Black Friday Biggest Discount Flat 70% Offer - Ends in 0d 00h 00m 00s - Coupon code: 70diswrap

Hitachi HQT-4420 Dumps

Page: 1 / 3
Total 34 questions

Hitachi Vantara Qualified Professional - Content Platform Installation Questions and Answers

Question 1

A customer is using a four-node HCP G10 cluster and they would like to upgrade to eight nodes.

Which two node models can be used to upgrade the cluster? (Choose two.)

Options:

A.

Compute Rack 210H

B.

G10

C.

G11

D.

S10

Question 2

What are two supported speed combinations for the Front-End and Back-End networks of an HCP G11? (Choose two.)

Options:

A.

Front-End 10 GbE SFP+ and Back-End 1 GbE Base-T

B.

Front-End 10 GbE SFP+ and Back-End 10 GbE SFP+

C.

Front-End 25 GbE SFP+ and Back-End 10 GbE SFP+

D.

Front-End 40 GbE SFP+ and Back-End 10 GbE SFP+

Question 3

Which two statements are true about the HCP G10 SSD option? (Choose two.)

Options:

A.

Two SSD disks are installed at the rear of the server

B.

Six SSD disks are installed in the front of the server

C.

Software RAID1 is used to mirror the disks

D.

Hardware RAID6 is used to ensure fault tolerance.

Question 4

Which traffic type is allowed on the HCP back-end network?

Options:

A.

BMC access

B.

access to the Tenant Management Console

C.

inter-node communication

D.

replication traffic

Question 5

Which two VMware deployment packages are supported by HCP systems running v7.2 or later? (Choose two.)

Options:

A.

HCP VMware edition

B.

HCP VMware edition with S10 VM

C.

HCP VMware evaluation edition

D.

HCP VMware with SAN option

Question 6

You are performing an online upgrade of an HCP G10 and the upgrade fails.

Which log is available to assist troubleshooting?

Options:

A.

Syslog

B.

Rollback logs

C.

Simple Trace log

D.

Arc-deploy logs

Question 7

Which two statements are correct regarding hardware upgrades on an HCP G10 system? (Choose two.)

Options:

A.

Mixed clusters consistingof both G10 servers and CR servers are not allowed

B.

Node additions are performed using the Configuration menu of the HCP setup program

C.

Upgrades can be performed online or offline

D.

Data is automatically rebalanced after upgrade

Question 8

How should the RAID group(s) and logical volume(s) be configured on an HCP G10 node with six internal drives?

Options:

A.

a single RAID group with a single logical volume

B.

a single RAID group with three logical volumes.

C.

three RAID groups each with a single logical volume

D.

three RAID groups each with three logical volumes

Question 9

Your customer has tested a new HCP G10 with an S10 node and they now want to re-install the S10 node before turning it into production.

What are three requirements? (Choose three.)

Options:

A.

The S10 node must be retired in the HCP G10 System Management Console

B.

The S10 node must be disconnected from the HCP G10 cluster

C.

The S10 node must boot the installation package from the USB drive

D.

The Genesis build must be manually started on the S10 node

E.

The first-time setup wizard must be completed on the S10 node

Question 10

You are installing an HCP G10 and need to connect to the node using PuTTY after you have installed the OS.

What is used to forward the SSH keys?

Options:

A.

Proxy server

B.

Polaris

C.

Pelican

D.

Pageant

Page: 1 / 3
Total 34 questions