Question 1

What is the minimum number of nodes required to create a production PowerFlex Management Platform Cluster?

Options:

A.

9

B.

1

C.

5

D.

3

Question 2

Which four prerequisites must be met before deploying PowerFlex on the Management Controller? (Select 4)

Options:

A.

Set up hardware affinity.

B.

Deploy VMware vCenter.

C.

Install and configure ESXi on the Management Controller.

D.

Deploy and configure the storage VMs.

E.

Configure the switch ports.

F.

Configure VM HA and DRS.

Question 3

Where are DNS server records configured when deploying the PowerFlex Management Controller VMs?

Options:

A.

hosts

B.

Config

C.

Routes

D.

ifcfg-eth<#>