Certification of Capability in Business Analysis (CCBA) Questions and Answers

Question 1

Linda is the business analyst for her organization and she's working with Joe, a new business analyst, to prioritize requirements. Joe doesn't understand why requirements need to be prioritized; as all requirements are required, they should carry equal weight in the analysis. What should Linda tell Joe as to why requirements must be prioritized?

Options:

A.

Prioritization ranks the requirements according to the cost and schedule.

B.

Prioritization ranks the requirements on a weighted scale of key performance indicators, such as cost, schedule, risk, and experience.

C.

Prioritization ensures that the most important stakeholders are considered first.

D.

Prioritization of requirements focuses on the most critical requirements first.

Question 2

Which of the following is the best definition of the business rules analysis?

Options:

A.

To define the historical information that is available for the business analyst to rely on for his research.

B.

To define the rules that govern decisions in and organization and that define, constrain, or enable organizational policies.

C.

To define the people that govern decisions in and organization and that define, constrain, or enable organizational policies.

D.

To define the job functions, roles and responsibilities, and the designation of power among the project stakeholders.

Question 3

You are the business analyst for your organization and you're working with your manager to discuss the constraints and assumptions that may affect the requirements. Your manager wants to know from where you've derived the list of constraints and assumptions. What's the best answer as to where assumptions and constraints are identified?

Options:

A.

Assumptions and constraints are identified through a review of project requirements.

B.

Assumptions and constraints are identified through elicitation from stakeholders.

C.

Assumptions and constraints are identified through risk identification and analysis.

D.

Assumptions and constraints are identified through document analysis.

Question 4

All of the following stakeholders participate in the prioritization of requirements except for which one?

Options:

A.

Project team

B.

Implementation subject matter expert

C.

Domain subject matter expert

D.

Project manager

Question 5

You are the business analyst for your organization and you're performing the solution assessment process. When you assess a solution, what are you actually looking for?

Options:

A.

To determine the value of the proposed solution to the stakeholder requirements

B.

To determine the quality of the proposed solution to the stakeholder requirements

C.

To determine the cost of the proposed solution to the stakeholder requirements

D.

To determine the accuracy of the proposed solution to the stakeholder requirements

Question 6

Which solution scope creation technique can be best described as the depiction of the scope of work required to integrate the new solution into the business and technical environments?

Options:

A.

Scope modeling

B.

Interface analysis

C.

User stories

D.

Functional decomposition

Question 7

In order to define the business need for an organization, there are two inputs. What are the two inputs a business analyst will need to define the business need?

Options:

A.

Business goals and objectives

B.

Stakeholder identification and stakeholder analysis

C.

Requirements and Business analysis approach

D.

Elicitation approach and Solution approach

Question 8

You are the business analyst for your organization. You are coaching Tom about the different approaches to business analysis. Which type of business analysis approach has the most business analysis work at the beginning of the project or during the start of a project phase?

Options:

A.

Requirements-driven approach

B.

Change-driven approach

C.

Plan-driven approach

D.

Value-driven approach

Question 9

Kendra is the business analyst for her organization. She's working with the project manager and the project sponsor to discuss the current requirements. Kendra believes it's important for the project manager to first implement the requirements with the highest amount of risks. Is this a good idea?

Options:

A.

No, the project manager and team should actually implement the lowest risk requirements first.

B.

Yes, if the risky requirements cause the project to fail, the organization will not suffer much loss, as it hasn't invested much time or money on the project.

C.

No, the project manager and team should implement the requirements with the highest risks last.

D.

Yes, this allows the project manager to get the risky work done as soon as possible in the schedule.

Question 10

Beth is the business analyst for her organization and she's creating a data dictionary for her organization. All of the following information should be included in the data dictionary for an endeavor Beth is leading except for which one?

Options:

A.

Description

B.

Aliases

C.

Name

D.

Code of account identifier

Question 11

When you, a Business Analyst, work with your stakeholders, team, and experts to define the business analysis activities, what thing do you actually define?

Options:

A.

You define the requirements of the initiative.

B.

You define the roles and responsibilities.

C.

You define the communication needs.

D.

You define the business analysis approach.

Question 12

An organization has selected a solution for a business need and the business analyst has elected to use the time boxing/budgeting technique for requirements prioritization. What is the time boxing/budgeting technique?

Options:

A.

It's a method to prioritize requirements based on a pre-determined budget and/or a pre-determined deadline.

B.

It's used when there are conflicting requirements that must be resolved quickly and cost efficiently.

C.

It's a method to rank requirements in different boxes based on time, cost, risk, and need.

D.

It's used to determine which requirements can be implemented fastest and for the least amount of cost.

Question 13

You are the business analyst for your organization and you're notifying the key stakeholders of a need to gather requirements for an endeavor. One of the stakeholders that you'll need to attend your requirements workshop is the project manager. What role will the project manager have in this workshop?

Options:

A.

The project manager will facilitate the requirements workshop.

B.

The project manager will ensure that the needed resources are available.

C.

None, the project manager should not be involved until all of the requirements have been identified.

D.

The project manager will help elicit requirements from the stakeholders.

Question 14

Brian is the business analyst for his organization and he's hosting a brainstorming session. He is facilitating the session with eight stakeholders. Why is it important for Brian to not set a goal for the number of ideas the group should generate in the session?

Options:

A.

A goal for the number of ideas to be generated should be created.

B.

A goal for the number of ideas puts too much pressure on the group.

C.

A goal for the number of ideas may be too large to reach.

D.

A goal for the number of ideas actually limits the ideas that can be generated.

Question 15

You are working with the project stakeholders to analyze and prioritize their requirements for the project. One of the project requirements is to achieve a high-level of customer satisfaction for the project deliverable. What is the danger in this project requirement?

Options:

A.

Achieving customer satisfaction is a risk, as the project manager cannot control how satisfied the customer will be with the project deliverables.

B.

Achieving customer satisfaction is an assumption and should be documented in the project scope.

C.

Achieving customer satisfaction should always map to the quality requirements for the project.

D.

Achieving customer satisfaction is a subjective requirement and entails a high level of risk of being successfully accomplished.

Question 16

In order to assess the capability gaps of an organization, you'll need all of the following inputs except for which

one?

Options:

A.

Solution performance assessment

B.

Enterprise architecture

C.

Solution scope

D.

Business need

Question 17

You are a Business Analyst for your organization, and you're preparing to elicit requirements from stakeholders. You've gathered several inputs to help with the elicitation process. Which input will you use to ensure that you understand the type of information that should be elicited from stakeholders?

Options:

A.

Roles and Responsibilities

B.

Stakeholder List

C.

Business Need

D.

Risk Assessment

Question 18

You are the business analyst for your organization. You're creating a document that states the business need, identifies the key stakeholders, and defines the positive impact the solution will bring to the organization and stakeholders. What document are you creating?

Options:

A.

Requirements documentation

B.

Business case

C.

Project charter

D.

Vision statement

Question 19

As a business analyst, you'll need to communicate with the stakeholders of the solution you propose. Why is it important for the business analyst to review the stakeholder concerns as part of the assessment of the organization for the readiness of the solution?

Options:

A.

To gain confidence and synergy among the stakeholders

B.

To confirm stakeholder prioritization

C.

To confirm the stakeholders' commitment of the solution

D.

To address potential problems or issues

Question 20

When can changes to requirements occur in a business analysis planning and monitoring assignment?

Options:

A.

Changes to requirements can occur any time after the project's change control system has been enacted.

B.

Changes to requirements can occur at any time.

C.

Change to requirements can occur any time before the project scope statement is created.

D.

Change to requirements can occur at any time before the key stakeholders approve the identified requirements.

Question 21

Which technique in organizing requirements is best described as showing the concepts and relationships relevant to the solution or business domain?

Options:

A.

Data flow diagram

B.

Business rules analysis

C.

Data modeling

D.

Functional decomposition

Question 22

You are a business analyst for your organization and you're working with the stakeholders to identify the primary inputs to the business analysis approach. Which of the following will help determine whether a plan- driven or change-driven approach is appropriate?

Each correct answer represents a complete solution.

Options:

A.

Organizational process assets

B.

Expert Judgement

C.

Business need

D.

Penalty of not seizing the opportunity

Question 23

You are the business analyst for a large project that will create new software for the entire organization. This new software will affect all of the administrative assistants in the organization schedule meetings, reserve facilities, and share calendars. There are approximately 2,400administrative assistants in your organization and not all of these people can attend requirements gathering workshops. What approach can you use to manage and gather requirements from these 2,400 administrative assistants?

Options:

A.

You can meet with a small group of administrative assistants that will serve as representatives for the remaining administrative assistants.

B.

You will need to meet with all of the administrative assistants as part requirements elicitation.

C.

You can meet with a small group of administrative assistants and assume their requirements are reflective of the remaining group of administrative assistants.

D.

You can meet with the administrative assistants' managers.

Question 24

Which of the following is the prime purpose of the Manage Stakeholders Expectations process?

Options:

A.

Identify stakeholders

B.

Close project

C.

Resolve issues

D.

Updating risk registers

Question 25

You are the business analyst for your organization and you're working with the project manager to complete some business analysis activities. The project manager has the authority to approve the requirements based on the short iterations of business analysis activities.

What approach of business analysis are you using in this scenario?

Options:

A.

Progressive elaboration

B.

Change-driven

C.

Plan-driven

D.

Iterative

Question 26

You work as a business analyst for u Certify Inc. You have been assigned the task to implement the job

shadowing process. Which of the following statements are true regarding the job shadowing process? Each correct answer represents a complete solution.

Options:

A.

The job shadowing process is a part of business analysis planning and monitoring activities.

B.

In this process, the observer is required to keep an eye on those workers whose work routine is down and who are unable to explain their work.

C.

In this process, the observer has to understand their work process for better assessment of the modifications of the work required.

D.

Job shadowing is an elicitation process that is a part of job observation.

Question 27

What element of the plan business analysis process affects the business analysis duties that need to be performed?

Options:

A.

The experience of the project manager

B.

The expected completion date of the business analysis duties

C.

The type of project or initiative

D.

The experience of the business analyst

Question 28

As a business analyst, it's important to understand the relationships among requirements. All of the following are valid relationship types among requirements except for which one?

Options:

A.

Linked

B.

Necessity

C.

Cover

D.

Subset

Question 29

You have 83 project stakeholders from all across your organization. Some of the stakeholders, such as functional management, require weekly communication from you, while other stakeholders, such as the end users, only need quarterly progress updates. Where can you record these communication requirements based on your stakeholder analysis?

Options:

A.

Project schedule

B.

Project scope management plan

C.

Project reporting structure

D.

Project communications management plan

Question 30

In order to begin defining the solution scope, you'll need four inputs. Which one of the following is actually a task that will use the solution scope and is not an input?

Options:

A.

Required capability

B.

Assumptions and constraints

C.

Business need

D.

Allocation of requirements

Question 31

There are three inputs for stakeholder analysis. Which input describes the organizational units that exist and their interactions with one another?

Options:

A.

Business need

B.

Enterprise architecture

C.

Matrix structure

D.

Organizational process asset

Question 32

You are the business analyst for your organization and are leading a presentation about an identified problem. This presentation will help the stakeholders to understand the problem and it will help you when you begin to elicit requirements from the stakeholders. Which type of learner learns best through the presentation of models?

Options:

A.

Kinesthetic learners

B.

Auditory learners

C.

Communication model learners

D.

Visual learners

Question 33

According to 'A Guide to the Business Analysis Body of Knowledge', when should the business analyst and an organization actually start requirements allocation?

Options:

A.

As soon as a budget has been created

B.

After approval of the requirements

C.

After the project charter

D.

As soon as the solution approach is determined

Question 34

A business analyst is studying the cost of the endeavor in relation to the projected income the endeavor will bring once the project is completed. What financial valuation technique can the business analyst use to determine the breakeven point for the project?

Options:

A.

Payback period

B.

Average rate of return

C.

Cost-benefit analysis

D.

Discounted cash flow

Question 35

Ben is the business analyst for his organization. Ben is currently working on a solution to improve a laser printer. He has taken the laser printer apart, identified each component, and documented each component's purpose. What type of requirements organization is Ben doing in this scenario?

Options:

A.

Functional decomposition

B.

Process modeling

C.

Scope modeling

D.

Data modeling

Question 36

Sam is preparing for the task of prioritizing requirements and he'll need five inputs to accomplish the task. Which one of the following is not an input that Sam will use to prioritize requirements?

Options:

A.

Risk analysis

B.

Business need

C.

Requirements management plan

D.

Business case

Question 37

What's the difference between a desired outcome and a solution? Choose the best answer.

Options:

A.

The desired outcome is how the organization will operate in the future; the solution is the method to reach the desired outcome.

B.

They are synonymous.

C.

The solution is the ideal fulfillment of the business goals; the desired outcome is the financial gain created by the implementation of the solution.

D.

The desired outcome is what the solution will remove.

Question 38

You are a business analyst in an organization that has recently embraced business analysis as part of its initiative for new projects. In this organization, there is not an organizational standard for tailoring business analysis duties and expectations. Which one of the following best describes the action that you should take to begin business analysis?

Options:

A.

Take charge and begin the business analysis activities, but document your approach to serve as a template for future business analysis initiatives.

B.

Create a business case for the need for organizational standards for business analysis.

C.

Define the organizational standard first.

D.

Work with the appropriate stakeholders to determine how the business analysis work should be completed.

Question 39

You are the business analyst for your organization. You've believed that your solution can actually be purchased from outside vendor rather than trying to create the solution internally. You decide to ask the vendor to provide a fee for their services based on the statement of work. What document will you give the vendor along with the statement of work?

Options:

A.

Request for quote

B.

Contract terms

C.

Request for proposal

D.

Purchase order

Question 40

A business analyst (BA) is working on a project to improve product delivery. The issues arise during the latter stages of the delivery Freecycle and are due to poor communication of the business analysis information from the elicitation phase. As a result, a BA has ensured that the testing and training teams are identified as stakeholders on the RACI Matrix going forward. To which RAG designation should the training and testing teams be added?

Options:

A.

Consulted

B.

Responsible

C.

Accountable

D.

Informed

Question 41

A business analyst (BA) is logging the end user concerns and resolves these on a priority basis as mandated by the government. This project is a simple application, with no major strategic or financial impact to the organization. The BA strongly enforced end-to-end requirement traceability for this project. Why would the BA recommend this traceability approach?

Options:

A.

Regulatory requirements

B.

Costs and benefits

C.

Organizational standards

D.

Complexity of the domain

Question 42

The business analyst (BA) is helping the business stakeholders prioritize requirements for a new customer portal for managing orders, delivery, and payment information. A number of requirements address compliance with regulations regarding access for people with disabilities. What factor should the BA use to guide the stakeholders when assigning a priority for these specific requirements?

Options:

A.

Dependencies

B.

Penalties

C.

Risk

D.

Stability

Question 43

The Chief Executive Officer (CEO) is concerned about how two client bases are going to be integrated and serviced in the newly formed company after a merger. A project has been initiated to implement a Customer Relationship Management (CRM) system for the new company that will contain the client information from both companies. What must the business analyst (BA) do to address the concerns of the CEO?

Options:

A.

Demonstrate the functionality of the new CRM

B.

Reuse requirements models from each company

C.

Ensure all regulatory requirements are documented

D.

Create merged viewpoints of the requirements

Question 44

An organization is experiencing long contracting life cycles when establishing annual contracts with its customers. Upon initial investigation, the outdated application was thought to be the cause, however based on further analysis the business process is found to be flawed. The business analyst (BA) wants to model the people involved in the process. Which of the following techniques models the responsibilities of these stakeholders?

Options:

A.

Roles and Permissions Matric

B.

Data Flow Diagram

C.

Use Cases and Scenarios

D.

Activity Flow

Question 45

The business analyst (BA) has an item logged in the action items register requiring the verification of forthcoming legislation in the next 3 months that might have an impact on the proposed architecture. What should the BA do next?

Options:

A.

Transfer the item to the legal department

B.

Determine the performance measures

C.

Assess the impact immediately

D.

Present the item to the project manager

Question 46

Stakeholders initially agreed to an implementation schedule for a set of reports based on the value to business users. The development team provided a detailed estimate of the time required to develop each report based on the business requirements. What should the business analyst (BA) and the stakeholders do with the estimates?

Options:

A.

Revise the business requirements

B.

Write functional report specifications

C.

Review the priorities

D.

Analyze technical constraints

Question 47

A business analyst (BA) is working on a project for a media company. The BA has verified, validated, and prioritized the requirements based on business benefits. During the development phase, the team discovered that the current viewer will no longer be supported by the provider. The technical team needs to either upgrade to the newer version with different technology or find an alternate viewer. Given this new information, what is the next step for the BA?

Options:

A.

Assess the impacts and re-prioritize the requirements based on technical constraints

B.

Continue the project as it is currently important to focus on customer satisfaction

C.

Convince stakeholders that the business benefits are unachievable due to technical constraints

D.

Communicate the technical constraints to customers

Question 48

A business analyst (BA) spent three months eliciting, specifying, and modelling the detailed stakeholder and solution requirements. Right before requirement sign-off, the BA realized that the Vice President was unable to approve the requirements and the Chief Financial Officer should do so. What element of requirement approval did the BA miss?

Options:

A.

Manage conflicts and issues

B.

Track and communicate approval

C.

Gain consensus

D.

Understand stakeholder roles

Question 49

In a project meeting, stakeholders presented conflicting views on how the business analysis process should be conducted, leading to the sponsor becoming very upset. If a similar situation arises in the future, what can the business analyst (BA) do to avoid the situation?

Options:

A.

Communicate with each stakeholder individually

B.

Obtain stakeholder signoff on the approach

C.

Develop a cleaner RACI matrix

D.

Obtain approval for the business case

Question 50

The claims intake workflow of an insurance company is being standardized across all branch offices. The business analyst (BA) assigned to this project has interviewed users individually in all the offices and plans to schedule a workshop with all the users. What should the BA do to prepare for the workshop?

Options:

A.

Create a process model

B.

Develop a work breakdown structure

C.

Build an entity-relationship diagram

D.

Construct a decision tree

Question 51

A business analyst (BA) is managing stakeholder collaboration to ensure positive reactions are capitalized upon. There is uncertainty as to whether the correct stakeholders have been identified. Which technique can be used to correct this situation?

Options:

A.

Functional decomposition

B.

Lessons learned

C.

Risk analysis

D.

Interviews

Question 52

The Chief Information Officer (CIO) of a large financial services firm with many technology applications was formally reviewing all ongoing projects and noticed that the requirements were complex and difficult to follow. The CIO asks the business analyst (6A) what would improve the stakeholder's ability to understand the requirements. Which of the following will improve the requirements quality?

Options:

A.

Traceability matrices

B.

IEEE /ISO 29148 requirements standards

C.

Additional requirements attributes

D.

Matrix documentation formats

Question 53

A business analyst (BA) plans to organize a focus group to bring all the interested parties together and discuss the issues and possible risks for the new initiative. Due to the geographical differences of each participant a videoconferencing service will be used to satisfy stakeholder preferences. Which approach is the BA defining?

Options:

A.

Stakeholder analysis

B.

Issue management

C.

Release planning

D.

Stakeholder collaboration

Question 54

While gathering information during a requirements workshop, a subject matter expert states that it is likely that an organizational restructure will occur in one of the business departments that will be utilizing parts of the new system. As such, the business analyst (BA) should:

Options:

A.

ask the project sponsor to confirm whether and when the restructure will occur.

B.

record a risk that requirements may change and further explore the likelihood and impact of the risk.

C.

note the constraint that the solution must be flexible to accommodate different roles after implementation.

D.

proceed as if the business unit will not be restructured and wait for the organization to confirm otherwise.

Question 55

A business analyst (BA) decided to capture requirements by inviting all the stakeholders to meet at an office location. After invitations were sent, it turned out that not everyone could attend this meeting because of their individual dispersed locations.

Which of the following does the BA need to adjust to handle this situation?

Options:

A.

Project stakeholders

B.

Logistics setup

C.

Elicitation scope

D.

Elicitation technique

Question 56

A business analyst (BA) is planning how to present a set of requirements for a project with financial constraints. Which requirements attribute should the BA assign to allow cost implications to be assessed?

Options:

A.

Status

B.

Complexity

C.

Ownership

D.

Source

Question 57

A general insurance company wants to enter a new segment that has the potential for high profit and little competition. The business analyst (BA) was asked to prepare a presentation for key stakeholders to show how the new segment will deliver value for stakeholders. Which of the following is best suited for this purpose?

Options:

A.

Capability analysis man

B.

Business architecture

C.

Business model canvas

D.

Business case

Question 58

A business analyst (BA) is facilitating a meeting with subject matter experts (SMEs) in which the SMEs are answering questions about the major business processes and associated activities the business performs. The BA will create a deliverable from this discussion that will assist in defining scope. What technique is the BA using?

Options:

A.

Decision modelling

B.

SWOT analysis

C.

Mind mapping

D.

Functional decomposition

Question 59

A new Chief Executive Officer (CEO) is appointed to revive a chain of well-recognized superstores. The CEO wants to increase sales by introducing on-line shopping. Most stores are understaffed and maintenance is a challenge. Which of the following would be

considered an asset?

Options:

A.

Store maintenance expenses

B.

Brand reputation

C.

Interest mounting on bank loan

D.

Online shopping website

Question 60

A recent survey shows that a newly implemented system has features that the users have never used. Upon reviewing the survey report, the Chief Executive Officer (CEO) highlighted that the company must avoid future implementations with functionality that does not provide any business value. What must the business analyst (BA) do to ensure future requirements meet a business need?

Options:

A.

Consider business relevance while tracing requirements

B.

Choose appropriate format to communicate requirements

C.

Ensure test scenarios align to business requirements

D.

Facilitate a focus group with users to get feedback

Question 61

System designers are working with a business analyst (BA) during the initial stages of a project to implement a new transaction-based system. The system designers would like to have a visual that illustrates the type of information that will be input in the system, the processes it will support, and the location where it will be stored. What type of diagram meets the designers' needs?

Options:

A.

Use Case

B.

Data flow

C.

Activity flow

D.

State Modelling

Question 62

The product backlog refinement meeting for a project is complete but two stakeholders do not agree on the priority of several product backlog items. What should the business analyst (BA) do to help move the project forward?

Options:

A.

Schedule a backlog walkthrough with the two stakeholders

B.

Confirm the authority of the two stakeholders

C.

Notify the project manager

D.

Apply the previous backlog priority

Question 63

A business owner has marked certain requirements as high priority for the upcoming release. After performing some analysis, the project team concluded that some of these requirements are not actually high priority and can be implemented in later releases. How should the project team proceed with prioritizing requirements?

Options:

A.

Change the priority of the requirements by performing are ranking

B.

Consult with the business owner to discuss possible trade-oils

C.

Implement the requirements that the project team considers important

D.

Execute the requirements that the business owner identified

Question 64

A business. analyst (BA) is working on a project to implement a commercial off-the-shelf application for tracking customers. In an observation session with a Domain subject matter expert (SMF). the BA notes that the SME keeps separate records for the customers who are also vendors. The BA knows that the new software has a module for vendor management that would integrate the vendor and customer records. Which type of opportunity has the BA identified?

Options:

A.

Reduction of duplicate tasks performed by staff

B.

Potential to provide future value supported by the system

C.

Ability to provide greater amount of information to staff

D.

Automation to increase consistency of behavior

Question 65

After an initial project kick-off meeting, the business analyst (BA) determined that the project has a short deadline and a regulatory mandate with stiff penalties for non-compliance. The stakeholders do not want to risk missing the deadline, and management is willing to commit any amount of resources to meet the deadline. Which kind of approach is suitable for the initiative?

Options:

A.

Crystal clear development process

B.

Kanban development process

C.

Predictive development process

D.

Adaptive development process

Question 66

A business analyst (BA) collected scanned notes, documents, and photos of whiteboards showing the results of a workshop pertaining to an accounting system replacement. What is the BA's next course of action?

Options:

A.

Meet with stakeholders to review the information sent

B.

Meet with a corporate accounting user

C.

Manage stakeholder collaboration

D.

Develop a business analysis information package

Question 67

A new product that is tablet-enabled is being considered to replace an older product to process orders. The data captured is sent to existing downstream applications which are not being updated. What is the first thing that a business analyst (BA) should consider?

Options:

A.

Conducting a vendor assessment

B.

Performing an interface analysis

C.

Identifying constraints and dependence

D.

Developing process and data models

Question 68

While planning the prioritization approach for an upgrade to a legal property application, the business analyst (BA) needs to check the organization's business policies prior to identifying the stakeholders to participate in the prioritization process. The business policies will help the BA because they:

Options:

A.

provide lessons learned from previous projects that should be incorporated into planning approach for current projects.

B.

Outline the organizational roles and responsibilities in an effort to define a prioritization approach that involves the correct stakeholders.

C.

describe industry regulations and are used to develop a framework for sound business decision making.

D.

define the limits within which decisions must be made in accordance with contracts, agreement warranties or certifications.

Question 69

A project manager asks a business analyst (BA) to conduct a meeting to walk the stakeholders through how requirements are structured. Which of the following requirement viewpoints will help the BA provide that information?

Options:

A.

State model

B.

Business capability analysis

C.

Business process model

D.

Data streams

Question 70

A business analyst (BA) is assigned a new project and is beginning to prepare for elicitation. Which task must the BA complete before preparation of the elicitation process can begin?

Options:

A.

Coordinate meeting logistics

B.

Approve anticipated expenses

C.

Gather contact information of stakeholder

D.

Collect information on the business need

Question 71

A business analyst (BA) has elicited the following requirement; "The solution must ensure the portal response times are under 2 seconds." What requirement classification schema does this requirement belong to?

Options:

A.

Nonfunctional requirements

B.

Stakeholder requirements

C.

Transitional requirements

D.

functional requirements

Question 72

Which tool will allow a business analyst (BA) to determine how information is input, processed, stored, and extracted from a collection of systems?

Options:

A.

Data Glossary

B.

Activity Flow

C.

Entity Relationship Diagram

D.

Data Flow Diagram

Question 73

The human resources department of an organization needs a new report. The business analyst (BA) assigned to this effort has scheduled a requirements workshop with the users. Users from the legal department have also been invited to the workshop. As the BA sets up the workshop, what can be done in advance to ensure a productive and focused workshop?

Options:

A.

Document the feedback

B.

Facilitate the workshop

C.

Create an agenda

D.

Reserve a location

Question 74

A project to replace a financial system uses a waterfall methodology. Initially, meetings with the project subject

matter experts (SMEs) were positive. As the project progressed through the requirements and design phases, the SMEs attended fewer meetings, resulting in a delay to the project build phase. What should the business analyst (BA) have done to prevent the delay?

Options:

A.

Selected a different project methodology

B.

Requested new SMEs participate in the project

C.

Modified the governance structure

D.

Engaged in consistent collaboration

Question 75

A project has experienced several schedule delays. A business analyst (BA) is assigned to the project to help get it back on track. The project manager believes that incomplete requirements are causing the missed milestones. What tool will help address the project manager's concern?

Options:

A.

Quality control checklist

B.

Communication plan

C.

Decision analysis

D.

Risk review

Question 76

After a number of requirements elicitation workshops, the business analyst (BA) notices that two business stakeholders did not speak up during any of the discussions. What should the BA do in the next workshop?

Options:

A.

Allow only the two stakeholders to speak, so that other stakeholders are able to hear their input.

B.

Proceed as normal, assuming that the two business stakeholders will speak up if and when they are ready

C.

Ask all attendees for their input, ensuring that each stakeholder is given time to speak and provide their opinion

D.

Omit the two stakeholders from the next meeting since they do not seem to be engaged or interested

Question 77

The business analyst (BA) is preparing for requirements review with a group of stakeholders. The BA must determine how best to model the requirements for the review. Which of the following guidelines and tools will the BA use?

Options:

A.

Current state description

B.

Requirements architecture

C.

Methodologies and framework

D.

Domain knowledge

Question 78

A project team member is confused about why a small change requires the team to look at the different enterprise-level business objectives when a desired state can be achieved easily without this analysis. What can the business analyst (6A) do to help the team member understand?

Options:

A.

Impact analysis helps gain critical thinking to achieve the desired solution.

B.

Detailed assessments might result in future success of other projects

C.

Proper analysis from difference aspects in required to select the best solution.

D.

When funding is available for extra analysis the project team need to use it.

Question 79

Henry is meeting with Janet, the business analyst of the organization. They are discussing an opportunity to create a new service their company can provide, though the startup of the service would take time and an investment. Henry wants Janet to explore the possibility of this new venture. What activity is Henry asking Janet to complete?

Options:

A.

Brainstorm the business need.

B.

Create a data diagram for the service.

C.

Define the business need.

D.

Elicit the requirements of the proposal.

Question 80

You are the business analyst for your organization and you're working with several stakeholders to identify, manage, and approve requirements. Your organization requires using a plan-driven approach to business analysis and changing management. In this approach, who is most likely to approve changes to requirements?

Options:

A.

Change control board

B.

Requirements owner

C.

Project sponsor

D.

Project manager

Question 81

You are the business analyst for your organization and you're creating a business analysis communication management plan. In your plan, you want to address the different locales and culture and the communication needs that may affect the business analysis approach. Which one of the following elements should not be included in the cultural analysis of the plan?

Options:

A.

Relationship to task completion

B.

Relationship to authority

C.

Relationship to religion

D.

Relationship to time

Question 82

All of the following statements are true regarding a brainstorming session during requirements elicitation except for which one?

Options:

A.

All ideas should be visibly recorded.

B.

The number of ideas should not be limited.

C.

The ideas should be generated with a cost or time estimate.

D.

All ideas should be shared without any discussion, criticism, or evaluation.

Question 83

Which approach is best to take when a business analyst is assessing the solution options for a business need when there are relatively few criteria involved?

Options:

A.

Focus on the life cycle costs of the solutions.

B.

Focus on the commonalities of the solutions.

C.

Focus on the differences of the solutions.

D.

Focus on the implementation cost of the solutions.

Question 84

The creative thinking process has three values to determine the effectiveness of the process. Which one of the following is not a measurement of effective creative thinking?

Options:

A.

Willingness of stakeholders to accept new approaches

B.

Generation of a pre-determined number of new ideas for a business solution

C.

Application of new ideas to resolve existing problems

D.

The successful generation and productive consideration of new ideas

Question 85

You work as a project manager for SoftTech Inc. You are working with the project stakeholders to begin the qualitative risk analysis process. You will need all of the following as inputs to the qualitative risk analysis process except for which one?

Options:

A.

Risk management plan

B.

Stakeholder register

C.

Project scope statement

D.

Risk register

Question 86

Which stakeholder in the solution assessment task will provide information on technical constraints that could limit the solutions that may be implemented?

Options:

A.

Project manager

B.

Suppliers

C.

Sponsor

D.

Operational support

Question 87

A business analyst wants to use benchmarking, but the project manager recommends against the approach. There are, as the project manager points out, several disadvantages to benchmarking. Which one of the following is not a disadvantage to benchmarking?

Options:

A.

Discovery of new approaches

B.

Time consumption

C.

Requirement of expertise of the person conducting the study

D.

Inability to produce innovative solutions

Question 88

You are the business analyst for your organization. Management has asked that you create a method to store the project requirements including those under development, under review, and the requirements which have been approved. What is management asking you to create?

Options:

A.

A change management system

B.

A repository

C.

Requirements register

D.

A project scope statement

Question 89

Ralph is a business analyst for his organization and he's using the plan-driven approach for business analysis. Ralph has captured the requirements of the project, but what must happen before he can begin capturing and defining the requirements at a deeper level of detail?

Options:

A.

The initial requirements must be tested for time, cost, quality, and risk.

B.

The initial requirements must undergo a feasibility study.

C.

The initial requirements must be formally approved by the stakeholders.

D.

The initial requirements must pass through the Delphi Technique.

Question 90

When a business analyst assists in the planning of the solution implementation, she must always consider the constraints for implementation. Which one of the following cannot be considered as an implementation constraint?

Options:

A.

Weather

B.

Freeze periods

C.

Company policies

D.

Business cycle timings

Question 91

Marcy is working with stakeholders to understand the stakeholders' needs as part of the business requirements. The stakeholders are describing their needs for new computers for their designers. The stakeholders have specifications, monitors, and software selected for the business requirements. What are the stakeholders actually defining in this scenario?

Options:

A.

Solutions

B.

Perceived problems

C.

Perceived needs

D.

Longevity

Question 92

The process of defining the business need uses one output. What is it?

Options:

A.

Feasibility study

B.

Solution scope

C.

Business need

D.

Capability gaps

Question 93

Wanda is the business analyst for her organization and she is currently working on the specify and model requirements process. One of the elements of this process is the documentation of the textual requirements. Wanda must describe the capabilities of the solution, any conditions that must exist for the requirements to operate, and what third component of the textual requirement?

Options:

A.

Any constraints that may prevent the solution from fulfilling the requirement

B.

Describe a situation or problem

C.

Write in the active voice

D.

Express only one requirement at a time

Question 94

There are three inputs needed to determine the solution approach process. What are these inputs?

Options:

A.

Business need, organizational process assets, and enterprise environmental factors

B.

Business need, enterprise environmental factors, and required capability

C.

Business need, organizational process assets, and assumptions

D.

Business need, organizational process assets, and required capability

Question 95

Which one of the following statements best describes requirements prioritization?

Options:

A.

It is only used with the plan-driven approach to business analysis.

B.

It is only used with the change-driven approach to business analysis.

C.

It determines how requirements will be prioritized based on the most important stakeholders to the least important stakeholders.

D.

It determines how requirements will be prioritized and how those priorities will be used to define the solution scope.

Question 96

A business analyst (BA) has completed an impact analysis of a proposed change, gained approval for the change, and has updated the requirements. The project sponsor wants to be updated with an overview of the results. How should the BA communicate the results?

Options:

A.

Schedule a requirements workshop

B.

Present the requirements at a high-level

C.

Email the requirements package

D.

Create use case scenarios

Question 97

A project to implement shared registration procedures across multiple jurisdictions has stalled several times. The new business analyst (BA) assigned to the project used a collaborative game to elicit requirements. What effect was the BA attempting to achieve?

Options:

A.

Minimal variance from planned effort

B.

Close alignment with corporate values

C.

Stimulate teamwork in a fun situation

D.

High confidence in conclusions

Question 98

If an organization wants to re-use requirements, where should the defined requirements be kept?

Options:

A.

Requirements management plan

B.

Requirements repository

C.

Solution scope

D.

Project management plan

Question 99

Which one of the following statements best describes the purpose of allocating requirements?

Options:

A.

Optimize efficiency and link to productivity.

B.

Limit the risk exposure.

C.

Maximize the business value.

D.

Increase productivity through efficiency.

Question 100

Linda works as a project manager for an IT project. She is getting new developers for completing her project. Which of the following processes is she involved in?

Options:

A.

Manage Project Team

B.

Develop Project Team

C.

Acquire Project Team

D.

Human Resource Planning

Question 101

If you're a business analyst and using an event-based elicitation task, such as a requirements workshop, what can be considered as essential to establish with the participants?

Options:

A.

Cost management

B.

Deadlines

C.

Ground rules

D.

Purpose of the workshop

Question 102

A business analyst has identified four different solutions for a business need. In the light of solution assessment, how many solution assessment iterations should he do?

Options:

A.

The business analyst can do multiple assessments, one for each solution or to compare multiple solutions.

B.

There is no limit, but the business analyst should perform the same type of assessments for each solution to be balanced.

C.

The business analyst can do one assessment per solution.

D.

There should only be one solution assessment - four is too many. Some of the solutions are better than others.

Question 103

As a business analyst, you must identify activities in your business analysis approach. Which one of the following is useful for identifying activities?

Options:

A.

Project management input

B.

BABOK

C.

A list of deliverables

D.

WBS

Question 104

You are a Business Analyst for your organization, and you're working with Mary. Mary wants to know what you need to complete the process of planning the business analysis approach if you're already the business analyst for your organization. Why is it important to complete the plan business analysis approach?

Options:

A.

This task describes the amount of time needed for the business analysis approach.

B.

This task describes the amount of budget needed for the requirements elicitation.

C.

This task describes how to select an approach for performing business analysis.

D.

This task describes the processes the business analyst will or will not do based on the time and budget available.

Question 105

Jason is creating a business case for his organization and management has asked him to assess the appropriate risks in the business case regarding the solution. Which one of the following risks is not a concern for Jason when defining the business case and associated risks?

Options:

A.

Financial risk

B.

Positive risk

C.

Organizational risk

D.

Technical risk

Question 106

You are the business analyst for your organization and you are working with Bill on creating a model. Bill is a little confused about all the different things a model can do for the stakeholders. You explain to Bill that a model can do all of the following except for which one?

Options:

A.

Define the risk and reward for the requirements

B.

Categorize and create hierarchies of items

C.

Define boundaries for business domains

D.

Show business logic

Question 107

A business analyst must consider the business value a solution brings in relation to the cost of implementing the desired solution. Suppliers will often be limited in the amount of requirements they can implement based on the allocated resources. If there are not enough resources to implement all of the solutions, what can the business analyst create to justify the additional funds for the implementation?

Options:

A.

Business case

B.

Cost analysis

C.

Risk assessment with positive risk analysis

D.

Benefits-cost ratio

Question 108

You are the business analyst for your organization. You are identifying new opportunities to improve upon your existing web services. Management is open to new opportunities as long as the changes do not take more than 60 days to implement. What type of a factor does the 60-day implementation represent?

Options:

A.

Schedule constraint

B.

Business constraint

C.

Technical constraint

D.

Assumption

Question 109

There are four inputs to the plan business analysis activities. Which one of the following is not an input to the plan business analysis activities process?

Options:

A.

Stakeholder list, roles, and responsibilities

B.

Organizational process assets

C.

Business analysis approach

D.

List of identified risks

Question 110

Which of the following defines all of the required work to satisfy the requirements of the project?

Options:

A.

Project scope

B.

Requirements envisioning

C.

Requirements foundation

D.

Product scope

Question 111

A business analyst (BA) has been hired to validate a project's requirements. A series of meetings with stakeholders have been scheduled to walk through each requirement as it relates to the desired future state of the organization. The desired outcome of this exercise is to ensure that all requirements:

Options:

A.

link to user stories.

B.

are articulated correctly.

C.

are funded by the business sponsors.

D.

support the delivery of needed value.

Question 112

In order to plan business analysis activities, you will need four inputs. Which one of the following inputs is not valid for this task?

Options:

A.

Business analysis approach

B.

Stakeholder tolerance for risk

C.

Stakeholder list, roles, and responsibilities

D.

Business analysis performance assessment

Question 113

There are many stakeholders that need to be involved in the allocated requirements. One of the stakeholders in the task will be responsible for verifying released and solution components. Which stakeholder has this

responsibility?

Options:

A.

Project team

B.

Project manager

C.

Operational support

D.

Tester

Question 114

A facilities management company has an ambitious growth plan of doubling the revenue of their office waste recycling service over the next 12 months. The business analyst (BA) plans to define the objectives and align them with the enterprise's vision, mission and goals. What element of ‘SMART’ goals would this objective refer to?

Options:

A.

Relevant

B.

Measureable

C.

Specialized

D.

Achievable

Question 115

Complete this sentence. If a requirement cannot be verified, it cannot be successfully.

Options:

A.

Scheduled

B.

Estimated

C.

Assigned

D.

Implemented

Question 116

A business analyst (BA) is modelling requirements to assist the stakeholders in visualizing the appearance and capabilities of a planned solution. What technique is the BA using?

Options:

A.

User stories

B.

Root cause analysis

C.

Prototyping

D.

Data flow diagrams

Question 117

You have been assigned as the Project Manager for a new project that involves the development of a new interface for your existing time management system. You would like to plan the communications that need to be made during the project lifecycle. Which of the following would be a critical tool/technique to help in your communications planning?

Options:

A.

RAM Chart

B.

Affinity Diagram

C.

Stakeholder Analysis

D.

Text-Oriented Chart

Question 118

The business analyst (BA) has documented the requirements for a new system and is preparing the requirements for approval. Which of the following helps ensure that requirements are fully understood and traceable?

Options:

A.

Requirements are extracted for review

B.

Requirements are properly classified

C.

Requirements are validated

D.

Requirements meet regulatory standards

Question 119

Stakeholders need a financial report that can be published and distributed to multiple end users. They would also like the report to be developed within a specific time frame and within cost. What must the business analyst (BA) do to achieve this goal?

Options:

A.

Review the project budget

B.

Revise business requirements

C.

Define solution approaches

D.

Update the project schedule

Question 120

Due to a change in regulation, a solution being implemented has a new compliance requirement that must be evaluated. The requirements change strategy focuses on total cost of change as the primary driver for decisions. The business analyst (BA) compiled the following impact assessment of the proposed change based on the new compliance requirement.

as

What recommendation should the BA make to the stakeholders based on the above information?

Options:

A.

Approve the requirement

B.

Request additional information

C.

Defer the requirement

D.

Reject the requirement

Question 121

The business analyst (BA) has prepared a requirements package and it is now ready to present to the stakeholders. What is the purpose of presenting the package?

Options:

A.

To document the project's completion

B.

To define the analysis approach

C.

To verity the project's progress

D.

To ensure a shared understanding of the information

Question 122

A business analyst (BA) is defining a stakeholder approval approach for the requirement deliverables. The project involves implementing new government regulatory requirements with significant risk to the organization in case of non-compliance. According to the BABOK ® GUIDE, what will the BA need to do?

Options:

A.

Ensure high level user stories are completed and accepted

B.

Use an informal approval process to speed up delivery

C.

Use a rigorous approval process of detailed specifications

D.

Ensure the document is completed and signed off

Question 123

Performance measures have been collected and analyzed by a business analyst (BA) to evaluate a solution that was launched a few years ago; however, the performance measures do not indicate whether or not the solution is contributing to the desired value. What is the recommended next step?

Options:

A.

Replace the solution as soon as possible

B.

Identify and collect more measurements

C.

Increase the efficiency of the solution

D.

Reduce the business' expectations of value

Question 124

A business analyst (BA) was asked by the vice president (VP) to evaluate the organization's claims processing capability and recommend improvements. The VP agreed to the BA's recommended solution approach and identified an external vendor to develop the modernized claims processing system. Before contracting with the external vendor, the BA realized that the budget should be approved by the Chief Financial Officer. What was missed by the BA when performing stakeholder analysis?

Options:

A.

Attitude

B.

Roles

C.

Decision making authority

D.

Level of influence

Question 125

A business analyst (BA) is conducting a workshop with the purpose of analyzing a business process. Stakeholders of different business units are in attendance. Each stakeholder is able to explain their unit's contribution to the process, however, there is no end to end process owner who can provide a consolidated view. Which technique should the BA use to compare the stakeholder's inputs against each other in order to check for consistency and omissions?

Options:

A.

Schedule a follow-up workshop to give more time for additional input

B.

Create a use case scenario that describes the process step by step

C.

Develop a process model with swimlanes to highlight the handoff points

D.

Create a logical data model with the information elicited

Question 126

One of the tasks that the business analyst (BA) needs to complete is to maintain the requirements. As much as the BA values and sees the benefits of maintaining the requirements, the project manager (PM) does not see the same. In order to help the PM understand the value of this task, which following benefit of maintaining the requirements should the BA communicate to the PM?

Options:

A.

They identify the financial projections of the project.

B.

They define the project schedule and future tasks.

C.

They describe how to setup the traceability tools.

D.

They can easily be traced and reused for future.

Question 127

A senior business analyst (BA) is tasked with verifying a set of requirements written by a junior BA for a

system. During this exercise, the junior BA will ensure that the requirements exhibit atomic characteristics. The senior BA will be verifying that the requirements:

Options:

A.

can be understood independently of other requirements.

B.

are written using terminology common for the audience.

C.

contain no extraneous and unnecessary content.

D.

are aligned with the identified need of the stakeholders.

Question 128

An organization is engaged in an effort to streamline the online customer experience. The business analyst (BA) prepares a business analysis information package to discuss the changes the customer will experience. Which one of the following tools will assist the BA in this discussion?

Options:

A.

Context Diagram

B.

Data Dictionary

C.

Visual Prototype

D.

Business Rules

Question 129

A business analyst (BA) has elicited requirements for a new system. A subset of these requirements refers to judging the performance of the system, such as efficiency, capacity, security, and scalability. What technique is used to examine and group these requirements?

Options:

A.

Functional decomposition

B.

Scope model

C.

Trace requirements

D.

Non-functional requirements analysis

Question 130

A business analyst (BA) must model information characteristics across multiple information systems for a project. What type of model captures this information?

Options:

A.

Interface analysis

B.

Business capability analysis

C.

Decision analysis

D.

Force field analysis

Question 131

A business analyst (BA) needs to make sure that the business analysis information is securely stored and accessible to stakeholders. Which element helps in achieving that goal?

Options:

A.

Requirements attributes

B.

Organization of information

C.

Traceability approach

D.

Level of abstraction

Question 132

Two business analysts (BAs) are working on a requirement elicitation activity. One BA comes across a checklist that contains stakeholder details such as who are involved, location, group dynamics that are to be considered before beginning the elicitation activity and seeks a clarification from the second BA. The other BA explains that these details, along with several other items mentioned in the checklist, are required to:

Options:

A.

select elicitation techniques.

B.

prepare stakeholders.

C.

secure supporting material.

D.

understand scope of elicitation.

Question 133

A business analyst (BA) creates several use case scenarios to specify the requirements for a system. When the beta version of the system is released, there are problems because several important pieces of information are missing. What should the BA have done to avoid this situation?

Options:

A.

Performed decision analysis

B.

Identified assumptions

C.

Prepared activity diagrams

D.

Analyzed completeness

Question 134

The business analyst (BA) is analyzing the formal relationships between people working in the enterprise. Which technique will the BA use to perform this task?

Options:

A.

Organizational modelling

B.

Stakeholder modelling

C.

Focus groups

D.

Functional decomposition

Question 135

The business analysis (BA) team is evaluating a new commercial off-the-shelf (COTS) application that will be implemented in the coming months. The company has over 20 legacy systems deployed. The Chief Information Officer (CIO) is worried about the need for integration and that some key linkages are missing.

What is the BA team evaluating?

Options:

A.

Technology and infrastructure

B.

Industry standard architecture

C.

Service oriented architecture

D.

Business architecture

Question 136

The business analyst (BA) assigned to support a legacy system has developed a customer survey to assess its usability. Before distributing the survey, what should the BA do?

Options:

A.

Validate the survey with the project sponsor

B.

Observe customer interaction with the system

C.

Review the risk register with the project sponsor

D.

Update the project plan to include the survey

Question 137

The business analyst (BA) has scheduled an informal review of audit requirements with the compliance officer. The BA wants to demonstrate that the requirements collectively support one another so begins with reviewing the:

Options:

A.

template architectures.

B.

business rules document.

C.

functional specification.

D.

work breakdown structure.

Question 138

A business analyst (BA) is assessing risks on a project addressing the implementation of a new web portal. Which of the following would the BA classify as a project risk?

Options:

A.

Customer service ratings will increase with the new system

B.

Current infrastructure may not support increased performance

C.

Expenditures are currently below budgeted estimates

D.

Support calls will increase if the change is not performed

Question 139

A new regulation is introduced that the project must comply with to remain competitive and industry compliant. Management wants to understand the effect of this new requirement on the project. What will the business analyst (BA) use to evaluate the change?

Options:

A.

Process Modelling

B.

Domain Knowledge

C.

Traceability

D.

Impact Analysis

Question 140

A business analyst (BA) is creating a business process model (BPM) showing how the organization will handle errors reported on its website. The BA held a workshop with stakeholders about how the process might work. The BA was also given an instruction manual about a similar error-handling situation, but was advised that some minor aspects are not applicable to the new process. How can the BA use the manual?

Options:

A.

Ignore the manual's information when creating the BPM since it is about a different situation

B.

Identify the discrepancies in process between the manual and the workshop results and resolve these with stakeholders

C.

Create a new version of the manual based on the original

D.

Rely on the manual to create the BPM and ignore the interview results because no single stakeholder has the whole picture of the process

Question 141

A certain stakeholder requirement has been analyzed and broken down into several solution requirements, each affecting a different IT system. After solution design, the business analyst (BA) receives feedback that

one of the IT systems will take longer than anticipated to implement. What requirements artifact or technique will assist the BA in better understanding the related requirements?

Options:

A.

MoSCoW prioritization

B.

Backlog management

C.

Requirements documentation

D.

Traceability matrix

Question 142

There are competing needs from the different business areas that will use a new system. The business analyst (BA) sets up a weekly meeting with a structured agenda to review the total effort, cost, business impact and risk of each requirement with the business leads to determine what is included in each release of the solution. What approach has the BA defined?

Options:

A.

Prioritization approach

B.

Communication approach

C.

Collaboration approach

D.

Traceability approach

Question 143

A global organization is implementing a new Knowledge Management System and communication to the different regions has been informal. The approach is to convert the few remaining regions iteratively. The team has experienced variances at this point but feels confident in these final conversions. How should the business analyst (BA) communicate the information?

Options:

A.

Repository

B.

Document management

C.

Email

D.

Individual collaboration

Question 144

Requirements have been prioritized in the product backlog for inclusion in the upcoming release. One of the project team members fears that at least one requirement from the prioritization list is not finalized and still requires further analysis. Which of the following factors describe the affected requirement?

Options:

A.

Benefit

B.

Dependency

C.

Stability

D.

Risk

Question 145

A business analyst (BA) is preparing the elicitation activity plan for a project. How will understanding the elicitation scope assist the BA with the elicitation activity?

Options:

A.

By ensuring the requirements are validated in time

B.

By demonstrating how to record elicitation results

C.

By outlining the level of stakeholder collaboration

D.

By determining when elicitation is complete

Question 146

A business analyst (BA) worked with two stakeholders to finalize the access rights related requirements for an internal software application. According to the first stakeholder “Comments, once entered in the application, should be stored for 365 days and should not allow the users to delete”. According to the second stakeholder, “The users with super administrator privileges should be able to add/delete/modify every page/section in the entire application.” Which characteristic does this pair of requirements fail to meet?

Options:

A.

Concise

B.

Consistent

C.

Complete

D.

Complex

Question 147

During the analysis, synthesis, and refinement of elicitation results the business analyst (BA) has discovered that some information is missing. Which course of action would resolve the situation?

Options:

A.

Verify the requirements results

B.

Conduct elicitation activities

C.

Conduct traceability analysis

D.

Validate the requirements

Question 148

A client wants to rehire a business analysis consulting firm for another project. The assigned business analyst (BA) developed a good rapport with the stakeholders, but delivered documents that contained lots of technical jargon that the client could not fully understand. Based on the feedback, the consulting company should:

Options:

A.

recommend a new methodology which is the latest trend in the industry.

B.

assign a different BA to the project.

C.

discuss the feedback during the brainstorming sessions after project completion.

D.

identify performance metrics before commencing work.

Question 149

An organization's Business Analysis Center of Excellence (BACoE) has deployed several business analysts (BAs) to provide business analysis to a cross-functional initiative. After the first phase of the project, the BACoE seeks to determine the effectiveness of the business analysis work. Which of the following techniques could be used to elicit feedback from all affected stakeholders?

Options:

A.

Brainstorming

B.

Business cases

C.

Surveys

D.

Root cause analysis

Question 150

A banking giant recently found a major security loophole in their online banking platform that could expose customer information. Security experts and the business analyst (BA) develop a low cost, low effort emergency fix to address this issue. What factor should the BA use to convince the bank to move forward with the emergency fix?

Options:

A.

Cost

B.

Schedule

C.

Impact

D.

Urgency

Question 151

A large online retailer is introducing new technology to upgrade its aging ordering process. The business analyst (BA) has drawn a stakeholder matrix showing information on how to engage with the stakeholders throughout the project.

as

Using the stakeholder matrix as a guide, how should the BA engage the suppliers?

Options:

A.

Meet with the suppliers to discuss their needs

B.

Ensure the suppliers are kept informed by showing interest in their needs

C.

Communicate changes to the suppliers by general communication

D.

Focus efforts to engage with the suppliers regularly

Question 152

During a requirements elicitation workshop, a stakeholder raises an issue that is outside of the project's scope. The business analyst (BA) facilitating the workshop should:

Options:

A.

note the issue in the Issue Register to be considered by the Project Manager.

B.

ignore the stakeholder's comment and proceed with the agenda.

C.

consider the issue's impact on the project and gain agreement with stakeholders on the next step.

D.

request the stakeholder to explain the issue further so that possible solutions can be discussed.

Question 153

A business analyst (BA) is identifying the functions and features required for a new enterprise software solution. The BA reviews historical documents about the current business processes and then interviews each stakeholder group, individually, asking Questions about current business processes. The BA compares the information obtained during the stakeholder interviews with the information gathered from the historical documents. Which activity is the BA performing with this approach?

Options:

A.

Verification of requirements

B.

Validation of requirements

C.

Confirmation of elicitation results

D.

Capture of elicitation outcomes

Question 154

A one-location restaurant has been a huge success and the owner wants to expand into more markets. The owner wants to ensure that the quality of the food and pleasing atmosphere is maintained without introducing new variables. Working with the key members of the organization, the owner determines that training and standard processes must be defined. The owner engages a business analyst (BA) to create training materials and operating procedures based on the existing processes at the original restaurant. During this documentation, the BA identifies some opportunities for improvement. How must the BA proceed?

Options:

A.

Schedule time with the owner to review any opportunities to improve existing processes and obtainpermission to include changes before documenting

B.

Create documentation based on the observed processes because improvements are outside of the scope of the project

C.

Provide documentation of improved procedures based on the observed opportunities for then new location

D.

Perform benchmarking and market analysis to determine whether there are standard procedures in the restaurant industry that support the opportunities identified

Question 155

A business analyst (BA) is determining the current state as part of a new project. What is an internal enterprise asset that the BA must include in the analysis?

Options:

A.

Brand name

B.

Organizational structure

C.

Business need

D.

Enterprise mission statement

Question 156

A lead business analyst (BA) analyzed the performance of all BA's within the organization. How should the BA approach communicating the results to stakeholders?

Options:

A.

Compare a solution used at another company

B.

Identify the performance objectives

C.

Select performance measures

D.

Determine the reporting requirements

Question 157

A global organization is implementing a new Knowledge Management System, and communication to the different regions has been informal. The approach is to convert the few remaining regions iteratively. The team has experienced variances at this point but feels confident in these final conversions. How should the business analyst (BA) communicate the information?

Options:

A.

Email

B.

Repository

C.

Document management

D.

Individual collaboration

Question 158

A project manager (PM) is planning the project timelines along with a business analyst (BA), and they come across the task of requirement allocation. The PM wants to know what the dependencies are before the requirement allocation task is initiated and seeks the BA's advice. Which of the following is a dependency that the BA will highlight as a prerequisite for requirement allocation?

Options:

A.

Design options are available

B.

Solution approach has been determined

C.

Requirements architecture is approved

D.

Stakeholders are identified

Question 159

A business analyst (BA) is eliciting requirements for a pharmaceutical distribution company with an expansion plan across many states, each with its own tools and methods. To make the requirements as reusable as possible, what should the BA do?

Options:

A.

Describe the requirements at a high level of abstraction.

B.

Provide details for the requirements.

C.

Limit the relationships between requirements.

D.

Make specific references to applications or departments.

Question 160

During planning, elicitation, and sign-off of requirements, the stakeholders felt that their opinions were not heard and information was not frequently shared. What major competency was lacking in this process?

Options:

A.

Communication

B.

Information

C.

Collaboration

D.

Trustworthiness

Question 161

A business owner has identified a high-priority requirement that needs to be implemented immediately. The project manager has asked the business analyst (BA) to conduct an impact analysis of this change. Which factor will the BA need to consider?

Options:

A.

Selection of the elicitation techniques for the requirement.

B.

Number of systems being affected by the requirement.

C.

Original source of the requirement.

D.

Method of requirement communication.

Question 162

A company wants to increase its market share in the industry, and its Board has prioritized capabilities that need to be implemented to achieve the goal. The business requirements for the top priority were signed off, and the solution design has been completed. Due to technical constraints, it is not feasible to implement all the requirements at the same time. What must the business analyst (BA) do to deal with this situation?

Options:

A.

Allocate requirements to different releases

B.

Recommend a reduction in the project scope

C.

Ensure all requirements are traceable using a matrix

D.

Redefine the business requirements associated with each implementation

Question 163

A business analyst (BA) has elicited the following requirement: "The solution must ensure the portal response times are under 2 seconds." What requirement classification schema does this requirement belong to?

Options:

A.

Non-functional requirements

B.

Transitional requirements

C.

Stakeholder requirements

D.

Functional requirements

Question 164

Stakeholder requirements were approved for a business process reengineering initiative along with the creation of a roadmap. Due to market conditions, the product roadmap is modified to move the default process to the next iteration. What should the business analyst (BA) update in the stakeholder requirements?

Options:

A.

Requirement attribute values

B.

Scope model

C.

Requirement description

D.

Requirement performance measures

Question 165

A business analyst (BA) is compiling information on different approaches that will meet solution requirements in order to make a recommendation for solution design. To evaluate whether externally available solutions meet the requirements, which of the following will the BA create and distribute?

Options:

A.

Statement of Work (SOW)

B.

Request for Information (RFI)

C.

Work Breakdown Structure (WBS)

D.

Rough Order of Magnitude (ROM)

Question 166

A business analyst (BA) is given an additional requirement near the end of the development phase that needs to be incorporated into the system as part of the same release. In this situation, the first activity the BA performs to understand the effect of the proposed change is to:

Options:

A.

Check with the project manager for timeline and budget metrics.

B.

Determine whether stakeholders are available for further elicitation.

C.

Determine whether the additional requirement is traceable to a need.

D.

Consult with the technical team for technical feasibility.

Question 167

A business analyst (BA) is preparing an analysis approach to replace a 12-year-old air traffic control system. The BA aims to define the solution definition before implementation, capture theinformation in standardized templates, and ensure that all activities are identified first and then divided into tasks. Which approach provides the appropriate level of formality for this project?

Options:

A.

Reactive

B.

Adaptive

C.

Proactive

D.

Predictive

Question 168

The Business Requirements Document (BRD) prepared by the business analyst (BA) was circulated to stakeholders for approval. Some stakeholders objected to the Use Case diagrams and could not understand them. Why would these be included in the document?

Options:

A.

The models are used for analysis and refining requirements and design.

B.

The models did not change the value to text-based requirements.

C.

The models are part of the technical documents and not part of BRD documents.

D.

The models were included as a mistake because Use Case diagrams are technical.

Question 169

A business analyst (BA) has recently joined a large consultancy firm where BAs are globally distributed on different assignments. Where would the BA find expectations for business analysis work as mandated by the consultancy firm?

Options:

A.

Business analysis approach

B.

Organizational performance standards

C.

Modeling notations standards

D.

Information management approach

Question 170

A company has bought a customizable software product, and the vendor's business analyst (BA) is visiting the company's office to perform a requirements assessment. The business sponsor expresses an interest in improving a specific process that is in scope. What should the BA do?

Options:

A.

Create a process model

B.

Review data flow diagrams

C.

Develop a data model

D.

Observe the activity

Question 171

A new product that is tablet-enabled is being considered to replace an older product to process orders. The data captured is sent to existing downstream applications, which are not being updated. What is the first thing that a business analyst (BA) should consider?

Options:

A.

Developing process and data models

B.

Performing an interface analysis

C.

Conducting a vendor assessment

D.

Identifying constraints and dependencies

Question 172

The business analyst (BA) is preparing for a requirements review with a group of stakeholders. The BA must determine how best to model the requirements for the review. Which of the following guidelines and tools will the BA use?

Options:

A.

Current state description

B.

Domain knowledge

C.

Methodologies and framework

D.

Requirements architecture

Question 173

A business analyst (BA) conducted a requirements elicitation session with project stakeholders and communicated the results. The project sponsor expressed concern with certain requirements that address the federal government legislation. What must the BA do to address the concern of the project sponsor?

Options:

A.

Ensure requirements are traceable up to user acceptance testing.

B.

Reassure the project sponsor that testing will be conducted diligently.

C.

Determine the communication plan for requirements.

D.

Compare requirements with compliance requirements.

Question 174

The business analyst (BA) is investigating techniques that would be appropriate for determining how and who uses data across the identified processes. Which technique should the BA select?

Options:

A.

CRUD (Create, Read, Update, and Delete) matrix

B.

Stakeholder list, map, or personas

C.

Data dictionary

D.

Decision model

Question 175

A project has experienced several schedule delays. A business analyst (BA) is assigned to the project to help get it back on track. The project manager believes that incomplete requirements are causing the missed milestones. What tool will help address the project manager's concern?

Options:

A.

Risk review

B.

Quality control checklist

C.

Decision analysis

D.

Communication plan

Question 176

A business analyst (BA) has structured information so it is easy to find, does not conflict with other information, and is not duplicated unnecessarily. Which additional factor does the BA need to take into account when deciding how to structure the information?

Options:

A.

The number of stakeholders to be consulted

B.

The governance and engagement approach to be used

C.

The level of experience with the repository tool

D.

The size and complexity of the change

Question 177

A business analyst (BA) is tasked with performing a gap analysis between two existing systems to combine into a single system or run just one system. Which of the following modeling formats will show the requirements for both systems side by side?

Options:

A.

Bubble Chart

B.

Activity Flow

C.

Glossary

D.

Matrix

Question 178

A business analyst (BA) is tasked with developing requirements that can be implemented by the development team iteratively. Which characteristic should the requirements exhibit?

Options:

A.

Substantial

B.

Prioritized

C.

Unambiguous

D.

Granular

Question 179

The claims intake workflow of an insurance company is being standardized across all branch offices. The business analyst (BA) assigned to this project has interviewed users individually in all the offices and plans to schedule a workshop with all the users. What should the BA do to prepare for the workshop?

Options:

A.

Construct a decision tree

B.

Build an entity-relationship diagram

C.

Create a model

D.

Develop a work breakdown structure

Question 180

A business analyst (BA) is working on a project that has a release date that cannot be changed. The BA engaged with stakeholders and completed the business requirements elicitation task. Upon review with the rest of the project team, it is determined that not all requirements can be implemented by the set deadline. What must the BA do to ensure maximum business value?

Options:

A.

Ensure test scenarios conform to business requirements

B.

Align business requirements to organizational strategy

C.

Analyze requirements to remove unnecessary components

D.

Choose an appropriate format to communicate requirements

Question 181

A software company wants to make a gradual change from its traditional way of developing requirements to a more adaptive approach. A business analyst (BA) is hired to quantify the probability that the solution will meet the company’s needs and assess the relevant risks. Which element of risk assessment does the BA need to consider?

Options:

A.

Issue management

B.

Negative impact to value

C.

Risk tolerance

D.

Positive evaluation results

Question 182

A business analyst (BA) elicits requirements from end users for a new application and then documents a set of use cases and use case scenarios. What should the BA do next?

Options:

A.

Create acceptance and evaluation criteria

B.

Review the use case scenarios

C.

Identify all the roles and responsibilities

D.

Conduct a requirements workshop

Question 183

A project is being initiated to enhance an online product because sales have declined for over a year. The company leaders are confident that all of the skills needed to improve the product exist within the company. By enhancing the product, sales will increase, and new customers will emerge. A business analyst (BA) will help the enhancement project by first:

Options:

A.

Identifying the stakeholders

B.

Implementing a suitable solution

C.

Documenting the requirements

D.

Evaluating the business need

Question 184

A business analyst (BA) is negotiating and resolving conflict with stakeholders to ensure they participate in the required BA activities. Which element of stakeholder management is the BA performing?

Options:

A.

Plan stakeholder engagement

B.

Monitor stakeholder engagement

C.

Gain agreement on commitments

D.

Confirm elicitation results

Question 185

A business analyst (BA) is identifying the functions and features required for a new enterprise software solution. The BA reviews historical documents about the current business processes and then interviews each stakeholder group individually, asking questions about current business processes. The BA compares the information during the stakeholder interviews with the information gathered from the historical documents. Which activity is the BA performing with this approach?

Options:

A.

Capture of elicitation outcomes

B.

Validation of requirements

C.

Confirmation of elicitation results

D.

Verification of requirements

Question 186

A business owner has marked certain requirements as high priority for the upcoming release. After performing some analysis, the project team concluded that some of these requirements are not actually high priority and can be implemented in later releases. How should the project team proceed with prioritizing requirements?

Options:

A.

Implement the requirements that the project team considers important.

B.

Execute the requirements that the business owner identified.

C.

Change the priority of the requirements by performing a re-ranking.

D.

Consult with the business owner to discuss possible trade-offs.

Question 187

A business analyst (BA) held a formal walkthrough of requirements developed on a project. Stakeholders expressed concerns because they had different interpretations of the requirements. What activity would help ensure a common understanding?

Options:

A.

Ensure compliance with key performance indicators

B.

Ensure consistent referencing of requirements

C.

Ensure correct terminology is used

D.

Ensure appropriate templates are used throughout elicitation

Question 188

A business analyst (BA) is facilitating a meeting with subject matter experts (SMEs) in which the SMEs are answering questions about the major business processes and associated activities the business performs. The BA will create a deliverable from this discussion that will assist in defining scope. What technique is the BA using?

Options:

A.

Decision modeling

B.

Mind mapping

C.

SWOT analysis

D.

Functional decomposition

Question 189

A business analyst (BA) has been tasked with examining and analyzing the relationship between a set of requirements by verifying that they are unambiguous. What will the BA be looking for?

Options:

A.

That the relationship is necessary for understanding the requirements holistically.

B.

That relationships are described in the same way, using the same set of standard descriptions.

C.

That there is a genuine relationship and that the type of relationship is described.

D.

That there are no relationships that link elements in two different and conflicting ways.

Question 190

An organization's board of directors has funded a new mobile application to support external customers. The business case was developed with an emphasis on objectives to broaden the organization's brand and increase customer engagement. The business analyst (BA) is reviewing a group of user stories with the product owner. One of these user stories is:

"As a customer service representative, I need to enter my time on the mobile application so that I can leave work to pick up my sick daughter from school."

The product owner wants to take advantage of this opportunity to provide the staff with a way to enter their time away from the office and create an interface to the Payroll application. How must the BA evaluate alignment with the existing objectives?

Options:

A.

Add the functionality to the list of requirements.

B.

Review business objectives and determine potential value.

C.

Ask the product owner to rank this user story against the existing product backlog.

D.

Suggest that the story be included with a change to the solution scope or be removed.

Question 191

A company wants to increase transaction service offerings using its online channels. The existing application already has some of the required functionality. A new project has been initiated to implement the additional capabilities, but the company management is unsure of the complexity of the project. What exercise must be carried out to determine the changes needed in the new application?

Options:

A.

Perform gap analysis of current and future states

B.

Evaluate competitor applications

C.

Assess organizational culture

D.

Identify internal solution component dependencies