Summer Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: wrap60

Exin CDCS Dumps

Page: 1 / 12
Total 120 questions

EXIN EPI Certified Data Centre Specialist Questions and Answers

Question 1

Where should perforated tiles be installed?

Options:

A.

At the back of racks

B.

Every 5th rack

C.

One tile per rack in front

D.

As close to AC as possible

Question 2

A new facility requires electrical distribution of 100A to be installed in the computer room, 1 m (3 ft) above sensitive IT equipment. What type of system minimizes EMF impact?

Options:

A.

Install single-phase power cabling

B.

Install three-phase power cabling based on three individual core wires

C.

Install bus bar trunking

D.

Install three-phase power cabling based on a combined cable (e.g., XLPE)

Question 3

Which formula is correct?

Options:

A.

Phase-to-Neutral Voltage = Phase-to-Phase voltage * 1.732

B.

Phase-to-Neutral Voltage = Phase-to-Phase voltage /1.732

C.

Phase-to-Neutral Voltage = Phase-to-Neutral voltage * 1.732

D.

Phase-to-Neutral Voltage = (Phase-to-Phase voltage * 1.732) / Phase-to-Neutral Voltage

Question 4

Can you install a raised floor tight to the perimeter of the room?

Options:

A.

Yes, but only if the data center is located in Zone 0 with no or little seismic activity

B.

Yes, a raised floor needs to be installed tight to the perimeter to prevent air leakage

C.

No, to avoid damage to the raised floor due to building and hygrothermal movement

D.

No, but this applies only to raised floors with a height of over 90 cm (3 ft)

Question 5

Which efficiency indicator accounts for all cooling costs (installation, operation, disposal)?

Options:

A.

HER

B.

COP

C.

PUE

D.

LCC

Question 6

Which class of UPS is ideal for data centers?

Options:

A.

VFD (Voltage and Frequency Dependent)

B.

VI (Voltage Independent)

C.

VFI (Voltage and Frequency Independent)

D.

First class

Question 7

In which stage of the data center life cycle does commissioning take place?

Options:

A.

Retire

B.

Operate/optimize

C.

Implement

D.

Design

Question 8

When designing a data center network, your company wants to minimize the number of network switches to manage.

What type of physical cabling layout would be the best choice?

Options:

A.

ToR (Top of Rack) design

B.

EoR (End of Row) design

C.

Star network design using coaxial cables

D.

It does not matter as the number of switches is not influenced by the physical cabling layout

Question 9

The air intake of the mission-critical server at the top of the rack is measuring 25 °C/77 °F.

Is this acceptable?

Options:

A.

Yes, this is allowed according to the standards and guidelines

B.

As long as it does not exceed the average server room temperature of 38 °C/100 °F

C.

Depends on the ANSI/TIA-942 Rating the data center needs to comply with

D.

No, the temperature needs to be 20 °C/68 °F

Question 10

The building requires sprinklers and is equipped with a wet-pipe system. What action should you recommend for the computer room?

Options:

A.

Maintain the current wet-pipe system

B.

Replace the wet-pipe system with a deluge system

C.

Replace the wet-pipe system with a pre-action system

D.

Replace the wet-pipe system with a dry-pipe system

Question 11

You want to make cooling more effective by setting cold aisle temperature to 4 °C (39 °F). Is this acceptable?

Options:

A.

Yes, but only if cooling systems can maintain this continuously

B.

Yes, as long as dewpoint doesn’t go below -9 °C (16 °F)

C.

No, 4 °C (39 °F) is below the allowable ASHRAE range

D.

No, intake air must be exactly 20 °C (68 °F)

Question 12

The temperature in the computer room is being increased from 18°C/64°F to 27°C/81°F.

What is the impact, if any, on the amount of gas required to suppress a fire assuming the gas is a Halocarbon?

Options:

A.

The amount of gas required will be higher

B.

The amount of gas required will not change

C.

The amount of gas required will be lower

D.

The change to the amount of gas cannot be determined without knowing the change in humidity as well

Question 13

What is the focus of the Open Compute Project (OCP)?

Options:

A.

Saving energy, materials, and costs

B.

Standardizing equipment only for hyperscale data centers

C.

Developing an open-source operating system

D.

Making cloud computing more accessible

Question 14

A sprinkler system employs automatic sprinklers attached to a piping system containing water and connected to a water supply so that water discharges immediately when a head opens. What is this called?

Options:

A.

Dry pipe system

B.

Deluge system

C.

Pre-action system

D.

Wet pipe system

Question 15

EMF shielding material needs to be installed as EMF levels from the transformer room into the computer room are measured at 100 mG. The transformer room is ~10 meters away, separated by a corridor. Where should shielding be installed?

Options:

A.

It does not matter; either close to the transformer room or computer room is okay

B.

As close as possible to the transformer room

C.

As close as possible to the computer room

D.

Shielding is not required as 100 mG is within acceptable levels

Question 16

An MCB needs to be installed in the PDU of an air-conditioner unit.

Which breaking curve should you select?

Options:

A.

D-Curve

B.

C-Curve

C.

B-Curve

D.

A-Curve

Question 17

ICT rack consumes 3 kW with ΔT ~11 °C (20 °F). Calculate required airflow (CFM).

Options:

A.

~1,500 CFM

B.

~1,000 CFM

C.

~500 CFM

D.

~160 CFM

Question 18

Should aerosol cleaning solutions be used in the computer room?

Options:

A.

No, unless leak detection installed

B.

No, it will contaminate the room

C.

Yes, only if room smells bad

D.

Yes, if not connected to power

Question 19

What is needed to determine the Relative Humidity (RH)?

Options:

A.

Wet bulb temperature, local atmospheric pressure, and calculator

B.

Dry bulb temperature, airflow, and conversion table

C.

Cold surface with dew collection counter

D.

Dry bulb temperature, wet bulb temperature, and psychrometric chart

Question 20

You want to manage temperature and humidity only at the facility level in your data center. All servers use front-to-rear airflow. Which location for measurement should you recommend?

Options:

A.

At the back/rear of the server at 50 mm (2 in)

B.

At 1.5 m (5 ft) above the floor, 0.4 m (15 in) in front of the rack

C.

At the front/intake of the server at 50 mm (2 in)

D.

At 1.5 m (5 ft) above the floor, 0.4 m (15 in) at the back of the rack

Question 21

Management requests a 15-minute battery bank at full UPS load. UPS specs:

    30 kVA, PF 0.8

    Battery 384 V (192 cells), end discharge 308 V

    Inverter PF 0.8, 400 V output

What information is missing to perform the calculation?

Options:

A.

UPS efficiency

B.

Inverter efficiency / output PF

C.

Load imbalance

D.

Available battery charging current

Question 22

A data center is in an area where utility power is highly available—only a few outages per year, typically <1 hour per event and <50 hours/year not available. What type of generators should be installed?

Options:

A.

Continuous generators in at least N+1

B.

A combination of standby, prime, and continuous sized to 500% of the load

C.

Standby generators; no N+1 needed as the risk of a failure to start is negligible

D.

Standby generators, ideally in an N+1 configuration

Question 23

A data center has its own power supply from the public utility and receives chilled water supply from the building owner.

What needs to be taken into consideration when calculating the PUE?

Options:

A.

Nothing, as the chiller plant in the building also uses electrical power

B.

You will need to take the value for COP of the chiller plant into consideration

C.

You will need to take a weight factor of 0.4 for district chilled water into consideration

D.

PUE calculations are not possible in shared buildings

Question 24

Where should raised-floor installation start?

Options:

A.

Point A (entrance corner)

B.

Point B (side wall)

C.

Point C (center of the room)

D.

Point D (corner opposite entrance)

Question 25

What precaution shall be taken for cabling leading into an equipment rack when a data center is in a seismic-prone area?

Options:

A.

Cables should be loosely organized to allow for movement and be latched at the connectors.

B.

Cables shall be tightly organized to the rack and trays to avoid movement.

C.

Cables can be organized in any way as it is not important.

D.

Cables should be replaced by busbar trunking.

Question 26

The UPS of a data center, with an ANSI/TIA-942 Rating-4, is installed with the rectifier connected to power feed A and the bypass/reserve line input connected to power feed B.

To which feed will the output of the UPS be synchronized?

Options:

A.

The UPS will not synchronize to any of the feeds but use an internal clock to set the output voltage and frequency

B.

Depends on the setting of the UPS, as the UPS can normally be set to either feed

C.

Feed A

D.

Feed B

Question 27

The UPS of a data center with ANSI/TIA-942 Rating-4 is installed with the rectifier connected to power feed A and the bypass/reserve input connected to power feed B. To which feed will the UPS output be synchronized?

Options:

A.

Feed A

B.

Feed B

C.

The UPS will not synchronize to any feed but use an internal clock

D.

Depends on UPS settings, as it can be set to either feed

Question 28

What is a potential disadvantage of using a hypoxic-based fire suppression system as a fire extinguishing system?

Options:

A.

It can only be used in computer rooms which have sufficient air changes per hour.

B.

The gas containers need to be close to the hazard area.

C.

It can only be used in non-continuous occupied areas.

D.

It can only be used in computer rooms where you have sufficient positive pressure.

Question 29

Do you need to consider blast protection when designing a data center?

Options:

A.

No, there is no reason for implementing blast protection as nobody can predict the impact of a bomb explosion.

B.

Yes, if the data center is a potential target or the building is located within the vicinity of (close by) a potential target.

C.

No, blast protection is not a requirement of ANSI/TIA-942.

D.

Yes, blast protection is a requirement of ANSI/TIA-942.

Question 30

A computer room needs to be fitted out with a gas-based fire suppression system. The computer room will be a high-density data center with about 30% of the racks being closed circuit cooling blade-center racks.

Should the supplier of the fire suppression system be informed on the design of the racks?

Options:

A.

No, cooling and design of racks have no influence on the fire suppression system design.

B.

Only when the rack height obstructs a potential fire suppression release point.

C.

Yes, the design of the racks has an influence on the fire suppression system design.

D.

Only when the racks might block access to the fire panel.

Question 31

What is the redundancy setup shown in the diagram?

Options:

A.

2+N+1

B.

N+2

C.

N+N+N

D.

2(N+1)

Question 32

How is the PUE ratio calculated?

Options:

A.

Total Facility Power ÷ Total ICT Equipment Power

B.

Total ICT Equipment Power ÷ Total Facility Power

C.

Total UPS Input Power ÷ Total UPS Output Power

D.

Total Air Conditioner Input Power ÷ Total Air Conditioner Output Power

Question 33

What is the risk of high levels of hydrogen sulfide (H₂S) in the computer room?

Options:

A.

There is no risk

B.

H₂S impacts the static properties of the floor

C.

H₂S can cause corrosion which impacts reliability of equipment

D.

H₂S impacts gas-based fire suppression system operation

Question 34

FM-200 is phasing out as a halocarbon gas and management has decided to replace this with the more environmentally friendly Novec-1230 gas. Should you use exactly the same formula and parameters to calculate the gas content for the Novec-1230 gas?

Options:

A.

Yes, as long as the temperature in the computer room has not changed

B.

Yes, if you take the difference between the net and gross volume into account

C.

Yes, as long as you use the same units of measure (kg/m³ or lbs/ft³)

D.

Yes, if you change the S-factor of the formula to reflect the gas type used

Question 35

Smoke sensors need to be tested to ensure that they pick up a potential fire in the data center.

What should you recommend?

Options:

A.

Test the sensors by injecting smoke or simulated smoke directly into the sensor

B.

Press the self-test button on each sensor in the data center

C.

Inject smoke at the floor level

D.

Test the sensors according to the vendor specification

Question 36

The temperature in the computer room is increased from 18 °C (64 °F) to 27 °C (81 °F). What is the impact on the amount of gas required to suppress a fire assuming a halocarbon agent?

Options:

A.

The amount of gas required will be higher

B.

The amount of gas required will not change

C.

The amount of gas required will be less

D.

The change cannot be determined without knowing the change in humidity as well

Page: 1 / 12
Total 120 questions