Question 1

During a routine service visit, an engineer notices an LED indicator on a projector's front panel blinking regularly. What should be done?

Options:

A.

consult the projector's manual

B.

replace the projector's lamp and filters

C.

disregard because the projector is operational

D.

remove the power cable and re-boot the projector

Question 2

An integrator has to upgrade a camera system in an existing board room. What is the MOST IMPORTANT information to gather on the site visit?

Options:

A.

cable length

B.

ambient lighting placement

C.

resolution of camera system

D.

distance from the lens to first participant

Question 3

By code, projection screens should be positioned in a manner that avoids blocking

Options:

A.

lines of sight and lectern access.

B.

paintings, cabinets, and sliding doors.

C.

alarm indicators, clocks, and light switches.

D.

windows, aquariums, and other glass surfaces.

Question 4

The limits of the vertical visual field indicate that displays should be positioned where in relation to the viewers' standard line of sight?

Options:

A.

center of the image is precisely on-axis

B.

center of the image is at least 10 degrees above

C.

top of the image is no more than 30 degrees above

D.

bottom of the image is no more than 30 degrees below

Question 5

Assuming that the screen and projector are both Ethernet controllable devices, where does the control system for the AV solution need to exist?

Options:

A.

connected to the network

B.

in the rear projection room

C.

in a dedicated rack in the room

D.

above the projector, plugged into the serial port on the projector

Question 6

A 2x2 video wall was sold with each display being Full HD resolution. Now the client wants to show live content at the best possible quality over the complete wall. Which resolution must the camera provide?

Options:

A.

1920 x 1080

B.

3840 x 2160

C.

4096 x 2160

D.

7680 x 4320

Question 7

A client has a laser projector that fails and appears dead after six months’ use. The documentation shows that the projector is covered by a return-to-base or back-to-bench warranty. The client can expect to:

Options:

A.

Receive remote-access repair service

B.

Receive on-site visit from service engineer

C.

Remove projector and ship back to manufacturer

D.

Remove projector and replace with advanced-shipped unit

Question 8

Which drawing represents a Reflected Ceiling Plan (RCP)? Please click anywhere on the correct image.

as

Options:

Question 9

According to AVIXA's Projected Image System Contrast Ratio standard, what is the minimum contrast ratio for a projected image?

Options:

A.

1:1

B.

5:1

C.

10:1

D.

15:1

Question 10

When designing an AVB system, ensuring that these are AVB compliant is critical.

Options:

A.

displays

B.

loudspeakers

C.

microphone cables

D.

network electronics

Question 11

Company information, statement of work, drawings, and bill of materials are presented to the customer as what set of documents?

Options:

A.

request for quote

B.

request for proposal

C.

contract documents

D.

bid packet (response)

Question 12

When training a new user to operate the solution that has been provided, how should the training be started?

Options:

A.

With a good joke.

B.

With the display up and running.

C.

With the system up and running.

D.

With the system shut down and at a state of rest.

Question 13

On a construction project awarded through a competitive process, the electrical contractor says that the AV company is responsible for the installation of conduit. What project document(s) would determine responsibility?

Options:

A.

estimate

B.

submittals

C.

proposal cover letter

D.

bid (tender) documents

Question 14

The color of a light wave is determined by the

Options:

A.

ambient temperature.

B.

polarization.

C.

frequency.

D.

amplitude.

Question 15

A task cannot begin before another task is completed. How is this described in a project task schedule?

Options:

A.

requirement

B.

dependency

C.

consequence

D.

determination

Question 16

Which one of these features has to be disabled for a network switch in a Dante network?

Options:

A.

QoS (Quality of Service)

B.

PoE (Power over Ethernet)

C.

EEE (Energy Efficient Ethernet)

D.

IGMP (Internet Group Management Protocol)

Question 17

During an initial customer visit, it is important to determine whether or not one is

Options:

A.

going to get the job.

B.

being competitive enough.

C.

meeting with the decision maker.

D.

going to have enough cable in stock to do the job.

Question 18

The functionality of an audio system is often reduced to what three easily understood concepts?

Options:

A.

Intelligibility, bass, stability

B.

Reverberation, depth, stability

C.

Intelligibility, loudness, warmth

D.

Intelligibility, loudness, stability

Question 19

When a presenter is using a headworn wireless microphone, the sound technician notices a great deal of plosives and breath noise. To correct this problem, the technician should:

Options:

A.

Ask the speaker to talk more quietly

B.

Adjust the microphone wireless transmitter gain

C.

Change from an omnidirectional to a cardioid capsule

D.

Adjust the position of the microphone and use a windscreen

Question 20

During the needs analysis stage, it is MOST IMPORTANT to determine the client's

Options:

A.

budget.

B.

application.

C.

mission statement.

D.

installation time frame.

Question 21

Which document is used to clarify a project design issue?

Options:

A.

change order

B.

progress report

C.

request for change

D.

request for Information

Question 22

While conducting routine maintenance, an AV technician notices that there is distortion coming from the main loudspeaker. This is likely caused because the amplifier's

Options:

A.

volume is minimized.

B.

volume is maximized.

C.

input signal is clipping.

D.

input signal is showing a bouncing audio signal.

Question 23

A typical speech reinforcement system which is broken down into zones, with each zone corresponding to its own set of microphones, power amplifiers, and loudspeakers is known as:

Options:

A.

Mix-minus

B.

Public address

C.

Audio conferencing

D.

Interruptible feedback

Question 24

When creating an estimate for a request for proposal (RFP), what is the FIRST tiling that should be done?

Options:

A.

obtain the costs

B.

create the submittal

C.

schedule a site visit

D.

read the project description

Question 25

The BEST way to ensure that a project is on budget is to

Options:

A.

calculate the number of calendars days remaining to completion.

B.

visit the job site and determine the percentage of work completed.

C.

ask the installation team to estimate remaining work to completion.

D.

review accrued labor and material costs against remaining work.

Question 26

Which of the following takes the highest precedence when the interpretations of applicable codes and standards are in conflict?

Options:

A.

local fire codes

B.

company guidelines

C.

national safety codes

D.

local authority that has jurisdiction

Question 27

When planning video content with a client, it is important to get their Pantone data (PMS) to ensure

Options:

A.

the displayed colors match printed colors.

B.

their confidence monitor size is large enough.

C.

the displayed logo is the proper size and style.

D.

the displayed type face is the correct size and style.

Question 28

Ambient noise PRIMARILY affects desired sound by

Options:

A.

enhancing it.

B.

canceling it out.

C.

interfering with it.

D.

complementing it.

Question 29

as

According to the Gantt chart pictured, the Project Manager should wait to start Activity C until which predecessor has been reached?

Options:

A.

Week 3

B.

Week 4

C.

Activity B

D.

Milestone X

Question 30

A newly installed AV system is experiencing intermittent loss of video on one display. What is the FIRST step the technician should take?

Options:

A.

Replace the display

B.

Swap the video source

C.

Check cable connections

D.

Update firmware on the switcher

Question 31

Project documentation states the system must logically Isolate control and media networks. What piece of network equipment should be used?

Options:

A.

router

B.

access point

C.

managed switch

D.

unmanaged switch

Question 32

What section of the color chart is used to calibrate brightness? Select the answer by clicking on the appropriate area of the chart

as

Options:

Question 33

Referring to this mix-minus system, in which zone should zone C's microphones be the LOUDEST? Select the answer by clicking anywhere within the correct zone.

as

Options:

Question 34

Which section of the Ohm's Law chart would you use to calculate watts? Select the coned quadrant.

as

Options:

Question 35

Which section of a program report describes the probable costs of an AV project?

Options:

A.

budget

B.

needs analysis

C.

systems descriptions

D.

infrastructure requirements

Question 36

What is the aspect ratio in these images?

as

Options:

A.

1.33:1

B.

4:3

C.

5:4

D.

16:9

Question 37

When using an IR-based assistive listening system, where MUST the transmitter be located?

Options:

A.

Under the presenter's desk

B.

At the top of the AV equipment rack

C.

With line-of-sight to the audience area

D.

Within 25 feet (7.6 meters) of the wheelchair seating area

Question 38

When doing a site survey for the installation of a large LED video wall, what is MOST important to consider?

Options:

A.

Wall color

B.

Wall finish

C.

Ceiling height

D.

Ceiling material

Question 39

Which of the following is the BEST service when new firmware is available for installed equipment across a fleet of conference rooms?

Options:

A.

keeping current version

B.

replacing the equipment

C.

updating them all at once

D.

a ringed update approach

Question 40

In the initial stage of determining AV equipment for an installation, the AV team gathers information PRIMARILY to:

Options:

A.

Understand the application

B.

Prepare a punch (snag or defect) list

C.

Establish a baseline for system performance

D.

Produce schematic drawings of the proposed solution

Question 41

Projectors utilizing laser phosphor technology might be favored for installation in inaccessible locations because:

Options:

A.

They are cheaper and easier to install.

B.

They require little maintenance and they generate less heat.

C.

They fit in a smaller lighter package compared to lamped units.

D.

The light source is linear so less affected by ambient conditions.

Question 42

As part of a service agreement offering, wfwt PRIMARY role do preventive maintenance visits (PM/PMV) play?

Options:

A.

allows the AV provider toclean, service and assess equipment In the field on a regular basis

B.

allows the AV provider to check in with customer and serves as an opportunity to sell further solutions

C.

allows the AV provider tosell a service that is often forgotten by the customer, and therefore generate greater profit

D.

allows the AV provider access to client premises and scope future work

Question 43

A customer wants to reuse existing network cabling to extend audio and video signals in a system refresh. What is the PRIMARY concern?

Options:

A.

cable color

B.

cable labeling

C.

cable condition

D.

cable connection

Question 44

The description and pricing for an AV solution is submitted during which phase of an AV project?

Options:

A.

Proposal

B.

Execution

C.

Needs Analysis

D.

Request for Information (RFI)

Question 45

The FIRST step in troubleshooting an AV system is to

Options:

A.

clearly identify the failure symptoms.

B.

change only one component at a time.

C.

ensure that all the system components have power.

D.

divide the system in half to identify the portion that is not working.

Question 46

During an initial meeting with a prospective client regarding an audiovisual project, it is important to understand the customer's method of procurement in order to avoid.

Options:

A.

making commitments with regard to delivery times for equipment.

B.

designing the system beyond the budgetary constraints of the client.

C.

missing some of the important components that will be included in the final project.

D.

expending time and resources designing a project that may ultimately go to bid (tender).

Question 47

Reverberant sound reaches the listener's ears

Options:

A.

after

B.

before

C.

synchronized with

D at the same level as the direct sound.

Question 48

Which of the following terms is defined as a lamp that produces light by heating a filament in a sealed glass housing?

Options:

A.

Incandescent Lamp

B.

Fluorescent Lamp

C.

CFL Lamp

D.

LED Lamp

Question 49

An AV technician has been called to a lecture hall where the presenter complains of a loud squealing noise that makes their presentation inaudible. What is the BEST strategy to address the complaint?

Options:

A.

Increase the gain for the microphone

B.

Position the microphone away from the presenter

C.

Position the microphone in front of the loudspeakers

D.

Mute unused microphone channels on the audio mixer

Question 50

When addressing system functionality with a client, an integrator should:

Options:

A.

Discuss future technologies

B.

Ignore currently installed systems

C.

Suggest sustainable building guidelines

D.

Assess specific requirements and expectations

Question 51

Exhibit:

as

These images provide examples of _____ distortion.

Options:

A.

Contrast

B.

Chromatic

C.

Keystone

D.

Trapezoid

Question 52

An event planner for a banquet surrounding a swimming pool has requested that the pool be lit in the client’s colors using underwater lighting. What does the technician need to consider?

Options:

A.

the IP rating of the fixtures

B.

access to a grounded power supply

C.

whether the installing technicians are PADI certified

D.

the ability to physically secure the fixtures underwater

Question 53

Upon completion of hardware installation and configuration for a new deployment, the NEXT thing the AV Project Manager should have scheduled is

Options:

A.

training the client.

B.

testing and verification.

C.

invoicing and project close out.

D.

preventative maintenance schedule.

Question 54

Noting the position of ventilation ducts is useful when determining

Options:

A.

the best position for the lectern.

B.

the heat gain of the equipment rack.

C.

where a projector can be suspended.

D.

where people can be seated in the room.

Question 55

As a project manager, daily or weekly updates from the____are MOST USEFUL when trying to make sure a job comes in on time and on budget.

Options:

A.

installer

B.

customer

C.

employer

D.

consultant

Question 56

What PRIMARY concern should the sales representative have had during the site survey of this room?

as

Options:

A.

room orientation

B.

length of cable runs

C.

ceiling clearance for the projector lift

D.

combination of fluorescent and Incandescent lighting

Question 57

During project delivery and after completion, it is important to ensure correct management of control system code so that

Options:

A.

programming costs will be within project budget.

B.

other contractors are unable to reuse or edit code.

C.

the most up-to-date version of code is available for upload when required.

D.

sub-contract programmers submit uncompiled code as per their contract of employment.

Question 58

What does a compressor control in an audio system?

Options:

A.

phase

B.

directivity

C.

frequency

D.

dynamic range

Question 59

The AV Project Manager is responsible for

Options:

A.

schedule, budget, scope.

B.

design, schedule, configuration.

C.

budget, installation, maintenance.

D.

configuration, scope, maintenance.

Question 60

A change order (variation) is best defined as a:

Options:

A.

Change to the technician’s salary

B.

Price change to a vendor purchase order

C.

Drawing change to document CAD details

D.

Change to the scope of an awarded project

Question 61

Owner standards and design manuals are examples of which kind of documentation?

Options:

A.

vendor

B.

technical

C.

architectural

D.

existing conditions

Question 62

Up to which data rate can USB 2.0 support?

Options:

A.

12 Mbps

B.

480 Mbps

C.

10 Gbps

D.

5 Gbps

Question 63

At what time of day is it BEST to conduct a site survey?

Options:

A.

Early mornings

B.

During normal operations

C.

After normal business hours

D.

Only at specially scheduled appointments

Question 64

Determining the expectations of the end users of a presentation space is called a(n):

Options:

A.

Needs analysis

B.

Program report

C.

Executive summary

D.

Performance verification

Question 65

An application requires Its equipment to be operational 24 hours a day and the owner considers the system mission critical. What type of warranty would be BEST for the equipment?

Options:

A.

limited warranty

B.

implied warranty

C.

manufacturer's factory warranty

D.

advanced replacement warranty

Question 66

A loudspeaker with sensitivity 90 dB SPL measured at 1 meter, 1 watt Is placed 2 meters away from a listener. At 1 watt, what Is the SPL at the listener?

as

Options:

A.

81 dB SPL

B.

84 dB SPL

C.

87 dB SPL

D.

90 dB SPL

Question 67

When conducting an analysis of the customer's needs, the integrator should:

Options:

A.

Keep in mind vendor promotions

B.

Recommend future proof solutions

C.

Have a pre-visualized design in mind

D.

Fill in missing information with the help of the end user

Question 68

What is the BEST way to manage a campus-wide AV system deployment?

Options:

A.

service level agreement

B.

on-site monitoring checks

C.

remote monitoring solution

D.

stand-by stock of equipment

Question 69

Which addressing scheme is used to define a fixed, routable IPv4 address that is locally assigned?

Options:

A.

static

B.

DHCP

C.

link-local

D.

DHCP reservation

Question 70

In order to calculate throw distances for an existing installation, what is the FIRST thing to evaluate?

Options:

A.

aspect ratio

B.

light conditions

C.

the size of the screen

D.

the height of the ceiling

Question 71

Invoicing clients, purchasing AV equipment and providing estimates are examples of which of the following types of work?

Options:

A.

design

B.

installation

C.

administration

D.

project management

Question 72

Signal flow on a schematic is conventionally shown in which direction?

Options:

A.

Left to right

B.

Right to left

C.

Top to bottom

D.

Bottom to top

Question 73

What is the MAIN difference between OLED displays and LCD displays?

Options:

A.

Luminosity

B.

Higher brightness

C.

Self-emitting light source

D.

Determined screen shape

Question 74

While conducting a site survey, it is discovered that a conference room has glass walls, high ceilings, and wooden floors. The BIGGEST challenge for this room would be handling of which of the following?

Options:

A.

feedback

B.

cable paths

C.

reverberance

D.

loudspeaker placement

Question 75

There are a number of ways to attach a projector mount to a concrete ceiling. What is tire PRIMARY factor that must be considered when deciding which, if any, method is appropriate?

Options:

A.

the age of the concrete

B.

the condition of the concrete

C.

the tools that are available

D.

the space between the drop ceiling and the concrete

Question 76

The installation of a complex AV project is planned to be completed within 6 months. What is the MOST cost-effective plan for ordering the equipment for the project?

Options:

A.

Order everything as soon as the contract is signed.

B.

Place the order 5 days before the scheduled day for starting installation.

C.

Order each piece of equipment to be delivered as soon as possible.

D.

Order equipment to be delivered on a "just in time" basis according to the installation schedule.

Page: 1 / 25
Total 254 questions