Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: dumps65

Esri EADP19-001 Dumps

Page: 1 / 9
Total 93 questions

ArcGIS Desktop Professional 19-001 Questions and Answers

Question 1

A water utility company had received calls fromseveral customers complaining oflow water pressure.

Using a geometric network representing the water network, how can an ArcGIS user determine the most likely location of the problem?

Options:

A.

place junction flags on each customer water meter and use the Find Common Ancestors trace task

B.

place junction flags on each customer water meter and use the Find Disconnected trace task

C.

place a junction barrier on each customer water meter and use the Trace Upstream trace task

D.

place a junction barrier on each customer water meter and use the Find Path upstream trace task

Question 2

Which purpose does synchronization serve in a multiuser editing environment?

Options:

A.

manages relationship class rules in both parent and child geodatabases

B.

defines a fitter area in which changes are recognized

C.

reconciles and posts changes to a child or parent geodatabase

D.

creates replicas for editing by end users

Question 3

An ArcGIS user runs a geoprocessing tool and wants to create code in the Python window that repeats the process. In which two ways can the user generate Python code from the results window? (Choose two)

Options:

A.

copy a tool as Python snippet and paste it into the Python window

B.

copy an environment setting value into the Python window

C.

copy and paste messages to the Python window

D.

drag a previously executed tool to the Python window

Question 4

When is an ArcGIS user required to convert a triangulated irregular network (TIN) surface of elevation to a raster?

Options:

A.

when generating contours

B.

when extracting slope information

C.

when creating the steepest path

D.

when performing map algebra

Question 5

An ArcGlS user has high-resolution single-band data and another raster datasetthat is multiband with lower resolution. Which process is used to convert the single-band data to multi-band, while retaining its resolution?

Options:

A.

stack bands

B.

NDVI

C.

pan sharpen

D.

visualize

Question 6

A layer tiding simple symbology is causing slow drawing performance at a scale where analysis needs to be conducted. Only certain features from this layer are necessary in order for analysis to be completed by the ArcGlS user

What can the user do to increase drawing performance?

Options:

A.

reproject the layer

B.

run the MXD doctor on the map document

C.

apply a definition query

D.

set a scale range to hide the layer

Question 7

What is the most efficient way for an ArcGlS user to modify the projection for data in a non- standard coordinate system (undefined in ArcGlS) to align with data in a standard coordinate system?

Options:

A.

modify central meridian

B.

modify standard parallel 1 and standard parallel 2

C.

select a different datum

D.

modify false easting and false northing

Question 8

The ArcGIS user is given data for the Arctic and is asked to perform various types of analysis using the data. The data extends from the North Pole south to 70 degrees North Latitude Data layers may contain points lines, or polygons, and include ice surveys from NOAA depth contours: continental margins, locations of known and suspected oil reserves, endangered species habitat, and territorial boundaries for nations having Arctic coastline.

Which map projection should be used for the data to allow the most accurate buffering of those areas, in order to comply with the U.S court decision that ships may not approach closer than 20 nautical miles to a seal rookery?

Options:

A.

azimuthai equidistant

B.

polar stereographic

C.

gnomonic

D.

Lambert azimuthal

Question 9

An ArsGIS user has a Python script to synchronize a geodatabase with large numbers of updates from the server. Why does the ArcGIS user benefit from scheduling the synchronization process through Task Scheduler?

Options:

A.

The Windows Task Scheduler runs the script automatically and can be set to run during off peak hours

B.

The Windows Task Scheduler prompts if there are any data validation errors and logs them in a text file

C.

The Windows Task Scheduler prompts if the server is not available and logs server errors in a text file

D.

The Windows Task Scheduler validates the script and opens it in a default debugging environment

Question 10

An ArcGIS user has multiple tables that must be input into a single model. What can the user add to the model to automate the model to run on all tables?

Options:

A.

Environment variable

B.

Iterator

C.

parameter variable

D.

precondition

Question 11

An ArcGIS user is tasked with creating a map of the state of Utah displaying all the rivers for a conservation group. The conservation group is only interested in seeing rivers longer than 15 miles, where the longer rivers appear thicker using graduated symbols.

What are two ways the ArcGIS user can eliminate rivers less than 5 miles in length from appearing in the map? (Choose two)

Options:

A.

Build a label expression

B.

Built a data exclusion expression

C.

Build a definition query

D.

Build a layer expression

Question 12

An ArcGIS user is making a map and needs to symbolize cliff and escarpment features above contour features. How can the features be ordered correctly if they are all in the same layer?

Options:

A.

set a definition query

B.

use symbol level drawing

C.

use scale-dependent drawing

D.

reorder the symbols in the symbology properties

Question 13

An analyst has a multi band raster, but needs just one of the bands for a project. Which geoprocessing tool should be used to extract a single band?

Options:

A.

Slice (3D Analyst)

B.

Extract by Attributes (Spatial Analyst)

C.

Composite Bands (Data Management)

D.

Clip (Data Management)

Page: 1 / 9
Total 93 questions