Black Friday Biggest Discount Flat 70% Offer - Ends in 0d 00h 00m 00s - Coupon code: 70diswrap

Hitachi HQT-4180 Dumps

Page: 1 / 4
Total 35 questions

Hitachi Vantara Qualified Professional - VSP Midrange Family Installation Questions and Answers

Question 1

You need to replace a failing power supply (PS) in a VSP E590.

What is the correct procedure?

Options:

A.

Check if the status of the PS is blocked, and if yes, then replace it directly.

B.

Use the Maintenance Utility for blocking the PS, then replace it.

C.

Use the Maintenance Utility for blocking the controller, then replace the PS.

D.

Use the MPC for blocking the PS, then replace it.

Question 2

You need to upgrade the firmware on a VSP G700.

Which file must you select to perform the upgrade using the Maintenance Utility?

Options:

A.

All Firmware.mda

B.

HA-MPC-xx.iso

C.

HA-SVP-xx.iso

D.

setup.exe

Question 3

Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.

What should you do next?

Options:

A.

Enable Port Security.

B.

Enable Host Group security.

C.

Create a Host Group.

D.

Scan for all WWNs.

Question 4

What are two consequences when a “New Installation” procedure is performed on a VSP Midrange system? (Choose two.)

Options:

A.

The SVP drive is formatted.

B.

The MPC software is updated.

C.

All the data on RAID groups is lost.

D.

The license keys are deleted.

Question 5

Which two actions can be performed with Hitachi Ops Center Administrator? (Choose two.)

Options:

A.

Perform Self-Service Maintenance.

B.

Manage virtual storage machines.

C.

Manage multiple VSP Midrange storage systems.

D.

Configure the Hitachi Remote Ops Monitor Agent.

Page: 1 / 4
Total 35 questions