EMC D-VXB-DY-A-24 Dumps

Dell VxBlock Deploy Achievement Questions and Answers

Question 1

Where is customer feedback captured during the Lessons Learned phase of the project closure?

Options:

A.

Project Feedback Form

B.

Project Workbook

C.

Configuration Reference Guide

D.

Customer Satisfaction Survey

Question 2

What is a key benefit VxLAN?

Options:

A.

It reduces implementation cost of multiple VxBlock systems sharing data centers.

B.

It enables vMotion over Layer 3 subnets across geographic locations.

C.

It enables inter-VM communications among data center servers in different Layer 2 subnets.

D.

It can be configured in the hypervisor to support an NSX implementation.

Question 3

as

Refer to the exhibit.

A cable with the following label was connected to the wrong equipment type:

* M91A-01:01 U61A-01:09

Based on the exhibit, what is the target equipment type?

Options:

A.

Nexus 9xxx, Slot A, Port1

B.

UCS 5108 Chasses A, Slot 1, Port 9

C.

MDS 9xxx, Slot 1, Port 1

D.

UCS 6xxx FI, Uplink A, Slot 1, port 9

Question 4

A customer site has a VM in the VxBlock dedicated to a multicast application. The network monitoring team observes heavy network utilization each time the video streaming isrequested.

What should be enabled to address this issue?

Options:

A.

LACP

B.

vPC

C.

IGMP

D.

VTP

Question 5

A Customer Engineer just connected to their new VxBlock 1000 that was shipped with NSX. From where can the Customer Engineer confirm that the correct vSphere clusters

are prepared for NSX?

Options:

A.

NSX Controller

B.

vCenter Web Client

C.

NSX Manager VAMI

D.

ESXi host VIBs

Question 6

Which logical entity in ACI allows for logical separation and reuse of IP address space within an ACI fabric?

Options:

A.

EPG

B.

VLAN

C.

Context

D.

Tenant

Question 7

What is a collection of similar endpoints representing an application tier or set of services within the ACI fabric?

Options:

A.

Tier

B.

Context

C.

Policy

D.

EPG

Question 8

A customer is planning to integrate a VxBlock to a new Cisco ACI fabric. What major physical connectivity change is needed if the customer intends to convert their existing

VxBlock Nexus 9396PX switches to ACI mode?

Options:

A.

Connect the switch directly to the APIC to download the ACI software. Then connect the existing Nexus 9396PX switches to a spine Nexus 93180YC switch.

B.

Remove the dual peer link connection but keep the peer link connection for ACI fabric heartbeat traffic exchange.

C.

Connect the Nexus 9396PX switch to spine Nexus 9500 switches. Remove other connections between the Nexus 9396PX switches.

D.

Nexus 9396PX switch cannot be integrated directly to ACI fabric.

Question 9

A VxBlock 1000 is running VMware vSphere 6.7. To support an audit, a customer engineer is trying to map the networking components in the VxBlock to a traditional datacenter

architecture.

Which component should the engineer map to the access switch?

Options:

A.

VMware virtual distributed switch

B.

Fabric Interconnect

C.

Nexus 1000V switch

D.

Nexus 9306PX switch

Question 10

What service is provided by a VMKernel NIC?

Options:

A.

vMotion

B.

vCenter management

C.

VDS management

D.

System control

Question 11

You are expanding a PowerMax 8000. What is the maximum allowed dispersion, in meters, between bricks?

Options:

A.

30

B.

25

C.

20

D.

35

Question 12

A VxBlock 1000 UCS domain is being managed via Fabric Interconnect (FI) A as the cluster lead. The expansion team adds two new B-series servers to the domain. When

attempting to vMotion from the existing blades to one of the new blades, the power to Fabric Interconnect A is disconnected.

What is the expected result?

Options:

A.

vMotion completes successfully, but access to the vCenter will be lost

B.

vMotion fails, but is automatically retried once the Fl comes back online

C.

vMotion fails because the Fl managing the session is powered off

D.

vMotion completes successfully despite the FI power failure

Question 13

What is used to collect VxBlock component information during an RCM Assessment?

Options:

A.

VMware vRealize Operations

B.

VMware Configuration Automation Tool

C.

Dell EMC SCR

D.

Element Manager

Question 14

Which document includes a complete list of tools used to perform a VxBlock 1000 upgrade?

Options:

A.

Converged Systems Administration Guide

B.

Converged Systems Expansion Guide

C.

Converged Systems Architecture Guide

D.

Converged Systems Physical Build Guide

Question 15

Based on the Dell EMC RCM Workbook upgrade plan, in what sequence should VxBlock components be upgraded?

as

Options:

Question 16

What is the responsibility of the Implementation Specialist during the deployment cycle?

Options:

A.

Physically uncrate VxBlock racks and acclimatize

B.

Perform inter-rack cabling

C.

Execute test plan and validation

D.

Create the Site and Logical Configuration Surveys

Question 17

What is the block size of the OneFS operating system?

Options:

A.

32 KB

B.

64 KB

C.

8 KB

D.

16 KB

Question 18

A System Engineer is working on an implementation of the VxBlock 1000. What is a required task in the final implementation step during the Deployment Phase?

Options:

A.

Verify system physical configuration against LCS

B.

Execute the agreed-upon test plan

C.

Configure Cisco Smart Call Home

D.

Connect to individual Element Managers

Question 19

What is the recommended source to download a Test Plan for a specific VxBlock model?

Options:

C.

DellEMC Support

D.

SolVe Online

Question 20

In addition to the Final Test Plan and Customer Satisfaction Survey, what document/form is required to be signed by the customer at the Project Closure Meeting?

Options:

A.

Milestone Completion Form

B.

Final Project Signoff

C.

Project Workbook

D.

Project Feedback Form

Question 21

A customer engineer is unable to securely connect to vCenter using their laptop. Both the vCenter and the customer laptop are behind a firewall. The network security teamrequests that the customer engineer provide source and destination port numbers to establish the needed connection.

What ranges of source and destination port numbers are valid?

Options:

A.

Source port: 49152 - 65535

Destination port: 442

B.

Source port: 1024 - 49151

Destination port: 442

C.

Source port: 1 - 65535

Destination port: 443

D.

Source port: 49152 - 65535

Destination port: 443

Question 22

A System Engineer is validating system cabling for a VxBlock 1000. They find that some ports on Fabric Interconnects 1A are not connected.

Which connections are missing?

Options:

A.

Network uplinks to Nexus switches

B.

Network uplinks to the customer network

C.

SAN uplinks to MDS switches

D.

Server uplinks to C-Series servers