Question 1

Which of the following stages of a project defines the number of risks and opportunities, including intense planning and anticipation of risk events?

Options:

A.

Planning

B.

Executing

C.

Initiation

D.

Closing

Question 2

Which of the following roles approves the project scope statement, phase gate reviews, solution validations, scope changes, and project success criteria?

Options:

A.

Project manager

B.

Subject matter expert

C.

Solution owner

D.

Stakeholder

Question 3

Which of the following represents the duration of activities against a calendar?

Options:

A.

Scatter chart

B.

Gantt chart

C.

Pie chart

D.

Pareto chart

Question 4

A business analyst (BA) has been writing requirements for a project that has several stakeholders with varying levels of product expertise.

What must the BA take into consideration to meet stakeholder perspectives?

Options:

A.

The competency of individual stakeholders

B.

The format of the requirements

C.

The types of diagrams produced

D.

The level of decomposition needed

Question 5

Which of the following is responsible for preparing the business architecture, feasibility studies, and business cases?

Options:

A.

Security Administrator

B.

Developer

C.

Business analyst

D.

Project leader

Question 6

Which of the following techniques involves coordinating and collaborating with other credible sources in risk?

Options:

A.

Risk identification

B.

Risk management

C.

Risk communication

D.

Risk analysis

Question 7

Which of the following participants have to keep the minutes and details of the conversation during Interviews?

Options:

A.

Stakeholder

B.

Scribe

C.

Business Analyst

D.

End user

Question 8

Whilst working on business requirements to improve a process, a business analyst (BA) has created flowcharts from the viewpoint of several different users. The stakeholders have expressed some confusion because the flows seem inconsistent.

What ensures that the process models relate to each other?

Options:

A.

Roles and Permissions Matrix

B.

Organizational Model

C.

Future State Description

D.

Information Architecture

Question 9

A business analyst (BA) is working on a stakeholder collaboration plan. The main goal is to select the approaches that work best to meet the needs of external and internal stakeholders.

Which aspects should be taken into account?

Options:

A.

Collaboration skills of BA

B.

Solution design

C.

Timing and frequency of collaboration

D.

Business governance plan

Question 10

In a software implementation project, the designated business analyst (BA) has conducted all the elicitation activities and now needs to confirm the elicitation results.

What is used by the BA Professional to guide which sources of information and which results are to be compared?

Options:

A.

Information management approach

B.

Business analysis plan

C.

Elicitation activity plan

D.

Business analysis approach

Question 11

Which of the following roles works with the project team to understand the deliverables and then teaches the users of the deliverables how to utilize the project's product?

Options:

A.

End user

B.

Database analyst

C.

Stakeholder

D.

Trainer

Question 12

Which of the following is the process of defining and analyzing the dangers to individuals, businesses, and government agencies posed by potential natural and human-caused adverse events?

Options:

A.

Risk analysis

B.

Risk identification

C.

Risk management

D.

Risk communication

Question 13

The business analyst (BA) is facilitating a requirements workshop with a large group of diverse stakeholders, some of whom are not entirely familiar with the goals and objectives of the project.

The BA must understand the business domain, corporate culture, group dynamics, and expected outputs to adequately communicate the:

Options:

A.

change strategy.

B.

requirements prioritization.

C.

elicitation scope.

D.

enterprise architecture.

Question 14

Which of the following is not a hygiene agent according to Frederick Herzberg theory?

Options:

A.

The chance to excel

B.

Job security

C.

A paycheck

D.

Clean and safe working conditions

Question 15

Which of the following qualitative techniques involves a disciplined analysis of the event sequences that could transform a potential hazard into an accident?

Options:

A.

Failure mode and effects criticality analysis

B.

HAZOP technique

C.

Failure mode and effects analysis

D.

Preliminary Risk Analysis

Question 16

Which of the following component of the communication model is responsible for transferring the message between two or more entities?

Options:

A.

Sender

B.

Medium

C.

Decoder

D.

Receiver

Question 17

Which of the following requires that all parties in the conflict must give up something?

Options:

A.

Barrier

B.

Problem solving

C.

Withdrawal

D.

Compromising

Question 18

In a requirements elicitation effort, the business analyst (BA) needs to define boundaries for business domains, categorize and create a hierarchy of items, and show data sources and their relationships for specific audiences.

Which of the following modeling formats should the BA use?

Options:

A.

Diagrams

B.

Graphics

C.

Matrices

D.

Prototype

Question 19

The business analyst (BA) has been tasked with assessing and recommending the best solution that fits an organization's need for a new third-party sales tool.

What technique would be used for identifying suitable options?

Options:

A.

Balanced scorecard

B.

Decision analysis

C.

Vendor assessment

D.

Process analysis

Question 20

Which of the following establishes organizational checks and balances with a proper segregation of front, back, and middle office functions for effective risk management?

Options:

A.

Risk response plan

B.

Risk analysis

C.

Risk management plan

D.

Risk governance

Question 21

A software company has won a contract to implement its product for a client. As part of the implementation work, a business analyst (BA) is asked to elicit information about the other client applications that will interface with the new system and provide the information graphically. The technical staff needs to understand the message interaction within the systems for key business transactions.

Which type of diagram should the BA use?

Options:

A.

Process

B.

Sequence

C.

Activity

D.

Context

Question 22

Which of the following is the process of developing a document that formally authorizes a project or a phase?

Options:

A.

Define Scope

B.

Develop Schedule

C.

Develop Project Charter

D.

Create Work Breakdown Structure

Question 23

The business sponsor of a project to automate a high risk, high profile process has expressed concerns that some activities people perform will be missed. The business analyst (BA) has already created a process flow with associated user stories.

Which of the following actions will address the sponsor’s concerns?

Options:

A.

Record the concerns in the risk register

B.

Schedule a formal review with the stakeholders

C.

Demonstrate traceability to the business case

D.

Review the final approved elicitation results

Question 24

Which of the following defines how the project scope should be created, executed, monitored and controlled, and then validated?

Options:

A.

Scope variance plan

B.

Scope management plan

C.

Staffing management plan

D.

Schedule management plan

Question 25

A multi-domain project has stakeholders with different technical backgrounds. The presentation prepared by the business analyst (BA) for domain 1 was also used for domain 2 but the presentation was not clear and caused concerns for stakeholders in domain 2.

What can the BA do to alleviate the concerns of the stakeholders in domain 2?

Options:

A.

Create a survey applicable for the stakeholders in domain 2.

B.

Produce an estimation applicable for the stakeholders in domain 2.

C.

Present a model applicable for the stakeholders in domain 2.

D.

Develop a backlog applicable for the stakeholders in domain 2.

Question 26

An innovative pizza restaurant announces a new pizza topping each week. Once advertised, the new topping on the regular dough constitutes the sole pizza type offered during the week. No other pizza toppings are offered.

Which of the following processes is a strong candidate to be addressed while planning for requirements reuse?

Options:

A.

Dough preparation

B.

Toppings preparation

C.

Topping recipes

D.

Ad images

Question 27

Which of the following diagrams is known as Ishikawa diagram?

Options:

A.

Activity

B.

Data-flow

C.

Cost-Benefit

D.

Cause-and Effect

Question 28

Which of the following process groups occurs at the beginning of the project?

Options:

A.

Executing

B.

Planning

C.

Initiating

D.

Controlling and Monitoring

E.

Closing

Question 29

Contracts are currently managed by more than 20 contract owners across the organization, each happily managing in their own way. A business analyst (BA) is tasked to elicit requirements for centrally managing software maintenance and license contracts.

Which of the following does the BA need to carry out first?

Options:

A.

Identify business requirements

B.

Identify future state conditions

C.

Recommend an off the shelf product

D.

Complete an enterprise readiness assessment

Question 30

Which of the following tasks cannot start until other tasks are completed?

Options:

A.

Analysis task

B.

Dependent task

C.

Predecessor task

D.

Independent task

Question 31

A business analyst (BA) is eliciting requirements to automate existing manual processes for fulfilling end users service requests. There is pressure from management to automate the process quickly using a commercial off-the-shelf (COTS) tool. The COTS solution has various modules including one for service request automation that has yet to be implemented in the organization. What e the BA's first step?

Options:

A.

Perform a gap analysis to understand missing capabilities

B.

Implement the COTS tool's modules

C.

Modify the COTS tool to fit the existing process

D.

Create a change strategy

Question 32

Following a recent, successful deployment a business analyst (BA) has noticed that several of the requirements are candidates for reuse in multiple, upcoming change initiatives. Which type of requirement is a potential candidate for re-use?

Options:

A.

Transition requirements

B.

Stakeholder requirements

C.

Business requirements

D.

Non-Functional requirements

Question 33

After determining mat the enterprise culture was the driving force behind recent solution change decisions a business analyst (BA) has decided to conduct an enterprise-wide cultural assessment. What information can the 8A expect to learn from the results?

Options:

A.

Whether there will be an organizational impact as a result of the change

B.

That changes to the enterprise culture will better drive its actions

C.

That internal dependencies limit the performance of the entire solution

D.

Whether the stakeholders view the solution as something beneficial

Question 34

A business analyst (BA) is preparing a governance approach. The BA is trying to define the approval process. Which factors should the BA consider?

Options:

A.

The organizational culture and type of information being approved

B.

The associated risks of foregoing or delaying an approval

C.

The formality and rigor of the prioritization process

D.

The solution performance measures

Question 35

The project manager wants to have the requirements analysis phase approved and asks the business analyst (BA) if this is possible The BA wants to ensure that the requirements package

Options:

A.

Solution functional capabilities

B.

Business analysis approach

C.

Solution performance measures

D.

Business analysis information architecture

Question 36

A business analyst (BA) was tasked with eliciting requirements for a new product scheduling system. The BA interviewed and discussed the requirements with the manager and Supervisor. The requirements were written and approved by both the supervise and manager. Which stakeholders were missed in the requirements?

Options:

A.

End users

B.

Project manager

C.

Upper management

D.

IT support

Question 37

A business analyst (BA) is compiling a communication plan by reviewing stakeholders and identifying the needs of the stakeholders. The BA organizes the stakeholders based on their needs and decides that all communication Mil be handled through e-mail so that information can be disseminated quickly and easily while maintaining a record. What has the BA missed in the stakeholder analysts?

Options:

A.

Business objectives

B.

Preferences

C.

Retention

D.

Presentation materials

Question 38

In a risk assessment exercise of a software implementation program, the business analyst (BA) has successfully computed the probability of occurrence (POC) and the cost of impact for each of the identified risks as follows:

as

Which of the following will have the highest negative impact to value?

Options:

A.

Natural disasters

B.

Power surges

C.

Human errors

D.

System security

Question 39

A business analyst (BA) is assessing tie different solution proposals. What type of financial calculation would the BA use to determine which solution is worth investing in based on its breakeven point?

Options:

A.

Discount rate

B.

Net present value

C.

Return on investment

D.

Internal rate of return

Question 40

A business analyst (BA) asks participants in a workshop to write down their ideas about the feature being built on sticky notes place them on the wan and then group the ideas into similar themes. The BA is using, this technique to:

Options:

A.

prioritize requirements.

B.

prepare for requirements elicitation.

C.

identify organizational capabilities.

D.

manage stakeholder collaboration.

Question 41

When determining the success criteria for an initiative a business analyst (BA) engages end users in order to understand what they would define is an effective solution. What two types of data will the end men need to perform the evaluation?

Options:

A.

Assessment and performance

B.

impact and dependencies

C.

Quantitative and qualitative

D.

Risk and value

Question 42

A company is about to embark upon a large organizational change initiative that involves restructuring its service offerings. A senior business analyst (BA) is assigned the work of establishing performance measures for the business analysis work to be performed by the 6A ream. Which of the following performance measures is appropriate to assess the value delivered by the work products against the cost time, and resource investments expended to create them?

Options:

A.

Strategy

B.

Effectiveness

C.

Significance

D.

Knowledge

Question 43

A business analyst (BA) on a project is in the process of validating requirements and finds that there is a high degree of uncertainty related 10 one of the assumptions being true. The BA adds the assumption to the risk register and performs a fun risk analysis to handle this situation. What type of strategy is in place if the organization is risk-averse?

Options:

A.

Acceptance

B.

Transfer

C.

Avoidance

D.

Mitigation

Question 44

A large insurance company wants to buy a new claims processing system or upgrade one of its two existing system. Each year the claims department is given a $3.5 million budget to spend. Time is of the essence since there are tome regulatory charges that will be coming the following year that will require several features that currently neither one of the two claims System currently support.

There are eight stakeholders involved in this initiative. There are local to where the claim system is managed, while five are located across the country. The business analyst (BA) struggled to get all stakeholders to agree on the desired features but ultimately got agreement on ten identified key features for the new claims system. The BA was able to build a current state and future state process model which included all ten key features.

System a processes 75% of the company's claims. It is 5 years old and the claim processors love it because it is easy to use. However, it must go offline for two hours each day. The code is very module so it does have flexibility to be modified. To upgrade system A to have all ten features it would cost $5 million. System A would be at capacity if it were to process all of the company's claims.

System B process 25% of the company's claims. It is an older mainframe system, but rarely goes offline. It could easily handle double the number of claims that system A processes. However, it has a lot of legacy code and would cost $6 million to upgrade.

Both systems have some of the desired key features. But neither system has all ten. The cost to buy a new system would be $7 million.

Below is the estimated cost for each feature in priority order.

as

During elicitation the BA must understand the non-functional requirements. What nonfunctional requirement does System B support over System A?

Options:

A.

Usability

B.

Compatibility

C.

Scalability

D.

Compliance

Question 45

A business analyst (BA) is working on improving solution performance and increasing value. The BA discovers that a set of interfaces and activities do not contribute to the final product either directly or indirectly What should the BA recommend?

Options:

A.

Provide a single solution for stakeholders thus reducing the cost of implementation

B.

Propose an organizational change to automate the work people perform

C.

Remove or minimize interfaces and activities that do not provide value to the final product

D.

Retire the current solution as it is not fulfilling the need for which it was created

Question 46

A business analyst (BA) wants to create a high-level Overview of a business process as a part of an exploratory analysis. The sponsor has asked for a model that demonstrates the movement and transformation of data between entities and processes. What technique should the BA use?

Options:

A.

Entity relationship diagram

B.

Scope modeling

C.

Process modeling

D.

Data flow diagram

Question 47

as

What kind of analysis must the BA do to determine if one of the systems is better suited to be modified and upgraded?

Options:

A.

Risk Analysis

B.

Stakeholder Analysis

C.

Process Analysis

D.

Decision Analysis

Question 48

Due to the complexity of a project the project board a concerned that the business analyst (BA) will not be able to ensure all requirements are verified. What toed can the BA present to the project board to mitigate their concern?

Options:

A.

Data model

B.

Use case diagram

C.

Risk register

D.

Business analysis checklist

Question 49

A business analyst (BA) is assigned to a project which has two main stakeholders: a highly regulated government agency and a less formal private company. To select the business analysis approach, the BA mi! conduct a meeting with representatives from each entity to decide on the level of formally needed for requirements and design specifications. During the meeting, what should the BA’s strategy be?

Options:

A.

Develop consensus on a tailored approach for formality

B.

Use a formal approach to appeal to the government entity's higher authority

C.

Employ the standard business analysis level of formality

D.

Ask the government entity to accept a flexible collaborative approach

Question 50

Manufacturer 0 has received a merger proposal from Manufacturer K There is concern among the senior management of Manufacturer O that regulations could shift in the future, prompting Manufacturer K to move headquarters elsewhere and close operations at the current Manufacturer O site. In assessing the proposal limitations and as part of identifying enterprise limitations, a culture assessment is completed. As part of this work, what else would the BA perform?

Options:

A.

Scope and requirements prioritization

B.

Financial and risk analysis

C.

Organization and functional modelling

D.

Stakeholder impact and operational analysis

Question 51

A business analyst (BA) has completed requirements elicitation and modeling on a project to implement a new case management system. During analysis of the requirements, the BA notices that one of the requirements appears to be in conflict with the company's case management policies. What should the BA do?

Options:

A.

Request modification to the polices and identify the changes as an assumption and a dependency

B.

Create a requirement to indicate the change to the current policies and update the information in the models

C.

Modify the requirements to adhere to the existing policies and note the change in the models

D.

Identify the policies as a potential constraint and review with management

Question 52

A health insurance provider undertakes enhancements to its mobile application platform and finalizes the following capabilities as part of the scope of the next release:

I. Ability to integrate online maps and global positioning system (GPS) technology with the mobile application In real time to display location of service providers in the subscriber's vicinity that participate in the subscriber's plan network.

II. Ability for the subscriber to lookup the service providers by specifying either a postal code or a search area radius in miles.

III. Ability for the subscriber to initiate the download of fee information for one or more service providers in a single request.

Through requirements workshops the business analyst elicits the following detailed business requirements:

1. The company's mobile application platform must support real time integrate with the following third party systems:

A GPS System

B. Postal Code Validation

What is the appropriate model type to assist the stakeholders in testing the performance and visual aspects of requirements 3 through 11?

Options:

A.

Process Model

B.

Concept Model

C.

Usability Prototype

D.

Functional Prototype

Question 53

A business analyst (BA) had identified redundancy in the process for the first contact resolution for customer issues: currently two separate a visions handle this task. A new solution identifies a single point of contact that will eliminate the redundancy. What can the BA do to highlight the required changes to the structure?

Options:

A.

Current state description

B.

Policies and procedures

C.

Business capability analysis

D.

Organizational modeling

Question 54

A busmen analyst (BA) is assigned a new project to improve a delivery process. Which of the following does the BA create as an output of the initial meeting with experts?

Options:

A.

Entity relationship diagram

B.

Elicitation activity plan

C.

Current state flowchart

D.

Information management approach

Question 55

A business analyst (BA) conducts a Business rules analysts exercise to identity the organizational rules constraining the project in addition to existing regulations and contracts. what else does the BA check?

Options:

A.

Backlogs

B.

Policies

C.

Business case

D.

Permissions matrix

Question 56

A business analyst (BA) working on a recently implemented project is approached by the sponsor to provide artifacts that can be used organization wide for the long -term. Which of the following should the BA provide?

Options:

A.

Transition requirements document

B.

Project solution architecture

C.

High-level business requirements document

D.

Process models

Question 57

A large insurance company wants to buy a new claims processing system or upgrade one of its two existing system. Each year the claims department is given a $3.5 million budget to spend. Time is of the essence since there are tome regulatory charges that will be coming the following year that will require several features that currently neither one of the two claims System currently support.

There are eight stakeholders involved in this initiative. There are local to where the claim system are managed, while five are located across the country. The business analyst (BA) struggled to get all stakeholders to agree on the desired features but ultimately got agreement on ten identified key features for the new claims system. The BA was able to build a current state and future state process model which included all ten key features.

System a process 75% of the company's claims. It is 5 years old and the claim processors love it because it is easy to use. However, it must go offline for two hours each day. The code is very module so it does have flexibility to be modified. To upgrade system A to have all ten features it would cost $5 million. System A would be at capacity if it were to process all of the company's claims.

System B process 25% of the company's claims. It is an older mainframe system, but rarely goes offline. It could easily handle double the number of claims that system A processes. However, it has a lot of legacy code and would cost $6 million to upgrade.

Both systems have some of the desired key features. But neither system has all ten. The cost to buy a new system would be $7 million.

Below is the estimated cost for each feature in priority order.

as

If System A is unanimously selected to be the system for upgrade but the technical lead says that System A will have to be taken offline for 3 months, what kind of strategy should the project team develop while system A is offline?

Options:

A.

Organizational

B.

Stakeholder

C.

Change

D.

Competitive

Question 58

The solutes presented by a business analyst (BA) to the stakeholders eliminated the need to maintain different variations of ship-to-country and location-to-rout* for various freight carriers. Instead, the routing would use a standard carrier code, giving the business me flexibility to just ship to new countries without raising a change request to IT. which was the current road-block to business. What opportunity did the BA present to the stakeholders?

Options:

A.

Increase efficiencies

B.

Decrease stakeholder involvement

C.

increase access to information

D.

Decrease project timeline

Question 59

A business analyst (BA) has defined a business analysis approach and presented the documents to the sponsors, the senior executives, the domain experts, the project manager and the head of technology, to obtain agreement from all. At this juncture, the prefect manager objected to some of the estimates determined m the budget and refused to agree with the estimates. Which guideline or tool, if followed by the BA. would have helped in avoiding such disagreements?

Options:

A.

Requirements Classification Schema

B.

Stakeholder Engagement Approach

C.

Risk Analysis and Management

D.

Business Analysis Performance Assessment

Question 60

A company wants to develop a product roadmap to guide future development efforts. The product owner asks a business analyst IBA) to lead the analysis effort. Feature suggestions have been compiled from customer support calls. Which of the following should the BA do first?

Options:

A.

Compare the Implementation costs of each feature

B.

Determine the value of each feature

C.

Prioritize the features in the backlog

D.

Confirm the feature requests

Question 61

A major manufacturer of popular beverages has appointed a local distributor to serve a specific territory. The demand for the beverages has a pronounced seasonal pattern. The distributor performs well overall, but is repeatedly unable to keep up with fulfilling many customer orders during peak demand periods. The distributor's current delivery capability is stretched to deliver 60 tons of merchandise per day whereas the season's peak demand periods need a daily delivery capability of up to 100 tons.

The distributor is under pressure to fully meet the year-round market demand in order to stay in business. The distributor's management wants to identify and consider more cost-effective options as resorting to adding more trucks and drivers would not be economically feasible.

A business analyst (BA) has spent several days observing and measuring the warehouse activities to understand the situation and to gain insights into possible solutions. The delivery workflow is a four-step process: (1) picking the orders and assembling them on trays, (2) bringing the trays to the loading bay, (3) loading the orders into trucks, and (4) delivering the orders to customers. As the following table illustrates, overall performance depends is dependent on five major resources: (1) the workers who pick the orders and load them into trucks, (2) the tallyers who check the orders, (3) the drivers, (4) the trucks, and (5) eight loading bays (LBs).

as

Preparing a customer order for loading takes about one hour. Upon the BA's observation, only 30% of trips have their orders available for loading when a truck arrives. This causes a waste of both the truck's and the driver's time.

What should the BA recommend to eliminate such waste?

Options:

A.

Elicit requirements for a system to coordinate in advance order processing activities with all trips

B.

Begin assembling orders for the next trip immediately following the truck's departure

C.

Hire more warehouse staff (workers) so that order assembly is done faster and less waiting occurs

D.

Ask the drivers to call the operations team member if they are going to be late

Question 62

A financial institution engaged in mortgage lending has embarked on a business process improvement initiative to eliminate the activities that hinder growth to ultimately improve the success rate of its mortgage business. As a benchmark for identification, the institution is keen on improving any business process that has less than a 75% success rate. The institution has appointed a business analyst (BA) to review the business transactions for the processes of origination, payments, and closures, as well as identify opportunities for improvements and recommend solutions.

The BA has collected the following information over the last three months pertaining to these business processes:

•All the business processes are at their maximum capacity in terms of the current number of transactions.

•Each business process has a certain number of rejects and the reasons for rejection include documentation, verification, collateral, and funding. Funding rejects occur when the bank's customers have failed to make payment of their mortgage processing fee or mortgage closure payment.

The BA has also recommended the use of documentation checklists as a solution to eliminate the documentation rejects.

as

If an additional recommendation to reduce Verification Rejects by 50% were to be introduced into the mortgage origination process, what is the potential success rate of the mortgage origination process?

Options:

A.

86%

B.

83%

C.

70%

D.

74%

Question 63

A company with a big information technology (IT) department has hired a lead business analyst (BA) to enhance its business analysis practices. The lead BA discovers that sponsors are not satisfied with project outcomes. Developers complain about incomplete, ambiguous, and changing requirements. All stakeholders, including project managers, are blaming long cycles of analysis for the delays. The business analysts, in turn, feel overwhelmed with the number of projects and frustrated by the lack of collaboration from reviewers of their deliverables. All of the evidence is anecdotal and none of the groups could strongly substantiate their opinions.

The lead BA wants the BAs to report anticipated and actual completion dates for their deliverables, as well as the time spent on planned and unplanned activities. What is the lead BA trying to do by analyzing the results of such measurements?

Options:

A.

Identify typical missing or wasteful activities

B.

Ensure even workloads of the BA

C.

Establish an equitable compensation system

D.

Motivate the BA to work belter

Question 64

The BA is working on the design options for the future state at the martial arts organization. There are several design elements that need to be considered for the future state. Which of the following design elements does the Activity Diagram address?

Options:

A.

People who operate and maintain the solution

B.

Operational business decisions to be made

C.

Business processes to be performed and managed

D.

Business policies and business rules

Question 65

Stakeholders have indicated concerns with the level of uncertainty they are willing to accept with the solution.

What type of analysis can the business analyst (BA) use to alleviate these concerns?

Options:

A.

Gap

B.

Financial

C.

Requirements

D.

Risk

Question 66

A business analyst (BA) is working on a payment system (PS) implementation. A set of systems which should interact with a new system has been identified. The business analyst defined that a user with role of "Supervisor" in the PS must pass a two-factor authentication before an execution of the functions: "Change system parameters" and "Set up new supervisor." A user must have the role of "Supervisor" to use the standard functions "Send mail notification" or "Send SMS notification".

The BA defined the following use cases:

•"Change system parameters"

•"Setup new supervisor"

•"Send mail notification"

•"Send SMS notification"

•"Send notification"

•"Pass a two-factor authentication"

The BA wants to create a Use Case diagram.

Which technique should be used to define a communications protocol between the PS and other systems?

Options:

A.

Vertical prototyping

B.

Interface analysis

C.

Concept modelling

D.

System analysis

Question 67

A company that specialized in manufacturing vending machines for books has been in business for 10 years. As the e-book and online retailing grow, the company perceived that a change is required to respond to the new emerging market forces. However, the change should focus on reusability as much as possible to reduce expenses. After analyzing the current state with the business subject matter experts, the business analyst

(BA) proposed investing in a new business line of vending machines that sell pay per use mobile device phone fast charging stations.

Due to the urgency of this change, the BA was asked to finalize requirements elicitation in the shortest possible time.

By proposing this change, what type of view did the BA use to analyze the current manufacturer's state?

Options:

A.

Data-centric

B.

Capability-centric

C.

Process-centric

D.

People-centric

Question 68

A popular department store chain wants to make computer upgrades as well as conduct a major remodeling effort to increase revenue to all their 100 stores over the next 2 years. The remodeling will occur in two phases. The two phases are required at each store and can be completed in any order, but each phase must be fully completed before the next phase can begin. Phase 1 will take approximately 32 weeks and will not require a store to be temporarily closed. Phase 2 will take approximately 20 weeks and will require a store to be temporarily closed.

In order to keep inventory level and total revenue for the department store chain at an operational level, 75% of the stores must remain open to the public at all times. Against the board of director's advice, the Chief

Executive Officer (CEO) made a decision to start and complete the top 25 revenue-producing stores in the first year to get those stores remodeled and fully operational.

A business analyst (BA) has been brought in to help with planning the project and gathering requirements. Based on the CEO's executive decision, which risk tolerance attitude is the CEO exhibiting?

Options:

A.

Seeking

B.

Avoidance

C.

Mitigation

D.

Neutrality

Question 69

A business analyst (BA) has been assigned to manage the ongoing stakeholder collaboration after completing a project. The BA needs to understand the stakeholders' level of satisfaction and wants to offer stakeholders an opportunity to help improve the working relationships based on this information.

Which technique should the BA use?

Options:

A.

Risk analysis and management

B.

Brainstorming

C.

Collaborative games

D.

Lessons learned

Question 70

A company with a big information technology (IT) department has hired a lead business analyst (BA) to enhance its business analysis practices. The lead BA discovers that sponsors are not satisfied with project outcomes. Developers complain about incomplete, ambiguous, and changing requirements. All stakeholders, including project managers, are blaming long cycles of analysis for the delays. The business analysts, in turn, feel overwhelmed with the number of projects and frustrated by the lack of collaboration from reviewers of their deliverables. All of the evidence is anecdotal and none of the groups could strongly substantiate their opinions.

Even after dozens of reviews, some stakeholders refuse to sign off on the requirements specification documents because of a few questionable requirements. This puts the projects at risk and creates tension between the participants. What should the lead BA do first?

Options:

A.

Escalate the problem to the executive management

B.

Set limits on duration of sign-offs and the number of reviews

C.

Track approvals al the level of individual requirements

D.

Offer the stakeholders incentives to sign off documents sooner

Question 71

A national branch of a global company is struggling to improve business processes of its Public and Government Affairs (PGA) department. To work with external stakeholders effectively, PGA employees need to collect, manage, and exchange a vast amount of information. Complex cases involve collaboration of many employees from different departments. The ability to share information and to coordinate corresponding activities is crucial for the company's growth plans. Their current tools and practices do not serve the purpose well. The existing system, which was deployed a couple of years ago, has only a few active users. The majority of PGA employees avoid using it because the system is hard to use and lacks needed functionality. Consequently, available information is mostly unstructured and stored either locally or on a shared network drive. Some of the information exists only in a paper form.

The branch's PGA head, who sponsors the project, wants to implement a configurable solution that two other branches successfully deployed several months ago. Both deployments were done by three solution consultants, who will be available to assist in the project. They will be responsible for tailoring the solution to PGA needs, as well as for training the PGA staff. With their help, the sponsor plans to complete the project in approximately three months.

The solution consultants reside in another country 7 hours ahead of the rest of the project team. They will be available part-time, but are planning two one-week long trips to the PGA central office to conduct initial training and to participate in the final deployment of the system into production. The consultants, in turn, expect a business analyst (BA) to assist in collecting necessary data and defining customization requirements.

The solution consultants have composed a spreadsheet with all requirements that are already implemented in the solution. The requirements in the catalog are organized partially by user tasks and partially by system features. The branch has distinct definitions of PGA user roles and uses a different approach to structuring requirements specifications.

How should the BA organize the customization requirements?

Options:

A.

Devise a structure that best fits the branch's definition of user roles

B.

Explore and apply best practices for specifying this type of requirements

C.

Reuse the structure of the solution consultants' requirements catalog

D.

Use the structure of requirements suggested by the corporate standard

Question 72

A business analyst (BA) has just completed a number of elicitation activities and is preparing to review the stated requirements. As part of this, the BA is checking the compliance of the stated requirements with organizational standards for business analysis.

What state is the BA attempting to move the requirements into?

Options:

A.

Validated

B.

Verified

C.

Accepted

D.

Specified

Question 73

An organization is trying to streamline its current processes to improve performance and reduce costs. A business analyst (BA) conducted a process improvement workshop and identified the following issues as the top three items to be addressed:

1: There are multiple teams to define systems, functionality, and content in many instances, multiple teams are defining the same functionalities while other functionalities are not being defined at all leading to unclear understanding of business requirements.

2: Product specification forms are published each year. A comparison tool is used to evaluate specification differences between yearly releases; but does not adequately identify changes between versions and needs to be improved.

3: Training consists of a new team member shadowing a seasoned team member. There are no written training materials or formal training sources therefore training is inconsistent and not meeting the needs of the organization.

What analysis approach must the BA use to determine changes required to address the training needs?

Options:

A.

Market

B.

Decision

C.

Root cause

D.

Future state

Question 74

A very large insurer of General Liability and Property Damage insurance has an upward trend of increased claims over the past 5 years.

The Risk Control Area for that company has just completed a 12 month Pilot of a new improved Risk Control Site.

The purpose of the site is to help their customers manage their exposures and ideally prevent them from having claims There were 100 customers that were part of the Pilot that represented 25 different industries. The business goals were to increase use of the site and provide tools to help customer awareness of their exposures, so that they may reduce existing exposures and ultimately reduce claims.

The sites Features were as follows:

* Improvements to the search engine to all customers to search for articles, tools and services on the site

* A checklist function that allow customer to create their own unique Checklists or utilize a sample provided by ABC company to use daily, weekly etc. for an area of their facility.

* A promotion feature - where Risk preventing Articles, and tools on the site are marketed toward a customer.

* A profile section allowing for Customer Name, Address and contact Phone number.

Alter the 12 month pilot the business sponsor received an assessment of what was working and what was not. The Assessment of the pilot revealed overall site activity had significantly increased, however only 5% of the time the promotions were viewed. And the most shocking was that total claims increased by nearly 20% for these 100 customers during the pilot period. The business sponsor was perplexed as he had an expectation of reduced claims and at least for 30% viewing of promotions since the project team had spent a lot of careful time and effort on this feature. A BA was assigned to do further analysis regarding the low use of the promotions and why claims were not being reduced.

Regarding the use of promotions the BA looked into other similar companies to see what they did differently to get their customer to look at their promotions. The BA found that similar companies had promotions that targeted the industry the customer was in so it was more relevant to them and they were more interested to view the promotion. In addition the BA sent out a survey to all 100 pilot customers asking probing questions about what they thought of the site and if they felt it had decreased their exposure to risk sufficiently. The Survey responses came back with raving positive comments and providing examples of how the site had been helping in the reduction of claims from the customer's perspective. In addition the survey also revealed insight that the customers found the promotion often irrelevant to their industry.

The BA asked for a dump of all documentation of the 1000 claims that were filed over the 12 month pilot period. The BA found the nearly 90% of the claim filed were all in one region of the country and were all for property damage related to several severe winter storms in the region and the claims were nearly all unavoidable by the customers. The BA brought all this analysis back to the business sponsor and made the recommendation to the business sponsor to require the customer to select 1 of 25 industries in their profile. This would in turn allow for the ability to show industry specific promotions and promote search results relative to a customer's industry to be sorted at the top giving the customer a more personalized experience.

What technique was the BA using to understand why the promotions were not being viewed?

Options:

A.

Use cases and scenarios

B.

Benchmarking and market analysis

C.

Observation

D.

Data mining

Question 75

A very large insurer of General Liability and Property Damage insurance has an upward trend of increased claims over the past 5 years.

The Risk Control Area for that company has just completed a 12 month Pilot of a new improved Risk Control Site.

The purpose of the site is to help their customers manage their exposures and ideally prevent them from having claims There were 100 customers that were part of the Pilot that represented 25 different industries. The business goals were to increase use of the site and provide tools to help customer awareness of their exposures, so that they may reduce existing exposures and ultimately reduce claims.

The sites Features were as follows:

* Improvements to the search engine to all customers to search for articles, tools and services on the site

* A checklist function that allow customer to create their own unique Checklists or utilize a sample provided by ABC company to use daily, weekly etc for an area of their facility.

* A promotion feature - where Risk preventing Articles, and tools on the site are marketed toward a customer.

* A profile section allowing for Customer Name, Address and contact Phone number.

Alter the 12 month pilot the business sponsor received an assessment of what was working and what was not. The Assessment of the pilot revealed overall site activity had significantly increased, however only 5% of the time the promotions were viewed. And the most shocking was that total claims increased by nearly 20% for these 100 customers during the pilot period. The business sponsor was perplexed as he had an expectation of reduced claims and at least for 30% viewing of promotions since the project team had spent a lot of careful time and effort on this feature. A BA was assigned to do further analysis regarding the low use of the promotions and why claims were not being reduced.

Regarding the use of promotions the BA looked into other similar companies to see what they did differently to get their customer to look at their promotions. The BA found that similar companies had promotions that targeted the industry the customer was in so it was more relevant to them and they were more interested to view the promotion. In addition the BA sent out a survey to all 100 pilot customers asking probing questions about what they thought of the site and if they felt it had decreased their exposure to risk sufficiently. The Survey responses came back with raving positive comments and providing examples of how the site had been helping in the reduction of claims from the customer's perspective. In addition the survey also revealed insight that the customers found the promotion often irrelevant to their industry.

The BA asked for a dump of all documentation of the 1000 claims that were filed over the 12 month pilot period. The BA found the nearly 90% of the claim filed were all in one region of the country and were all for property damage related to several severe winter storms in the region and the claims were nearly all unavoidable by the customers. The BA brought all this analysis back to the business sponsor and made the recommendation to the business sponsor to require the customer to select 1 of 25 industries in their profile. This would in turn allow for the ability to show industry specific promotions and promote search results relative to a customer's industry to be sorted at the top giving the customer a more personalized experience.

What was the business sponsor looking to validate about the use of promotions?

Options:

A.

Accuracy

B.

Performance Variance

C.

Market Trends

D.

Risks

Question 76

A popular department store chain wants to make computer upgrades as well as conduct a major remodeling effort to increase revenue to all their 100 stores over the next 2 years. The remodeling will occur in two phases. The two phases are required at each store and can be completed in any order, but each phase must be fully completed before the next phase can begin. Phase 1 will take approximately 32 weeks and will not require a store to be temporarily closed. Phase 2 will take approximately 20 weeks and will require a store to be temporarily closed.

In order to keep inventory level and total revenue for the department store chain at an operational level, 75% of the stores must remain open to the public at all times. Against the board of director's advice, the Chief

Executive Officer (CEO) made a decision to start and complete the top 25 revenue-producing stores in the first year to get those stores remodeled and fully operational.

A business analyst (BA) has been brought in to help with planning the project and gathering requirements. What activity should the BA do to determine which stores will be the first to start the renovations?

Options:

A.

Perform document analysis for stores annual records

B.

Survey store managers for number of customers per day

C.

Conduct a focus group with store managers to determine which should be first

D.

Brainstorm with store managers on the current state of each store

Question 77

A business analyst (BA) is reviewing the performance results from a recent change initiative. One of the results stated, "The planned schedule expected 50% of the project to be done at milestone 6. The schedule performance index (SPI) was .87. Three project team members worked overtime to ensure that the actual schedule would align with the planned schedule."

This is an example of what type of action?

Options:

A.

Engagement

B.

Preventive

C.

Corrective

D.

Improvement

Question 78

The technology team at a financial institution has successfully constructed a software application to be deployed as part of a digital banking strategy. A business analyst (BA) has completed a review of the current state description and now needs to evaluate the solution and determine limiting factors for value realization.

What additional input is required to perform the assessment of enterprise limitations?

Options:

A.

Operational assessment

B.

Potential value

C.

Solution performance analysis

D.

Organizational structure

Question 79

As part of identifying an enterprise's capability to adopt a potential solution, a business analyst (BA) is reviewing existing processes and tools within the enterprise for their ability to adapt to a new solution.

Which of the following assessments is the BA performing?

Options:

A.

Stakeholder

B.

Enterprise

C.

Organizational

D.

Operational

Question 80

A financial institution engaged in mortgage lending has embarked on a business process improvement initiative to eliminate the activities that hinder growth to ultimately improve the success rate of its mortgage business. As a benchmark for identification, the institution is keen on improving any business process that has less than a 75% success rate. The institution has appointed a business analyst (BA) to review the business transactions for the processes of origination, payments, and closures, as well as identify opportunities for improvements and recommend solutions.

The BA has collected the following information over the last three months pertaining to these business processes:

•All the business processes are at their maximum capacity in terms of the current number of transactions.

•Each business process has a certain number of rejects and the reasons for rejection include documentation, verification, collateral, and funding. Funding rejects occur when the bank's customers have failed to make payment of their mortgage processing fee or mortgage closure payment.

The BA has also recommended the use of documentation checklists as a solution to eliminate the documentation rejects.

as

Assuming the BA's recommendation to be true, what will be the new success rate of the mortgage closure process?

Options:

A.

90%

B.

85%

C.

10%

D.

20%

Question 81

A business analyst (BA) was presenting requirements to all stakeholders, after having reviewed, structured and organized the requirements. The requirements were being presented in the form of multi layered business process models, using standard notations with proper sequencing of tasks. During the presentation, the project manager points out a few of the missing, inconsistent, and contradictory requirements.

What did the BA fail to perform?

Options:

A.

Use template architecture

B.

Develop the solution scope

C.

Accommodate requirement viewpoints

D.

Ensure completeness

Question 82

A software development company is in the process of creating a new product for their customer base. It has been several years since such a project has been initiated and the organization has created a new team to own and develop the product. The project team will be evaluated by the successful adoption of the product, which will be developed over the next 12 months.

The team's business analyst (BA) has analyzed the current state in partnership with the product owner and has been meeting with senior management to identify the goals that need to be attained. A broad view of the business has been analyzed in order to have an understanding of how the company is currently providing value to its customer base.

What has the BA evaluated to help determine value of the project?

Options:

A.

Internal assets

B.

External influencers

C.

Change strategy

D.

Business architecture

Question 83

A leading software manufacturing company has appointed a business analyst (BA) to ensure that requirements are managed effectively and efficiently. The BA discovered some missing functionality as well as some implemented functionality which are not supported by requirements.

Which of the following tasks did the BA use to discover the issues?

Options:

A.

Define requirements architecture

B.

Elicit requirements again

C.

Evaluate requirement changes

D.

Trace requirements

Question 84

A business analyst (BA) has been given a defect during user acceptance testing. After analyzing the defect, the BA determines it is a change in the requirement.

What does the BA need to do to assess the change?

Options:

A.

Close the defect "working as designed"

B.

Evaluate the risk analysis and management information

C.

Perform a root cause analysis

D.

Conduct an impact analysis using traceability

Question 85

Company A is a nation-wide leader in commercial demolition. Having just celebrated its 100th year of operations, the company decided to begin doing work internationally. The current system used for reporting company finances is unable to keep pace with the potential demands of doing work in geographically dispersed locations. Therefore, the company decided to replace its client-based Profit & Loss (P&L) reporting system with a more robust, web-based system. This will ensure transparency across the organization and enable better decision making.

The business analyst (BA) at Company A has recently completed several rounds of elicitation to determine the requirements for the new, web-based system. Over 1250 requirements were elicited. An initial Requirements Traceability Matrix (RTM) has been drafted, and a subset of the RTM can be seen below:

as

The BA is working on identifying additional improvement opportunities based on these requirements. Which of the following improvement opportunities is reflected in Requirement ID NFP0002?

Options:

A.

Additional capability

B.

Increased efficiency

C.

Defined relationship to information

D.

Improved access to information

Question 86

A non-profit utility company has 900 employees, a majority of whom are hourly employees and must track their time using a paper based process. A few years ago, the Director of Human Resources purchased a software system to eliminate the current paper-based time reporting process. No requirements specific to the utility company were defined prior to the purchase. A team was formed to implement the software During implementation process, the team discovered the software lacked functionality and was not robust enough to support the general ledger requirements The company stopped the effort and incurred a $500,000 USD loss on the cost of the software.

This year, the Director of Finance requested that a team investigate the current paper-based time reporting process and recommend solutions. The Director of Finance feels that the Director of Human Resources must be involved as a critical stakeholder. The Director of Human Resources is still bitter about the last effort because the process stopped'.

Which of the following is included in performing a stakeholder analysis?

Options:

A.

Compare the expertise of the Director of Human Resources to other stakeholders

B.

Recommend excluding the Director of Human Resources as a stakeholder

C.

Develop a risk plan to anticipate negative behavior from the Director of Human Resources

D.

Implement all of the Director of Human Resources suggestions to relieve tension

Question 87

A business analyst (BA) works for an organization that is moving from a waterfall methodology to an agile approach. This causes new challenges and opportunities for the BA.

Which business analysis planning and monitoring element is most impacted by the organization's change?

Options:

A.

Timing of business analysis work

B.

Conflict and issue management

C.

Technology and infrastructure

D.

Solution scope

Question 88

A team of business analysts (BAs) were assigned to review an enhancement request that would involve changes in a stockroom and the inventory of products. The changes will impact several groups of people and the amount of savings is in excess of $1 million dollars. The recommended process improvement will be presented to management for approval.

What should the team do first?

Options:

A.

Create a business case

B.

Produce an organizational model

C.

Define the change strategy

D.

Validate the cost savings

Question 89

A business analyst (BA) is running a workshop with a group of stakeholders to understand the requirements for a change that the company is planning to implement.

What important factor does the BA need to understand to ensure the workshop remains focused on the topic in question?

Options:

A.

Future state

B.

Assets

C.

Scope

D.

Risk register

Question 90

A business unit of a transnational manufacturer wants to implement a robust process for addressing integrity- critical equipment deterioration incidents. Timely and complete resolution of such incidents is vital for the business unit’s continuous safe and profitable operation. Treating each incident involves many employees from different departments extensively collaborating and exchanging information. That information is spread across multiple systems having their access limited to particular user groups. With the current manual process, some incidents get forgotten and remain unresolved for years.

The project’s Sponsor is an Equipment Integrity and Reliability Advisor, who moved into this position from another business unit. That business unit implemented a proprietary application to integrate the information and to assist in tracking and managing the incidents. Having a positive experience with the application, the Sponsor is suggesting to customize it and reuse in the new business unit.

The business unit’s Enterprise Architect (EA), who is responsible for assessing solution options and presenting them to executive decision makers, has a few concerns with adopting the existing application. The application uses point-to-point interfaces with other data sources whereas the business unit’s target architecture relies on a data warehouse-based integration. Moreover, the two business units use different legacy systems, as well as different front-end implementation technologies. Additionally, the existing application is monolingual, while the business unit needs user interfaces and some data to be presented in two languages. With all of this, it may be easier to build a new application from scratch than to customize the existing one. To understand which option is better, the EA asks a business analyst (BA) to define business requirements.

Through the elicitation process, the BA identifies the following requirement: "Particular incident-related activities require approval by authorized personnel before beginning them, as well as confirmation of acceptance of their completion."

What kind of asset should the BA provide to fully specify the approval requirement?

Options:

A.

A process diagram

B.

A RACI matrix

C.

A use case model

D.

A business rule

Question 91

You are the business analyst for your organization and are in the process of creating the solution approach for a technology problem.

Which one of the following definitions best describes the solution approach?

Options:

A.

It is the documentation and control of changes to the product scope as approved by the project stakeholders.

B.

Defines the general approach that will be taken to create or acquire new capabilities required to meet the business need.

C.

It is an uncertain event or condition that may have a positive or negative impact on the abilities of the chartered project.

D.

Decomposes the project scope into smaller deliverables; each deliverable is subdivided repeatedly until the deliverable cannot or should not be broken down any further.

Question 92

Henry is the business analyst for his organization. Management has created a pre-determined budget of

$450,000 for his solution. Henry has identified the project requirements but now wants to prioritize them based on timeboxing and budgeting. Henry examines the cost of the requirements and begins removing the requirements from the allowed list in order to meet the $450,000 budget.

What timeboxing or budgeting approach is Henry using?

Options:

A.

Parametric

B.

All in

C.

Selective

D.

All out

Question 93

You have identified a task in your task list that cannot be completed until the inspector for the project signs off on the initial deliverables.

The inspector's signoff on the initial deliverables is called what?

Options:

A.

Assumption

B.

Dependency

C.

Milestone

D.

Constraint

Question 94

You are the business analyst for a large project in your organization. While your company prefers face-to-face communications there are many stakeholders located in different geographical locations.

How can you still effectively serve as a business analyst when the stakeholders are not collocated?

Options:

A.

You will need to travel on a regular rotation to each of the geographical locations to complete the business analyst duties.

B.

You will need to implement videoconferences.

C.

Add more business analysts in each of the geographical location.

D.

You will need the stakeholders to periodically gather in one locale.

Question 95

Ned is the business analyst for the NHQ Company. He is working with Stan on completing the requirements prioritization of all the identified requirements.

Why would Stan and Ned complete requirements prioritization?

Options:

A.

To determine which requirements should be completed first

B.

To determine which requirements should not be completed at all

C.

To determine which requirements, carry the most risk

D.

To determine who created what requirement based on their position in the organization

Question 96

Fred's organization is using a plan-driven approach for the business analysis deliverables.

In this approach how will the requirements be captured?

Options:

A.

Fred will use the appropriate documentation at the discretion of the business analysis team.

B.

Fred will use the project management information system.

C.

Fred will use whatever business analysis forms are most appropriate.

D.

Fred will use standardized templates.

Question 97

Which conduct stakeholder analysis technique identifies stakeholder roles that may serve as a useful starting point for identifying actors and roles?

Options:

A.

Scope modeling

B.

Requirements workshops

C.

Scenario and uses cases and user stories

D.

Interviews

Question 98

You need to identify assumptions as part of the assessment of capability gaps.

Which of the following is an example of an assumption?

Options:

A.

The project manager believes that her project team members can program in COBOL.

B.

All vendors must have security clearance.

C.

The software must be compatible with the current operating system.

D.

The risk in the project must be quantified.

Question 99

The business analysis approach generally defines all of the following attributes except for which one?

Options:

A.

Requirements for solutions acceptance

B.

Deliverables

C.

Team roles

D.

Analysis technique

Question 100

Which of the following is an estimate based on past projects to predict the current cost and/or duration of the current project?

Options:

A.

Current estimate

B.

Past project cost

C.

Past estimate

D.

Top-down estimate

Question 101

What business analysis process ensures that requirements specifications and models meet the necessary standard of quality to allow them to be used effectively to guide further work?

Options:

A.

Identify constraints and assumptions

B.

Validate requirements

C.

Verify requirements

D.

Specify and model requirements

Question 102

You are the business analyst for your organization and are to conduct stakeholder analysis. Which of the following statements best describes the conduct stakeholder analysis task?

Options:

A.

This task identifies organizations and lines of business that may be affected by a proposed initiative or who share a common business need.

B.

This task identifies stakeholders who may be affected by a proposed initiative or who share a common business need.

C.

This task identifies the organizations that are likely affected by a problem that a project must solve.

D.

This task identifies the people who may be affected by a proposed initiative or who share a common business need.

Question 103

You are the business analyst for your organization and are working on prioritizing the project requirements. Management has asked you to prioritize the requirements based on the cost-benefit analysis for the requirements' value to the organization.

What basis for prioritization are you using in this instance?

Options:

A.

Business value

B.

Stakeholder agreement

C.

Likelihood of success

D.

Urgency

Question 104

You are the business analyst for your organization and you are completing the manage requirements traceability process. You are tracking the requirements to determine how the requirements are interrelated with one another and with the actual delivery of the project scope.

There are actually three reasons why the business analyst should trace requirements.

Which one of the following is not one of the three reasons why trace requirements is useful?

Options:

A.

Impact analysis

B.

Requirements coverage

C.

Requirements allocation

D.

Quality control

Question 105

Gary is the business analyst for his organization. He has realized that he has overlooked a key group of stakeholders during the conduct stakeholder analysis process.

What is the danger in overlooking a key set of stakeholders?

Options:

A.

The newly identified stakeholders will now have to pay for any requirements they want to add to the requirements.

B.

The newly identified stakeholders will need to spend extra time to learn about the project and how it will affect them.

C.

The newly identified stakeholders will be excluded from decisions that affect the deliverables that have already been created in the project.

D.

The newly identified stakeholders may have requirements that require additions to the project or may nullify other requirements already in the project.

Question 106

You are working with several business analysts to determine the solution approach for an identified problem.

All of the following techniques are acceptable for identifying the solution approach except for which one?

Options:

A.

Benchmarking

B.

Decision analysis

C.

Risk analysis

D.

Brainstorming

Question 107

You are preparing a business case for your organization to determine the justification of the costs of the solution in relation to benefits the solutions will bring the organization. You need four inputs to complete this process.

Which one of the following is not an input that will help you write the business case?

Options:

A.

Feasibility study

B.

Stakeholder concerns

C.

Assumptions and constraints

D.

Business need

Question 108

You are the business analyst for your organization. You are currently identifying opportunities for a customer to improve their business processes. The customer wants to streamline their business efforts either through new technologies, better processes, or a combination of both. The customer demands, however, that the solution should not cost more than $300,000 to implement and support for one year.

What does the $300,000 represent?

Options:

A.

Solution cost

B.

Budget

C.

Requirements

D.

Constraint

Question 109

What plan includes the description of the scope of work, the deliverable Work Breakdown Structure, the activity list, and estimates for the business analysis activities?

Options:

A.

Project management plan

B.

Implementation plan

C.

Requirements management plan

D.

Business analysis plan

Question 110

What plan will describe the stakeholder groups, communication needs, and the level of formality that is appropriate for the requirements?

Options:

A.

Requirements management plan

B.

Project management plan

C.

Scope management plan

D.

Business analysis communication plan

Question 111

You are the business analyst for your organization. Gary and Janet, two key stakeholders in the project, are in disagreement over a requirement for the type of software to be installed on the server your solution calls for.

What must happen in this instance before formal approval can be offered?

Options:

A.

The conflict will need to be resolved through research, resolution, or through a third-party mediation.

B.

Gary and Janet will need to determine who has seniority in the company to determine which requirement takes precedence.

C.

The conflict will need to be removed from the solution scope until Gary and Janet come to a solution.

D.

The business analyst will need to make a decision on which requirement is most appropriate.

Question 112

Wanda is the business analyst for her organization and she is currently working on the specify and model requirements process. One of the elements of this process is the documentation of the textual requirements.

Wanda must describe the capabilities of the solution, any conditions that must exist for the requirements to operate, and what third component of the textual requirement?

Options:

A.

Any constraints that may prevent the solution from fulfilling the requirement

B.

Write in the active voice

C.

Describe a situation or problem

D.

Express only one requirement at a time

Question 113

You are working with Terry on the conduct stakeholder analysis task as part of the business analysis duties in your company. Terry wants to know why it's so important to identify stakeholders so early in the business analysis duties.

Which one of the following statements best addresses the need to identify the stakeholders early on in the business analysis duties?

Options:

A.

It's important to identify the stakeholders so the business analyst knows who to report to.

B.

It's important to identify the stakeholders so the business analyst knows who to bill for the project.

C.

It's important to identify the stakeholder so the business analyst can help ensure the timely delivery of the requirements deliverables.

D.

It's important to identify the stakeholders so the stakeholders know who the business analyst is.

Question 114

You are the business analyst for the TGH Organization and are determining if you should buy or build a solution for your company. You have determined that you can create the in-house solution for $78,000 with a monthly support cost of $8,765. A vendor can create the solution for $61,000 with a monthly support cost of $7,990.

How long will it take your company to break even if you choose the internal solution versus the vendor's solution?

Options:

A.

36 months

B.

12 months

C.

6 months

D.

22 months

Question 115

You are completing enterprise analysis. Management has asked you to create a document that will help them create a go/no go decision to invest and more forward with a proposed project.

What document does management want you to create?

Options:

A.

Feasibility study

B.

Project scope

C.

Solution scope

D.

Business case

Question 116

You are the business analyst for your organization and are working on organizing the identified requirements for a new solution. Nancy, your assistant in this process, says that these requirements aren't very complex. You agree but add that it's this thing that makes the overall solution complex.

What thing adds to the level of complexity among requirements?

Options:

A.

Relationships among the requirements

B.

Management in the project

C.

Stakeholders in the project

D.

Cost and schedule constraints

Question 117

Which one of the following is an example of a non-negotiable demand by a stakeholder during the requirements prioritization session?

Options:

A.

All requirements are ranked as high

B.

Communication

C.

All requirements are prioritized by cost-benefits ratio

D.

Cost

Question 118

You are the business analyst for your organization. Management has asked that in the business case you're creating that you also include the projected costs and benefits to be realized and how those and benefits will be assessed and evaluated.

What term matches management's request?

Options:

A.

Cost-benefits justification

B.

Risk assessment

C.

SWOT analysis

D.

Results measurements

Question 119

You are the business analyst for your organization. On your current project you'll be using the change-driven approach for defining requirements and gathering feedback.

Which of the following statements best describes the change-driven approach?

Options:

A.

The change-driven approach favors defining requirements through experimentation.

B.

The change-driven approach does not define the requirements until after a solution for the problem has been identified.

C.

The change-driven approach favors defining requirements standardized templates.

D.

The change-driven approach favors defining requirements through team interaction.

Question 120

What type of a business analysis approach focuses on the rapid delivery of business value in short iterations?

Options:

A.

Risk-driven

B.

Change-driven

C.

Risk-laden

D.

Profit-driven

Question 121

You are the business analyst for a large project in your organization. You are working with Ben to create requirements packages to present to the stakeholders, the business analyst team, and to the project manager. Ben wants to know why you're creating requirements packages.

What's the primary goal of developing a requirements package?

Options:

A.

To convey the cost, schedule, and risk information clearly

B.

To convey information clearly and in an understandable fashion

C.

To present the requirements in packages that are easy for the project team to accomplish in their project execution

D.

To help the project manager create the work breakdown structure

Question 122

What is the degree to which a set of inherent characteristics fulfills requirements.

Options:

A.

Quality

B.

Regulation

C.

Project phase

D.

Scope

Question 123

Which of the following meeting brings all of the potential vendors together to discuss the statement of work and the request for proposal?

Options:

A.

Contract bidding meeting

B.

Status meeting

C.

Qualified vendors meeting

D.

Bidders conference

Question 124

You are completing the requirements for vendor selection and need to create a procurement form that will ask the vendor to provide only a price for commercial-off-the-shelf solution.

What type of procurement form will you need to provide to the vendor?

Options:

A.

Request for proposal

B.

Purchase order

C.

Request for information

D.

Request for quote

Question 125

You are the business analyst for your organization and need a method to requirements elicitation from nearly 12,000 stakeholders. You want a method to quickly capture this group's feelings and thoughts to identify what the majority of this group needs and wants in a new solution your organization may create.

What requirements elicitation technique can be used in this scenario?

Options:

A.

Interviews

B.

Trend analysis

C.

Focus groups

D.

Surveys

Question 126

As part of the requirements analysis a business analyst can use the same tools and techniques to model the current state of an organization.

All of the following are valid reasons why would a business analyst want to create a current state domain model except for which one?

Options:

A.

The current state model can help identify opportunities for improvement.

B.

The current state model can help validate the solution scope with business and technical stakeholders.

C.

The current state model can help the business analyst create Pareto charts for process improvement.

D.

The current state model can help assist stakeholders in understanding the current state

Question 127

What is the purpose of the business case?

Options:

A.

The business case helps the organization determine if they can justify the investment for the solution.

B.

The business case helps the organization determine the duration and cost of the solution.

C.

The business case helps the organization determine the cost of the solution.

D.

The business case helps the organization determine if the solution is feasible.

Question 128

Your organization needs to adapt to the change economy, new technologies, and an increase in competition in order to survive. They've asked you to complete a business analysis approach that will help them change their organizational policies in order to achieve their goals and objectives.

What business analysis technique has this organization asked you to complete?

Options:

A.

Focus groups

B.

Business rules analysis

C.

Brainstorming

D.

Root cause analysis

Question 129

Which of the following is a procurement document?

Options:

A.

Project Work Breakdown Structure

B.

Project charter

C.

Vision document

D.

Invitation for bid

Question 130

You are the business analyst for your organization and are about to conduct requirements elicitation for a process to streamline the customer fulfillment system your organization uses. You need to understand how the people, processes, and technology within the customer fulfillment system operates before you begin the elicitation process.

What type of analytical thinking are you participating in this scenario?

Options:

A.

Problem solving

B.

Creative thinking

C.

Brainstorming

D.

System thinking

Question 131

What requirements elicitation involves carefully selected stakeholders and subject matter experts for a short, intensive period (usually for one to a few days) to define and document the requirements for a solution?

Options:

A.

Many-to-many interviews

B.

Requirements workshop

C.

Focus group

D.

Prototyping

Question 132

You are the business analyst for your organization and are preparing for the conduct elicitation activities. You'll have six inputs as you prepare for this activity.

Which one of the following is not a valid input for the requirements elicitation activity?

Options:

A.

Requirements management plan

B.

Documented elicitation results

C.

Solution scope

D.

Business need

Question 133

Holly is the business analyst for her organization. Management has asked Holly to create a document that will define solution alternatives and how each identified solution may provide an expected business benefit to meet the identified business need. Management has asked Holly to provide data and statistics in this document to support her claims and findings.

What type of document is management asking Holly to create?

Options:

A.

Feasibility study

B.

Vision statement

C.

Project scope statement

D.

Current state assessment

Question 134

You are the business analyst for your organization and are leading a presentation about an identified problem. This presentation will help the stakeholders to understand the problem and it will help you when you begin to elicit requirements from the stakeholders.

Which type of learner learns best through the presentation of models?

Options:

A.

Visual learners

B.

Auditory learners

C.

Kinesthetic learners

D.

Communication model learners

Question 135

Bob and Susan are business analysts for their organization. They are examining two materials that could be used in an upcoming project. They aretesting the materials and measuring the results of each test to compare the materials to each other. This process will help Bob and Susan determine which material is best for their upcoming project.

What type of process are Bob and Susan completing with these materials?

Options:

A.

Feasibility study

B.

Stress test

C.

Alternative identification

D.

Benchmarking

Question 136

You are the business analyst for the NHQ Project. You have identified several stakeholders that need different types of information related to the requirements.

Which stakeholder would need detailed technical interface requirements?

Options:

A.

Project manager

B.

Regulators

C.

Testers

D.

Implementation subject matter experts

Question 137

You are the business analyst for your organization and are preparing for the conduct elicitation activity. You'll need several stakeholders' roles as you prepare for this activity in your organization.

Which one of the following stakeholders may be responsible to dictate that a specific process or technique be

followed during your requirements elicitation activities?

Options:

A.

Project manager

B.

Regulator

C.

Functional management

D.

Project sponsor

Question 138

Henry is the business analyst for his organization and is completing the conduct elicitation activity. Part of this activity is to record the results of the requirements elicitation process.

All of the following are acceptable elements for requirements documentation except for which one?

Options:

A.

Text message sent via a secured mobile phone

B.

Written documents describing the outcomes

C.

Visual or audio recordings

D.

Whiteboards

Question 139

Which of the following techniques involves determining and documenting the variance between business requirements and current capabilities?

Options:

A.

Risk analysis

B.

Schedule analysis

C.

GAP analysis

D.

Cost benefit analysis

Question 140

Which of the following processes can start with the source of problems or with the problem itself?

Options:

A.

Risk estimation

B.

Risk analysis

C.

Risk management

D.

Risk identification

Question 141

You are the business analyst for the NHQ Organization. Management has asked that you examine the workflow and internal processes for order fulfillment. Specifically, they'd like you to complete an in-depth analysis and documentation of the business problems and opportunities that may be exist for the organization.

What business analysis knowledge area does this activity map to?

Options:

A.

Requirements elicitation

B.

Solution assessment and validation

C.

Enterprise analysis

D.

Requirements management and communication

Question 142

Which of the following models defines the name of the data, data aliases, and description of system data?

Options:

A.

Class model

B.

Entity relationship

C.

Data dictionary

D.

CRUD matrix

Question 143

You are the business analyst for your organization. Your current project is using a plan-driven approach for the requirements, business analysis, and monitoring.

Which one of the following statements best describes the plan-driven approach to business analysis planning and monitoring?

Options:

A.

Plan-driven approaches determine how priorities will be diagnosed for the project solution.

B.

Plan-driven approaches encourage changes that prevent errors and omissions.

C.

Plan-driven approaches typically have meetings daily to discuss the business analysis requirements process.

D.

Plan-driven approaches typically call for a significant amount of formality and detail.

Question 144

Martha is observing Sarah complete several complex steps as part of her business analysis requirements elicitation process. In this instance Martha working alongside Sarah is actually helping Sarah complete the work so that Martha can understand all of the steps Sarah must complete.

What type of requirements elicitation technique is Martha using?

Options:

A.

Progressive elaboration

B.

Shadowing

C.

Cross training requirements elicitation

D.

Active observation

Question 145

Which of the following tasks does not rely on other activities, and no other activities rely on this task completing?

Options:

A.

Analysis task

B.

Independent task

C.

Predecessor task

D.

Dependent task

Question 146

You are the business analyst for your organization. You have identified the costs and level of effort needed for

each of the solution components. Management has asked that you also assess the most effective tradeoffs between delivery options. You consider the available resources and the constraints on the solution to determine if an additional investment is justified to realize a higher value for the solution.

What other consideration could you include in your assessment of the solution?

Options:

A.

Historical information

B.

Dependencies between requirements

C.

Experience of the implementation team

D.

Enterprise environmental factors

Question 147

You are the business analyst for your organization and are planning the business analysis approach. One of the techniques you are considering for this undertaking is to rate the available methodologies against the organizational needs and objectives.

Which of the following terms describes the business analysis technique that you are currently considering in this scenario?

Options:

A.

Structured walkthrough

B.

Decision analysis

C.

Cause-and-effect analysis

D.

Process modeling

Question 148

What type of interview is the most common as part of requirements elicitation?

Options:

A.

Many-to-one

B.

Many-to-many

C.

One-to-one

D.

One-to-many

Question 149

Which of the following models demonstrates the attributes, operations, and relationship to entities within the solution?

Options:

A.

Entity Relationship

B.

Data dictionary

C.

Class model

D.

CRUD matrix