New Year Biggest Discount Flat 70% Offer - Ends in 0d 00h 00m 00s - Coupon code: 70diswrap

HP HPE0-S60 Dumps

Page: 1 / 8
Total 79 questions

Delta - HPE Compute Solutions Questions and Answers

Question 1

After HPE Superdome Flex deployment and nPar setup, you need to verify health status of HPE Superdome Flex components.

Put the steps on the left into the coned order on the right to perform this task.

Options:

Question 2

Your customer plans to deploy HPE OneView for VMware vCenter Server together with HPE Storage Integration Pack for VMware vCenter. The customer wants to use them to manage HPE Synergy Gen10 compute modules. HPE ProLiant Gen 10 servers and an MSA array.

Which statement about compatibility of the existing environment with the planned software components is true?

Options:

A.

Both HPE Synergy Gen10 full-height compute module plugins will require a license

B.

HPE OneView for VMware vCenter Server does not support standalone HPE ProLiant servers

C.

To use the required plugins HPE ProLiant Gen10 systems must be managed using HPE OneView

D.

HPE Storage integration Pack for VMware vCenter does not support MSA arrays

Question 3

Which statement about HPE Superdome nPars is true?

Options:

A.

Chassis in the same nPar can have different CPU configuration

B.

Rack Management Controller is required Tor nPar configuration

C.

Chassis in the same nPar can have different memory configuration

D.

nPars are supported only with 3rd Generation Intel Xeon Scalable Processors

Question 4

Your customer plans to expand an existing nPar based on a single HPE Superdome Flex chassis. Which statement about workload availability during expansion is true?

Options:

A.

Powered nPar can be expanded only if HPE Superdome Flex 280 is used

B.

Online expansion is available only if RMC is used for management.

C.

HPE Superdome Flex does not support expansion of powered on nPars

D.

Powered nPar can be expanded if it does not use HPE Persistent Memory

Question 5

What is one of me benefits of using HPE Composer 2?

Options:

A.

HPE Composer 2 has 128GB of memory and 4 AMD CPUs to improve performance of me management system

B.

HPE Composer 2 modules are required to manage HPE virtual Connect SE 100GD F32 Modules for Synergy

C.

The administrator can access an HPE Synergy Composer 2 appliance remotely to perform First Time Setup

D.

A pair of HPE Composer 2 modules can manage 42 frames, compared to 21 frames managed by HPE Composer

Question 6

Which statement about a new HPE SimpliVity deployment is true?

Options:

A.

New HPE SimpliVity deployments gives customer flexible choice of hypervisor

B.

A new HPE SimpliVity node can be a member of multiple dusters

C.

AM new HPE SimpliVity models are software optimized

D.

All new HPE SimpliVity models are based on mid CPUs

Question 7

Your customer experienced some problems caused by outdated HPE Superdome Flex firmware. Which update method should they use to avoid these issues in the future?

Options:

A.

HPE OneView method for I/O firmware update procedure

B.

RMC CLI to update I/O and HPE Persistent Memory firmware

C.

HPE OneView IT HPE Persistent Memory firmware must be updated.

D.

HPE SUM if HPE Persistent Memory firmware must be updated

Question 8

Your customer plans to deploy VMware vSAN using D3940 Storage Modules.

Which statement about this solution is true?

Options:

A.

The 12Gb SAS modules required for D3940 connectivity can only be installed in the first fabric.

B.

To use the storage controller that will access D3940 storage modules, a second CPU must be installed.

C.

For VMware vSAN deployment, all drives in the D3940 storage modules must be SSD drives.

D.

All drives in the D3940 storage modules must formulate a single logical drive with RAID5 configured

Question 9

Match each HPE OneView network type with its definition.

Options:

Question 10

Refer to the exhibit.

as

Which statement about this logical JBOD is true?

Options:

A.

This logical JBOD can be connected to multiple systems to formulate a snared datastore.

B.

After deleting this logical JBOD drives will he blocked for 12h m case this JBOD must be re-created

C.

After deleting this logical JBOD, its drives w not be available until a clean-up procedure 6 done

D.

This logical JBOD can be presented to the compute nodes in a different frame.

Question 11

Which statement about HPE Apollo 2000 Gen10 Plus platform is true?

Options:

A.

It is equipped with HPE Persistent memory by default

B.

It can support a single processor only and up to 4 per chassis

C.

It is fully managed using HPE OneView including all connections

D.

It offers servers with AMD EPYC and Intel Xeon Scalable CPUs

Question 12

You are troubleshooting an HPE OneView server profile that presents a critical state. The server profile was configured with a Link Aggregation Group

What should you check to fix the issue?

Options:

A.

if both FiexNICs are configured with the same speed

B.

If the logical enclosure is built on at least three HPE Synergy frames

C.

if both FiexNICs are connected to different networks

D.

if the logical enclosure is configured with redundant master modules

Question 13

Which statement about an HPE Oneview support dump is true?

Options:

A.

Appliance support dump by default contains a logical enclosure support dump

B.

Support dump is a binary file that can be opened only in a dedicated application

C.

Support dump can be created if HPE Virtual Connect modules are installed in the frame

D.

Preview support dump is available only when creating an appliance support dump

Question 14

Your customer added a new Ethernet network in HPE Oneview mat is used to manage their HPE Synergy platform.

When the customer tries to connect one of the compute nodes to this network through the server profile, this network is not available.

What must be done to fix this issue?

Options:

A.

Check the Logical Enclosure settings and verify if the maximum number of networks allowed for this LE is reached.

B.

To make this network available to use in the server profile, the customer must enable the Smart Link feature within network definition.

C.

The newly created network must be added to the uplink set within the LIG, and Logical interconnect configuration must be updated from the LIG.

D.

Check within the server profile which server hardware is used and perform the Refresh operation on this compute node to get the latest adapter information.

Question 15

Your customer has a logical enclosure configured using a angle HPE Synergy frame with the following configuration

- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy

- two HPE Synergy Virtual Connect SE 32Gb FC Modules -12 HPE Synergy 480 Gen10 Plus compute nodes with appropriate mezzanine cards

They plan to add a new HPE Synergy frame to an existing logical enclosure with the following configuration

- two HPE Synergy Virtual Connect SE 32Gb FC Modules

- two HPE Synergy 20Gb interconnect Link Modules

- Eight HPE Synergy 480 Gen 10 Plus compute nodes with appropriate mezzanine cards

Which statement about the planned configuration change is true?

Options:

A.

Four compute modules must be moved to the second frame to balance the configuration

B.

The two HPE Synergy 20Gb interconnect Link Modules must be replace with the 50Gb option

C.

A license for an extended logical enclosure must be added to HPE OneView through GUI

D.

The HPE Synergy virtual Connect SE 32Gb FC Modules from both frames should be stacked

Question 16

Click the area within the iLO management interface that will allow you to access workload Advisor.

as

Options:

Question 17

Your customer plans to deploy VMware ESXi 7. 0 U2, and they are looking for a hardware platform that will allow them to use up to 16 CPU sockets

Which HPE compute system meets the customer requirements?

Options:

A.

HPE ProLiant DL580 Gen10

B.

HPE ProLiant OL380 Gen 10 Plus

C.

HPE Synergy 480 Gen10 Plus

D.

HPE Superdome Flex system

Question 18

Your customer plans to use HPE Primera to boot HPE Synergy compute nodes. They currently have two HPE Virtual Connect SE 100Gb F32 Module for Synergy modules installed in the frame. The customer wants to use FC as a storage access protocol

What must be done to complete this task?

Options:

A.

Enable FC primary and secondary boot on the modules through the HPE OneView interface

B.

FC connectivity on the modules should be enabled through the service console by disabling FCoE.

C.

Add FC upgrade licenses in HPE OneView that will enable FC connectivity for the modules

D.

Enter both modules into a maintenance mode, then enable FC connectivity through CLI

Question 19

You plan to configure a Link Aggregation Group (LAG) for two connections within a server profile for a compute node running an ESXI system.

What is required from the VMware side to enable LAG?

Options:

A.

Virtual Distributed Switch

B.

vSphere Standard license

C.

Load balancing cluster

D.

Dedicated VMKernel port

Question 20

The proposal consists of.

- 3 HPE Synergy 12000 frames

- 6 HPE Composer 2 modules

- 2 HPE Virtual Connect SE 100 GO F32 Module

- 4 HPE Synergy 50 GO interconnect Link Module

Which statements about this proposed design are true? (Select two.)

Options:

A.

The selected interconnect modules do not provide the requested WWN virtualization

B.

HPE Synergy 50Gb ILMs must be replaced with HPE Virtual Connect SE 100 GO F32 modules

C.

The current setup can support up to 18 HPE Synergy 480 Gen10 Plus compute modules

D.

FC upgrade licenses for HPE Virtual Connect SE 100 GbF32 Module must be added

E.

Remove 4 HPE Composer 2 modules from the design, as they are not required

Question 21

Which statement about HPE Superdome Flex 280 is true?

Options:

A.

It supports 2 to 8 sockets in 2-socket increments.

B.

it cannot be managed using HPE OneView.

C.

It must be equipped with at least 768 GB of memory.

D.

It can support up to two nPars with an external RMC.

Question 22

After deploying HPE Superdome Flex 280 you need to check Core Analysis Engine (CAE) Log.

Click the appropriate section in the HPE Superdome Flex 280 management interface that will allow you to complete this task.

as

Options:

Question 23

Which HPE Virtual Connect feature allows an administrator to suppress excessive inbound multicast broadcast and destination lookup failure (OLF) packets?

Options:

A.

Pause flood protection

B.

Loop protection

C.

LLDP tagging

D.

Storm control

Page: 1 / 8
Total 79 questions