixture design

C.

Equipment calibration

D.

Double sampling

Question 46

Which of the following types of "voice" is most effective in written communication?

Options:

A.

Active

B.

Passive

C.

Strong

D.

Soft

Question 47

Which of the following problem-solving tools is a column graph which displays a static picture of the process?

Options:

A.

Pareto chart.

B.

Control chart.

C.

Histogram.

D.

Cause and effect diagram.

Question 48

Which of the following symbols indicates a termination point on a flowchart?

as

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Question 49

Which of the following is the most important aspect of a successful quality improvement effort?

Options:

A.

Employee participation

B.

Financial comminnent

C.

Management commitment

D.

Organizational need

Question 50

Competition, safety, warranty, service costs, and public liability are all characteristics of

Options:

A.

perceived risk

B.

supplier-customer agreement

C.

cost management

D.

system reliability'

Question 51

Which of the following tools should be used to break a broad goal into increasingly detailed levels?

Options:

A.

Affinity diagram

B.

Interrelationship digraph

C.

Matrix diagram

D.

Tree diagram

Question 52

Which of the following charts should be used to monitor leaks in plastic bottles?

Options:

A.

X and R

B.

X and s

C.

P

D.

np

Page: 1 / 18