Question 1

In the Item Master application can an item be associated with a meter?

Options:

A.

It can be associated with all items.

B.

A meter field can only be associated with rotating items.

C.

It cannot be associated with any item.

D.

A meter field can only be associated with non-rotating items.

Question 2

A client has a requirement to manage access permits and risk assessments in Maximo. Which add-on provides this capability?

Options:

A.

Maximo Safety

B.

Maximo Health Safety and Environment

C.

Maximo Asset Configuration Manager (ACM)

D.

Maximo Spatial

Question 3

What three types of periods can be defined for a Budget Monitoring record? (Choose three.)

Options:

A.

Financial Periods

B.

A period defined with a start date and end date.

C.

Month

D.

Quarter

E.

Year

F.

Budget Period

Question 4

If additional attributes are added to the Work View, how can they be automatically updated from changes made to a corresponding Ticket and Work Order fields?

Options:

A.

by modifying the existing Crossover Domains TKT2WV or W02WV

B.

by adding a Crossover Domain to TICKETID or WONUM

C.

by updating the existing Cron Task UpdateWorkView that has two instances TKT2WV and W02WV that use the Crossover Domains of the same name

D.

by modifying the existing Object Launch Point automation script UpdateWV

Question 5

In which three applications can a failure class be applied? (Choose three.)

Options:

A.

Work Order Tracking

B.

Job Plans

C.

Locations

D.

Item Masters

E.

Tools

F.

Assets

Question 6

In the Work Order Tracking application when the Create Work Order action is used, what occurs on the follow-up Work Order?

Options:

A.

The Asset and Location fields are cleared.

B.

The Originating Record field is populated.

C.

The Work Type field is cleared.

D.

The Status is set to INPRG.

Question 7

How can a Master Preventive Maintenance record be associated with multiple non-rotating assets?

Options:

A.

Use the Move/Modify Assets action.

B.

Use an Asset Template.

C.

Add the Assets to the Multiple Assets table on the Master Preventive Maintenance record.

D.

Use the Apply Down Hierarchy action on the Master Preventive Maintenance record.

Question 8

In which two places can Service Request Categories be created for use in the Service Request Work Center?

Options:

A.

Classifications Application

B.

Administration Work Center

C.

Business Analysis Work Cen

D.

Service Desk Application

E.

Service Catalog Application

Question 9

In the Work Order Tracking application, a Work Order is generated from a Preventive Maintenance (PM) record. How is the target finish date calculated?

Options:

A.

the Job Plan finish date

B.

the PM target finish date

C.

the Work Order target start date + the Job Plan duration

D.

the Job Plan start date + the Job Plan duration

Question 10

Which statement is true regarding Master Preventative Maintenance (PM) records?

Options:

A.

Associated PM records can only be created for a rotating item's asset.

B.

Associated PM records can be created for a Master PM which does not have an item

C.

Associated PM records are temporary and expire after 90 days.

D.

Associated PM records can only be created for a rotating item's location.

Question 11

On a Work Order with no GL Account specified, which GL Account will take precedence?

Options:

A.

Work Order Control Account

B.

Job Plan

C.

Asset

D.

Location

Question 12

In the Purchase Orders application, what is the result of the action Complete Receipts?

Options:

A.

It will set the Receipt status to COMPLETE, but will not create the receipt lines.

B.

It will send a notification to the requester that the Purchase Order has been completed.

C.

It will set the Receipt status to COMPLETE and create the receiving lines for the remaining items.

D.

The status of the Purchase Order will be changed to CLOSED.

Question 13

Which limit is used to trigger a Condition Monitoring Point with a GAUGE Meter Type?

Options:

A.

Meter Limit

B.

Warning Limit

C.

Measurement Limit

D.

Action Limit -

Question 14

In the Budget Monitoring application, where are the budget amounts entered?

Options:

A.

Budget Line

B.

Budget Record

C.

Budget Rules

D.

Focal Point

Question 15

At which data storage level are locations, assets and storerooms defined?

Options:

A.

Set

B.

Site

C.

System

D.

Organization

Question 16

What combination of information on a Work Order is used to create a histogram in the Graphical Scheduling application?

Options:

A.

Craft/Skill Level Quantity and Hours

B.

Labor and Crew Hours

C.

Craft Quantity and Hours

D.

Crew Work Group Quantity and Hours

Question 17

Which two events can be triggered from a Condition Monitoring Point? (Choose two.)

Options:

A.

Creation of a Work Order with a Job Plan applied.

B.

Triggering a meter rolldown.

C.

Creation of an Unscheduled Inspection.

D.

Triggering of a Preventive Maintenance record.

E.

Creation of a Service Request.

Question 18

What are three integration End Points Handlers available in Maximo Manage?

Options:

A.

XMLFILE

B.

XLS

C.

EMAIL

D.

WSDL

E.

FLATFILE

F.

KAFKA

Question 19

Which type of inspection can be created in the Conduct an Inspection Work Center?

Options:

A.

Group

B.

Conditional

C.

Preventive Maintenance

D.

Unscheduled

Question 20

Which three Safety Module applications require a Site (SITEID) to be defined for each record? (Choose three.)

Options:

A.

Accident Reporting

B.

Danger Zones

C.

Tag Outs

D.

Safety Plans

E.

Hazards

F.

Precautions

Question 21

Select all that apply

What is the priority order for selecting a Safety Plan when a Job Plan is applied to a Work Order?

as

Options:

Question 22

In the Manage Inventory Work Center a pick list can be created, its initial status is Entered. Which three actions will cause the status to change to in Progress? (Choose three.)

Options:

A.

Picked

B.

Restocked

C.

Prepared

D.

Issued

E.

Staged

F.

Returned

Question 23

Which data storage level provides the sharing of items and company data across multiple organizations?

Options:

A.

SET

B.

SITE

C.

ORG

D.

SYSTEM

Question 24

Which two statuses of a Purchase Order will allow a receipt of new items to be processed in the Receiving application if the Purchase Order is not being revised?

Options:

A.

APPR

B.

HOLD

C.

INPRG

D.

REVISD

E.

PNDREV

Question 25

When using flow control on a Work Order, how ca from the Parent to Child Work Orders?

user ensure that Work Order status changes are inherited

Options:

A.

Check the Inherit Status Changes flag on the Work Order and ensure the mxe.app.wo.flowControlStatuslnheritance System Properties is set to 1.

B.

In the Organization application, check the Intarit Status Changes flag in Work Order Options -> Flow Control Options.

C.

Ensure the Asset or Location

on both the Parent and Child Work Order.

D.

Check the Roll Down Status Changes flag on the Parent and Child Work Order.

Question 26

How many failure reports can be created for the same Work Order?

Options:

A.

one failure report for the work order and only one for each task of the work order

B.

unlimited failure reports for either a work order or any of its tasks

C.

unlimited failure reports for each work order, but none for a task

D.

just one failure report

Question 27

Which two records can be included as a contract line item on a Lease/Rental Contract?

Options:

A.

Non-Rotating Asset

B.

Rotating item

C.

Asset

D.

Tool

E.

Non-Rotating item

Question 28

A user wishes to perform the same work tasks on several assets simultaneously. How can this be configured?

Options:

A.

A Route should be created with each stop being one Asset and the Job Plan associated with the Route record.

B.

A Master Job Plan should be created with Tasks for each Asset.

C.

A Work Order Hierarchy should be created against the same Job Plan used for all stops.

D.

The Assets should be specified on the Multiple Assets, Locations and CIs table on the Work Order.

Question 29

In the Organizations application, which action is used to create Inventory Usage documents for new reservations?

Options:

A.

Inventory Usage Options

B.

Inventory Options

C.

Work Order Options

D.

Reservation Options

Question 30

What are three statuses used in the Service Requests application? (Choose three.)

Options:

A.

COMPLETED

B.

ENTERED

C.

RESOLVED

D.

QUEUED

E.

APPROVED

F.

PENDING

Question 31

Apart from Standard and Average, what other three costing methods can be used in the Inventory application?

Options:

A.

FIFO

B.

FILO

C.

Asset

D.

LIFO

E.

Weighted Average

F.

LILO

Question 32

Which statement is true regarding Work Assets in the Safety Plans application?

Options:

A.

A Work Asset is either a Location or an Asset. A user does not need to specify Work Assets, as a Safety Plan can be applied without it.

B.

A Work Asset is either a Location or an Asset. A user needs to specify at least one of these for each record.

C.

A Work Asset is either a Rotating Item, a Location, or an Asset. A user needs to specify at least one of these for each record.

D.

A Work Asset is either an Asset, Asset Type, or a Location. A user does not need to specify Work Assets, as a Safety Plan can be applied without it.

Question 33

What are the three default classes of a Ticket?

Options:

A.

Problem

B.

Activity

C.

Service Request

D.

Change

E.

Incident

F.

Release

Question 34

In the Inventory Usage application when the type is TRANSFER, if a user changes the status to COMPLETE what type of transaction record is created?

Options:

A.

Transaction Type RETURN in MATUSETRANS table

B.

Transaction Type ISSUE in MATUSETRANS table

C.

Transaction Type SHIPTRANSFER in MATRECTRANS table

D.

Transaction Type TRANSFER in MATRECTRANS table

Question 35

When setting up a Crew Type, Required Crafts and Required Tools can be specified. What other characteristic can be required for the Crew Type?

Options:

A.

Required Assets

B.

Required Qualifications

C.

Required Labor

D.

Required Skills

Page: 1 / 12