New Year Biggest Discount Flat 70% Offer - Ends in 0d 00h 00m 00s - Coupon code: 70diswrap

HP HPE0-S59 Dumps

Page: 1 / 10
Total 104 questions

HPE Compute Solutions Questions and Answers

Question 1

Which statement about the HPE OneView Update Readiness Checker is true?

Options:

A.

It can be used to verify compatibility of a given Synergy Service Pack with a specific version of HPE OneView.

B.

It can be used to evaluate the health of an HPE OneView appliance before proceeding with an appliance update.

C.

It can be used to examine the firmware version installed on compute nodes and compliance with HPE OneView version.

D.

It can be used to determine whether the latest milestone HPE OneView edition is currently installed.

Question 2

Your customer plans to setup an HPE Synergy solution based on SY480 Gen10 compute nodes with the following connectivity options - SAS connectivity installed in the first fabric - FC connectivity Installed In the second fabric - Ethernet connectivity installed in the third fabric.

Which statement regarding this setup is true?

Options:

A.

Each compute node must have at least 768GB of memory installed

B.

Interconnect modules that provide SAS connectivity should be moved to the third fabric

C.

Each interconnect module in each fabric must be properly licensed in HPE OneView

D.

Compute nodes must have a second CPU installed to access the second fabric.

Question 3

Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They plan to use Distributed Switches and DRS cluster

You are preparing a proposal with the following components:

- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules

- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy

- an appropriate number of the vSphere Standard licenses for each compute node

- one HPE D3940 Storage Modules with 40 SSDs - all required cables and options

Which statement about this proposal is true?

Options:

A.

One HPE Virtual Connect SE 100Gb F32 Module for Synergy should be replaced with 50GD/S ILM

B.

vSphere Standard licenses should be replaced with Enterprise Pius licenses to enable requested features

C.

2 additional HPE Synergy 480 Gen10 Plus compute modules can be added to this setup

D.

20 SSD drives should be removed from this setup, as D3940 supports only 20 SSD or SAS drive.

Question 4

An administrator tries to open iLO interlace from HPE OneView Instead of being automatically logged in a login prompt displays

Where should you start the troubleshooting process?

Options:

A.

At the iLO interface to verify whether the ILO Advanced license is properly applied

B.

At HPE OneView Interface to verify whether the server is In the maintenance mode

C.

At the iLO interface to verify whether the SSO certificate is removed from an iLO.

D.

At HPE OneView Interface to verify whether the iLO processor is disabled

Question 5

Your customer experienced some problems caused by outdated HPE Superdome Flex firmware. Which update method should they use to avoid these issues in the future?

Options:

A.

HPE OneView method for I/O firmware update procedure

B.

RMC CLI to update I/O and HPE Persistent Memory firmware

C.

HPE OneView IT HPE Persistent Memory firmware must be updated.

D.

HPE SUM if HPE Persistent Memory firmware must be updated

Question 6

Click the option that will allow you to change the ESXI image used In an OS Deployment Plan.

as

Options:

Question 7

Your customer plans to deploy HPE Superdome Flex and configure two nPars, each based on two chassis Which components must be included in the proposal to meet the customer’s needs?

Options:

A.

Rack Management Controller for nPar management

B.

HPE Superdome Flex Grid licenses enabling connectivity between chassis

C.

At least Tour HPE Persistent Memory DIMMs per nPar

D.

One base chassis and three expansion chassis with licenses

Question 8

You are troubleshooting an HPE OneView server profile that presents a critical state. The server profile was configured with a Link Aggregation Group

What should you check to fix the issue?

Options:

A.

if both FiexNICs are configured with the same speed

B.

If the logical enclosure is built on at least three HPE Synergy frames

C.

if both FiexNICs are connected to different networks

D.

if the logical enclosure is configured with redundant master modules

Question 9

You configured a virtual machine cluster using the HPE Storage Integration Pack for VMware vCenter.

Click the option in the SSMC main menu that you can use to verify whether a virtual storage operation is properly created on HPE Primera or 3PAR.

as

Options:

Question 10

You need to configure a RoCE network to enable lossless networking for HPE J2000 Flash Enclosure support Which interconnects are required to support this connection? (Select two.)

Options:

A.

HPE Virtual Connect SE 40Gb F8 Module for HPE Synergy

B.

HPE Virtual Connect SE 16Gb FC Module for HPE Synergy

C.

HPE Virtual Connect SE 100Gb F32 Module for HPE Synergy

D.

HPE Virtual Connect SE 32Gb FC Module for HPE Synergy

E.

Brocade 16Gb Fibfe Channel SAN Switch Module for HPE Synergy

F.

Brocade 32Gb Fibre Channel SAN Switch Module for HPE Synergy

Question 11

Which statement about port flap protection is true?

Options:

A.

It can disable link aggregation groups or stacking ports that have gone down and come up in quick succession.

B.

It allows an administrator to suppress excessive inbound multicast, broadcast, and DLF packets.

C.

It allows configuration of hardware Layer 2 switching behavior of multicast traffic to optimize network resource usage.

D.

It allows the creation of LACP groups on the upstream switch that span multiple HPE Synergy Virtual Connect modules.

Question 12

Which statement about a new HPE SimpliVity deployment is true?

Options:

A.

New HPE SimpliVity deployments gives customer flexible choice of hypervisor

B.

A new HPE SimpliVity node can be a member of multiple dusters

C.

AM new HPE SimpliVity models are software optimized

D.

All new HPE SimpliVity models are based on mid CPUs

Question 13

Which statement about HPE OneView milestone releases is true?

Options:

A.

A milestone release is a release which must be installed on HPE Composer to support current version of the Service Pack for Synergy

B.

A milestone release is a release that is published when HPE releases new hardware components to immediately support new systems

C.

A milestone release is available for selected partners that give access to HPE OneView features which are not officially announced.

D.

A milestone release is a release with an enhanced update architecture mat is a prerequisite prior to updating to a subsequent release.

Question 14

What is a restriction of using a RoCE network?

Options:

A.

This network type does not support sFlow and remote port monitoring.

B.

This network type does not support the smart link and private network features.

C.

This network type is not supported with HPE Virtual Connect SE 100Gb F8 Module for HPE Synergy.

D.

This network type by default is configured as untagged network and cannot be a part of a network set.

Question 15

Your customer plans to deploy HPE OneView for VMware vCenter Server together with HPE Storage Integration Pack for VMware vCenter. The customer wants to use them to manage HPE Synergy Gen10 compute modules. HPE ProLiant Gen 10 servers and an MSA array.

Which statement about compatibility of the existing environment with the planned software components is true?

Options:

A.

Both HPE Synergy Gen10 full-height compute module plugins will require a license

B.

HPE OneView for VMware vCenter Server does not support standalone HPE ProLiant servers

C.

To use the required plugins HPE ProLiant Gen10 systems must be managed using HPE OneView

D.

HPE Storage integration Pack for VMware vCenter does not support MSA arrays

Question 16

Match each HPE OneView network type with its definition.

as

Options:

Question 17

Click the area within the management interface that will allow you to check whether an HPE OneView SSO certificate is properly applied.

as

Options:

Question 18

Your customer wants to add dedicated Fibre Channel connectivity to the HPE Synergy frame running HPE Synergy 480 Gen10 compute modules, each with one CPU socket populated Currently they use two 12 Gb SAS switches and two HPE Virtual Connect SE 100Gb F32 Modules for HPE Synergy installed in third fabric.

What must be done to enable dedicated FC connectivity for this HPE Synergy frame?

Options:

A.

A second CPU must be installed for all HPE Synergy 480 Gen10 compute nodes.

B.

For Brocade switches, a logical interconnect group must be created in HPE OneView.

C.

For VC-FC modules, all of server facing ports must be property licensed.

D.

SAS switches must be moved to second fabric and FC modules Installed in the first one.

Question 19

As a result of the troubleshooting process, you recommend replacing, HPE Synergy Composer modules which HPE Synergy Composer 2

Why would you recommend this change?

Options:

A.

HPE Composer 1 running HPE OneView 5 2 or later can support only 12 frames within a single management nog

B.

HPE Composer 2 can support more than the maximum 21 frames that are supported with HPE Composer 1 and HPE OneView.

C.

HPE Composer 2 provides access to 105 interface that can be used for full management of HPE Composer 2 remotely

D.

HPE Composer 1 cannot support remote frames, which doubles the configuration and management procedures effort

Question 20

Click the port on the Frame Link Module which is used to include an HPE Synergy frame in the management ring.

as

Options:

Question 21

After HPE Superdome Flex deployment and nPar setup, you need to verify health status of HPE Superdome Flex components.

Put the steps on the left into the coned order on the right to perform this task.

as

Options:

Question 22

Which statement about the HPE D3940 storage module is true?

Options:

A.

Only one type of drives (SATA, SAS, SSD) can be installed in each module.

B.

It is configured through CLI available from HPE Synergy console.

C.

SATA drives require redundant IO adapters to be installed in this module.

D.

Up to five modules can be installed in a single frame with Gen10 servers.

Question 23

Refer to the exhibit.

as

Which statement about this logical interconnect group is true?

Options:

A.

The master modules are located in the interconnect bays 2 and 5

B.

For the given downlink speed, the maximum number of frames is reached

C.

Both master modules are located in the same HPE Synergy frame

D.

To use interconnect bay set 3, all compute nodes must be half-height

Question 24

Your customer plans to deploy HPE OneView for VMware vCenter Server together with HPE Storage Integration Pack for VMware vCenter.

The customer wants to use them to manage HPE Synergy Gen10 compute modules, HPE ProLiant Gen10 servers, and an MSA array.

Which statement about compatibility of the existing environment with the planned software components is true?

Options:

A.

Both HPE Synergy Gen10 full-height compute modules plugins will require a license.

B.

HPE OneView for VMware vCenter Server does not support standalone HPE ProLiant servers.

C.

Not all of HPE Storage Integration Pack for VMware vCenter features are supported with MSA arrays.

D.

HPE ProLiant Gen10 systems require HPE OneView for VMware vCenter server licenses for each node.

Question 25

Your customer wants to compare HPE Superdome Flex with HPE Superdome Flex 280.

Which statement about these two systems is true?

Options:

A.

Only HPE Superdome Rex 280 can be managed using HPE OneView

B.

Only HPE Superdome Flex supports HPE Persistent Memory

C.

Only HPE Superdome Flex 280 can support multiple nPars

D.

Only HPE Superdome Flex supports 32 sockets and 48TB of memory

Question 26

Your customer has 6 logical enclosures spanning 18 HPE Synergy frames. The customer needs to add one more logical enclosure based on 5 HPE Synergy frames

How will this change impact the customer environment?

Options:

A.

The customer can add a new logical enclosure to the existing setup because the maximum number of logical enclosures in a single management ring is not reached.

B.

The customer has to expand the management ring capacity either by adding HPE Composer 2 modules or adding memory to reach 128GB per module.

C.

The customer has to create a new management ring for new logical enclosure because the maximum number of frames m a single management ring is reached.

D.

The customer can add a new logical enclosure to an existing setup once all required licenses are added to HPE OneView and associated with the new frames.

Question 27

Which statement about a new HPE SimpliVity deployment is true?

Options:

A.

New HPE SimpliVity deployments give customer flexible choice of hypervisor

B.

All new HPE SimpliVity models are based on AMD CPUs

C.

All new HPE SimpliVity models support deduplication and compression

D.

New HPE SimpliVity deployments are licensed per node not per physical socket

Question 28

After deploying HPE Superdome Flex 280 you need to check Core Analysis Engine (CAE) Log.

Click the appropriate section in the HPE Superdome Flex 280 management interface that will allow you to complete this task.

as

Options:

Question 29

When should Private Network be enabled?

Options:

A.

When a customer needs the ability to create a network dedicated to a single compute node.

B.

When a customer needs additional network security by limiting traffic flow for the given network.

C.

When a customer needs a heartbeat network between two compute nodes for building a cluster.

D.

When a customer needs each port associated with a given uplink set to be 100Gb/s.

Question 30

Your customer is implementing an HPE Synergy solution based on three frames.

Click each of the ports that can be used to connect satellite modules.

as

Options:

Question 31

The proposal consists of.

- 3 HPE Synergy 12000 frames

- 6 HPE Composer 2 modules

- 2 HPE Virtual Connect SE 100 GO F32 Module

- 4 HPE Synergy 50 GO interconnect Link Module

Which statements about this proposed design are true? (Select two.)

Options:

A.

The selected interconnect modules do not provide the requested WWN virtualization

B.

HPE Synergy 50Gb ILMs must be replaced with HPE Virtual Connect SE 100 GO F32 modules

C.

The current setup can support up to 18 HPE Synergy 480 Gen10 Plus compute modules

D.

FC upgrade licenses for HPE Virtual Connect SE 100 GbF32 Module must be added

E.

Remove 4 HPE Composer 2 modules from the design, as they are not required

Page: 1 / 10
Total 104 questions