Certification of Capability in Business Analysis (CCBA) Questions and Answers

Question 1

A Chief Information Officer (CIO) was discussing a solution approach for a technology project in a meeting where a business analyst (BA) was also present. Stakeholders were discussing advantages and disadvantages of each solution approach. What should be the top priority for the BA in assessing the solution approach?

Options:

A.

The trade-off and value to stakeholder

B.

The strategy alignment with the balanced scorecard

C.

The total cost of ownership of the project

D.

The strategy design options

Question 2

A software company wants to make a gradual change from its traditional way of developing requirements to a more adaptive approach. A business analyst (BA) is hired to quantify the probability that the solution will meet the company's needs and assess the relevant risks. Which element of risk assessment does the BA need to consider?

Options:

A.

Negative Impact to value

B.

Positive Evaluation Results

C.

Risk Tolerance

D.

Issue Management

Question 3

A business. analyst (BA) is working on a project to implement a commercial off-the-shelf application for tracking customers. In an observation session with a Domain subject matter expert (SMF). the BA notes that the SME keeps separate records for the customers who are also vendors. The BA knows that the new software has a module for vendor management that would integrate the vendor and customer records. Which type of opportunity has the BA identified?

Options:

A.

Reduction of duplicate tasks performed by staff

B.

Potential to provide future value supported by the system

C.

Ability to provide greater amount of information to staff

D.

Automation to increase consistency of behavior

Question 4

A business analyst (BA) is tasked with performing a gap analysis between two existing systems to combine into a single system or run just one system. Which of the following modelling formats will show the requirements for both systems side by side?

Options:

A.

Activity Flow

B.

Matrix

C.

Glossary

D.

Bubble Chart

Question 5

A business analyst (BA) decided to capture requirements by inviting all the stakeholders to meet at an office location. After invitations were sent, it turned out that not everyone could attend this meeting because of their individual dispersed locations.

Which of the following does the BA need to adjust to handle this situation?

Options:

A.

Project stakeholders

B.

Logistics setup

C.

Elicitation scope

D.

Elicitation technique

Question 6

A business analyst (BA) is proposing design options and a number of opportunities are occurring that need to be understood further. One particular opportunity will prevent different stakeholders from performing the same function in distinctly different ways. What type of opportunity is this?

Options:

A.

Reduced barriers to entry

B.

improved access to information

C.

increased efficiency

D.

Additional capabilities

Question 7

A project has experienced several schedule delays. A business analyst (BA) is assigned to the project to help get it back on track. The project manager believes that incomplete requirements are causing the missed milestones. What tool will help address the project manager's concern?

Options:

A.

Quality control checklist

B.

Communication plan

C.

Decision analysis

D.

Risk review

Question 8

A business analyst (BA) is assigned a new project and is beginning to prepare for elicitation. Which task must the BA complete before preparation of the elicitation process can begin?

Options:

A.

Coordinate meeting logistics

B.

Approve anticipated expenses

C.

Gather contact information of stakeholder

D.

Collect information on the business need

Question 9

A business analyst (BA) develops a template to document the product feature requirements for an enterprise software solution. Within the template, the BA includes the following additional information: source, priority level, level of complexity, and last modified date. What does the additional information describe?

Options:

A.

Requirement analysis

B.

Requirement traceability

C.

Requirement attributes

D.

Requirement management

Question 10

During a lesson learned session, stakeholders had a heated discussion on the performance measures being employed and why they are necessary. The business analyst (BA) explained that performance measures are required to:

Options:

A.

evaluate whether the required return on investment is met.

B.

gather insights into the value provided by a solution.

C.

decide if similar projects should be taken up again.

D.

verify that organizational resources were spent wisely.

Question 11

A business analyst (BA) has executed the last planned workshop in a series in order to verify requirements. All issues have been logged in an issues register. What technique is used to manage and resolve the outstanding issues?

Options:

A.

Requirements documentation

B.

Requirements analysis

C.

Metrics and KPIs

D.

Item backing methods

Question 12

After an initial project kick-off meeting, the business analyst (BA) determined that the project has a short deadline and a regulatory mandate with stiff penalties for non-compliance. The stakeholders do not want to risk missing the deadline, and management is willing to commit any amount of resources to meet the deadline. Which kind of approach is suitable for the initiative?

Options:

A.

Crystal clear development process

B.

Kanban development process

C.

Predictive development process

D.

Adaptive development process

Question 13

A business analyst (BA) has elicited non-functional information for a system's replacement. In reviewing the elicitation results, the BA finds the number of concurrent users is a large portion of the target user group, which seems high. How should the BA proceed?

Options:

A.

Observe a user performing the task to determine the length of time to complete the task

B.

Document the elicitation results in the solution requirements specification then seek verification and validation in a requirements review

C.

Conduct additional stakeholder analysis to determine whether any additional user groups were overlooked

D.

Confirm elicitation results by researching the actual concurrent users on the existing system and review findings with stakeholders

Question 14

A business analyst (BA) is preparing an analysis approach to replace a 12-year-old air traffic control system. The BA aims to define the solution definition before implementation, capture the information in standardized templates, and ensure that all activities are identified first and then divided into tasks. Which approach provides the appropriate level of formality for this project?

Options:

A.

Predictive

B.

Reactive

C.

Proactive

D.

Adaptive

Question 15

A business owner has marked certain requirements as high priority for the upcoming release. After performing some analysis, the project team concluded that some of these requirements are not actually high priority and can be implemented in later releases. How should the project team proceed with prioritizing requirements?

Options:

A.

Change the priority of the requirements by performing are ranking

B.

Consult with the business owner to discuss possible trade-oils

C.

Implement the requirements that the project team considers important

D.

Execute the requirements that the business owner identified

Question 16

A business analyst (BA) is defining constraints for a project. Which of the following is a valid constraint?

Options:

A.

“The solution must be implemented in six (6) months.”

B.

“The solution must increase sales by 20%.”

C.

“The solution must promote workplace safety.”

D.

“The solution must reduce support calls by 20%.”

Question 17

For a new account payable (AP) solution, the solution owner has provided the business analyst (BA) with goals the AP management team would like the solution to support. To ensure the solution meets these needs, the BA documents key performance indicators (KPIs). Which of the following is an example of a KPI?

Options:

A.

“The solution will send payment notification to the account holder after successful processing

B.

“The solution will report the average number of days an account payment is outstanding”

C.

“The solution will reduce the payment processing time from three days to two days”

D.

“The solution will enable account holders to make account payments via a web form”

Question 18

Two stakeholders are arguing over which model to use for describing requirements. One insists that using an activity diagram is superior while the other prefers a state diagram. How should the business analyst (BA) resolve the conflict?

Options:

A.

Explain that the models are complementation to each other

B.

Allow both stakeholders to work on the models independently

C.

Introduce a third model type so that neither stakeholder prevails

D.

Suggest a fusion model that integrates activity and state diagrams

Question 19

An organization has hired a consulting firm to implement and customize a software solution they purchased. The firm has raised concerns regarding the effort required to develop a solution that meets all requirements. On what basis should the requirements be prioritized in this context?

Options:

A.

Benefit

B.

Cost

C.

Risk

D.

Penalty

Question 20

A business analyst (BA) is in the process of specifying the confirmed results of a requirements elicitation workshop. Which of the following help to ensure that the correct information about the requirements is provided to the participants?

Options:

A.

Requirements architecture

B.

Stakeholder list

C.

Standard templates and syntax

D.

Roles and permissions matrix

Question 21

A business analyst (BA) is working on a data-centric IT project. The business stakeholders develop the content but do not understand the technical aspects while the IT team believes that there is no need to understand the business issues. Which deliverable will facilitate understanding between IT and the business stakeholders?

Options:

A.

Data models

B.

Data dictionary

C.

Transition requirements

D.

Non-functional requirements

Question 22

A project is being initiated to enhance an on-line product because sales have declined for over a year. The company leader’s ant confident that all of the skills needed to improve the product exist within the company. By enhancing the product, sales will increase and new customers will emerge. A business analyst (BA) will help the enhancement project by first:

Options:

A.

documenting the requirements.

B.

identifying the stakeholders.

C.

implementing a suitable solution.

D.

evaluating the business need.

Question 23

Project work is taking place to evaluate whether a system's requirements can be met via creating internally, purchasing from others, or a combination of the two. What goal is addressed by this analysis?

Options:

A.

Developing the project plan

B.

Outlining the change control strategy

C.

Defining the solution approach

D.

Validating the requirements

Question 24

After a walk-through of the requirements specification with the business users, the group determines that five requirements are now mandatory due to new government regulations. What should the business analyst (BA) do following the meeting?

Options:

A.

Update the priority of the requirements and record the reason for doing so

B.

Ask the test analyst to ensure that test cases are only written to cover the new requirements

C.

Escalate the decision to the project manager to confirm with all users again

D.

Help the system analyst create a prototype of the requirements to demo to the users

Question 25

A business analyst (BA) is developing requirements for a project with a limited budget. The business owner will be prioritizing requirements so that low value requirements can be de-scoped and the project remain within budget. Which of the following should the BA take into account to facilitate prioritization and ensure business objectives are met?

Options:

A.

Data flow

B.

Functional decomposition

C.

Traceability

D.

Dependencies

Question 26

A project manager (PM) is planning the project timelines along with a business analyst (BA) and they come across the task of requirement allocation. The PM wants to know what the dependencies are before the requirement allocation task is initiated and seeks the BA's advice. Which of the following is a dependency that the BA will highlight as a predecessor for requirement allocation?

Options:

A.

Requirements architecture is approved

B.

Design options are available

C.

Solution approach has been determined

D.

Requirement are validated

Question 27

The product backlog refinement meeting for a project is complete but two stakeholders do not agree on the priority of several product backlog items. What should the business analyst (BA) do to help move the project forward?

Options:

A.

Schedule a backlog walkthrough with the two stakeholders

B.

Confirm the authority of the two stakeholders

C.

Notify the project manager

D.

Apply the previous backlog priority

Question 28

A company wants to launch a new product that will have similar features to an existing product. A business analyst (BA) working on the project has invited the product manager to explain the features and business rules of the new product. Which activity must the BA perform in preparation of the session?

Options:

A.

Align the scope of the project to the company’s strategy

B.

Review information about the existing project

C.

Ensure requirements are traceable

D.

Determine the communication plan for requirements

Question 29

A change to support a regulatory requirement is proposed for inclusion in the scope of a project. A business analyst (BA) conducts an impact analysis to determine the extent of the change. What previous task could assist the BA in performing the impact analysis?

Options:

A.

Update use case scenarios

B.

Perform a risk analysis

C.

Create requirement relationships

D.

Conduct a cost-benefit analysis

Question 30

A business analyst (BA) is working on a project for a media company. The BA has verified, validated, and prioritized the requirements based on business benefits. During the development phase, the team discovered that the current viewer will no longer be supported by the provider. The technical team needs to either upgrade to the newer version with different technology or find an alternate viewer. Given this new information, what is the next step for the BA?

Options:

A.

Assess the impacts and re-prioritize the requirements based on technical constraints

B.

Continue the project as it is currently important to focus on customer satisfaction

C.

Convince stakeholders that the business benefits are unachievable due to technical constraints

D.

Communicate the technical constraints to customers

Question 31

An organization is planning to launch an exciting new service that has never been offered before. The expectations are that the service will be extremely popular with young families but, because the organization wants to keep it a secret until launch day. there is no way of knowing whether this is correct. Why does the business analyst (BA) suggest identifying high customer demand by young families as an "assumption?

Options:

A.

To assess the costs and benefits accurately

B.

To prove the idea is correct

C.

To manage the associated risks

D.

To provide a benchmark future change

Question 32

A business analyst (BA) held a formal walk through of requirements developed on a project. Stakeholders expressed concerns because they had different interpretations of the requirements. What activity would help ensure a common understanding?

Options:

A.

Ensure appropriate templates used throughout elicitation

B.

Ensure consistent referencing of requirements

C.

Ensure compliance with key performance indicators

D.

Ensure correct terminology is used

Question 33

A key stakeholder has requested an extensive range of performance measures for a replacement workflow system. A business analyst (BA) has decided to work closely with the stakeholder to validate the performance measures requested. The BA will be ensuring that the performance measures:

Options:

A.

are ether qualitative or quantitative measurements, but not both.

B.

align to industry benchmarks gathered for similar solution implementations.

C.

are written in the correct format. using the agreed standards and terminology.

D.

align with other measures within the broader context of the solution.

Question 34

A finance manager wants to begin a new project to replace the existing expenses processing system. The finance manager feels that the current expense submission-to-reimbursement process takes too long and is substantiated by 50% more complaints regarding incorrect reimbursement amounts than the same time last year. What should the business analyst (BA) investigate first?

Options:

A.

Submission processes to determine which activities can be fully automated

B.

Business process to uncover inefficiencies and falling control points

C.

Enterprise information model to ensure definitions are still valid

D.

Finance solution vendors for inclusion in a Request for information

Question 35

A business analyst (BA) is designing solutions for a set of requirements and finds that there is an opportunity to improve the operations of the business. Which of the following is an opportunity for improvement the BA could recommend?

Options:

A.

Create a solution by constructing a number of solution components to meet the requirements

B.

Enable the solutions that will satisfy the highest priority requirements and stakeholder needs

C.

Provide information to staff so they can answer customer inquiries directly themselves

D.

Purchase software that contains features that are not currently required but are included for free

Question 36

A business analyst (BA) has been tasked with examining and analyzing the relationship between a set of requirements by verifying that they are unambiguous. What will the BA be looking for?

Options:

A.

That there are no relationships that link elements two different and conflicting

B.

That relationship is described in the same way, using the same set of standards

C.

That there is a genuine relationship and that the type of the relationship is described

D.

That the relationship is necessary for understanding the requirements holistically

Question 37

The human resources department of an organization needs a new report. The business analyst (BA) assigned to this effort has scheduled a requirements workshop with the users. Users from the legal department have also been invited to the workshop. As the BA sets up the workshop, what can be done in advance to ensure a productive and focused workshop?

Options:

A.

Document the feedback

B.

Facilitate the workshop

C.

Create an agenda

D.

Reserve a location

Question 38

A business analyst (BA) is examining the relationships between elicited requirements on a project. What quality criteria must be satisfied when the BA is defining requirements relationships?

Options:

A.

Priority

B.

Complexity

C.

Necessary

D.

Source

Question 39

A business analyst (BA) has completed multiple workshops involving a number of stakeholders including the project manager however, the elicitation results are inconsistent between the stakeholders. How should the variation in results be resolved?

Options:

A.

The project manager should decide which requirement is relevant.

B.

The BA should select which requirements are correct.

C.

The project manager should model requirements in a review meeting.

D.

The BA should model the elicited requirements in a review meeting.

Question 40

All of the following stakeholders participate in the prioritization of requirements except for which one?

Options:

A.

Project team

B.

Implementation subject matter expert

C.

Domain subject matter expert

D.

Project manager

Question 41

Which element of the process of assessing the capability gaps is best described as gathering as much enterprise architecture information as is available about the current state of the organization and the areas affected by the business need?

Options:

A.

Current capability analysis

B.

Current organizational needs assessment

C.

Enterprise architecture assessment

D.

Snapshot baseline

Question 42

Holly is the business analyst for her organization and she's leading a requirements workshop for a proposed solution. In this workshop, Holly is using a requirements tracing matrix to help prevent against scope creep. What is scope creep?

Options:

A.

It's the removal of the things that don't conform to the quality of the requirements.

B.

It's the addition of the things that aren't needed to consume the project budget.

C.

It's the addition of the things that don't trace back to the original project scope.

D.

It's the addition of the deliverables that don't trace back to the original business goals to the project scope.

Question 43

You are the business analyst for your organization and you're preparing to elicit requirements from the stakeholders. You've gathered several inputs to help with the elicitation process. Which input(s) will be used to ensure that you understand the type of information that should be elicited from the stakeholders?

Options:

A.

Stakeholder list

B.

Risk assessment

C.

Business need

D.

Roles and responsibility

Question 44

You are the business analyst for your organization and your requirements for the endeavor have recently been approved. Your organization creates a baseline for the requirements based on the approval of the requirements. What must happen in your business analysis activities if the requirements for your endeavor need to be changed?

Options:

A.

You'll need to create new baselines.

B.

You'll need to implement configuration management.

C.

You'll need to use a change control system.

D.

You'll need to create requirements versioning.

Question 45

In order to assess the capability gaps of an organization, you'll need all of the following inputs except for which

one?

Options:

A.

Solution performance assessment

B.

Enterprise architecture

C.

Solution scope

D.

Business need

Question 46

You are a business analyst for your organization and you're working with Mary. Mary wants to know what you need to complete the process of planning the business analysis approach if you're already the business analyst for your organization. This approach helps to find out the following except for which one?

Options:

A.

Which stakeholders need to be involved in the decision?

B.

Who will be consulted regarding and informed of the approach?

C.

Who will be observed in job shadowing?

D.

What is the rationale for using it?

Question 47

Which business analysis task in the requirements management and communication domain is best described as creating and maintaining relationships among business objectives, requirements, team deliverables, and solution components to support business analysis activities?

Options:

A.

Communicate requirements.

B.

Prepare the requirements package.

C.

Manage requirements traceability.

D.

Document requirements for review.

Question 48

You need to identify assumptions as part of the assessment of capability gaps. Which of the following is an example of an assumption?

Options:

A.

The project manager believes that her project team members can program in COBOL.

B.

The software must be compatible with the current operating system.

C.

The risk in the project must be quantified.

D.

All vendors must have security clearance.

Question 49

Kelly is the business analyst for her organization and she's identifying roles and responsibilities of the people involved in business analysis activities. Her manager has asked Kelly to create the RACI matrix to accomplish this task. What is the RACI matrix?

Options:

A.

The RACI matrix is a roles and responsibilities chart that uses the legend of Responsible, Action, Controlled, and Informed.

B.

The RACI matrix is a roles and responsibilities chart that uses the legend of Role, Action, Controlled, and Information.

C.

The RACI matrix is a roles and responsibilities chart that uses the legend of Responsible, Accountable, Consulted, and Informed.

D.

The RACI matrix is a roles and responsibilities chart that uses the legend of Risk, Action, Cost, and Information.

Question 50

You are the business analyst for a smaller project where there are few requirements. Management would still like you to create a method to trace the few requirements for this project. What type of matrix would be best in this instance?

Options:

A.

Coverage matrix

B.

Requirements trace matrix

C.

Roles and responsibility matrix

D.

RACI matrix

Question 51

Which stakeholder(s) will be involved to determine if the requirements can be implemented?

Options:

A.

Domain subject matter expert

B.

Implementation subject matter expert

C.

Project team members

D.

Sponsor

Question 52

Jon is a business analyst for his organization and he's preparing for the process of elicitation. How many inputs are available for Jon to use in the elicitation process?

Options:

A.

7

B.

5

C.

6

D.

4

Question 53

A business analyst has been assigned the task of developing a model of the current state of an organization. The business analyst doesn't understand why a current state may be needed. All of the following are good reasons to create a current state model of an organization except for which one?

Options:

A.

Analyzing the current state of the organization to look for opportunities for improvement

B.

Assessing the positive and negative risks that may exist within the current state

C.

Validating the solution scope with businesses and technical stakeholders

D.

Assisting stakeholders to understand the current state

Question 54

John and Hanna are business analysts in their organization and they are completing the verification activities to check for completeness of the requirements. When should John and Hanna perform these verification activities?

Options:

A.

At each milestone of the requirements analysis process

B.

Once all of the requirements have been gathered

C.

Iteratively throughout the requirements analysis process

D.

As often as the requirements management plan calls for

Question 55

You are the business analyst for your organization and you're working to identify all of the stakeholders within your organization and outside

your organization to ensure that you've captured the correct requirements for a project. Which one of the following techniques can be best suited for identifying stakeholders?

Options:

A.

Interviews

B.

User stories

C.

Acceptance and Evaluation Criteria

D.

Risk analysis

Question 56

You are a business analyst for your organization and you're working with Mary. Mary wants to know what you

need to complete the process of planning the business analysis approach if you're already the business analyst for your organization. Which of the following statements is true regarding the plan business analysis approach?

Options:

A.

The plan business analysis approach describes the amount of budget needed for the requirements elicitation.

B.

The plan business analysis approach is required to select an approach that will perform business analysis.

C.

The plan business analysis approach describes the processes the business analyst will or will not do, based on the time and budget available.

D.

The plan business analysis approach describes the amount of time needed for the business analysis approach.

Question 57

Which of the following is the prime purpose of the Manage Stakeholders Expectations process?

Options:

A.

Identify stakeholders

B.

Close project

C.

Resolve issues

D.

Updating risk registers

Question 58

Sam is preparing for the task of prioritizing requirements and he'll need five inputs to accomplish the task. Which one of the following is not an input that Sam will use to prioritize requirements?

Options:

A.

Risk analysis

B.

Business need

C.

Requirements management plan

D.

Business case

Question 59

Mary is the business analyst for your organization. She asks you what the purpose of the assess capability gaps task is. Which of the following is the best response to give Mary?

Options:

A.

It identifies the skill gaps in the existing resources.

B.

It identifies the causal factors that are contributing to an effect the solution will solve.

C.

It identifies new capabilities required by the organization to meet the business need.

D.

It describes the ends that the organization wants to improve.

Question 60

A business analyst is helping management determine which solution they should choose. As it happens that the organization can only choose one of the two solutions due to time and resource restrictions. Solution A worth $456,000 to the organization while solution B worth $565,000 to the organization. While solution A costs less, it is less risky and takes less time to complete so management elects to seize Solution A. What is the opportunity cost?

Options:

A.

$565,000

B.

There is not enough information to know how much the solution will cost the organization.

C.

$109,000

D.

$456,000

Question 61

You are the project manager of the NGQQ Project for your company. To help you communicate project status to your stakeholders, you are going to create a stakeholder register. All of the following information should be included in the stakeholder register except for which one?

Options:

A.

Assessment information of the stakeholders' major requirements, expectations, and potential influence

B.

Stakeholder management strategy

C.

Stakeholder classification of their role in the project

D.

Identification information for each stakeholder

Question 62

You are the business analyst for your organization. You're considering if you should make a solution or purchase it from a vendor. If your team creates the solution, it will cost $286,000 and will cost $2,400 per month to support. The vendor's solution, however, will cost $239,000 and will cost $2,850 per month to support. How long will you need to use your in-house solution to be more cost effective than the vendor's proposed solution?

Options:

A.

105 months

B.

32 months

C.

64 months

D.

19 months

Question 63

What type of requirements elicitation technique is the Delphi Technique?

Options:

A.

Survey

B.

Workshop

C.

Prototyping

D.

Round table

Question 64

A business analyst has determined that there are five possible solutions to a business need. If the business analyst completes the solution assessment on multiple solutions, what is the goal of the assessment?

Options:

A.

The business analyst should determine which solution has the greatest business value.

B.

The business analyst should determine the opportunity cost of each assessment.

C.

The business analyst should only have one solution, not five.

D.

The business analyst should determine which solution is quickest to implement.

Question 65

Enterprise analysis provides many things for an organization. All of the following are tasks included in enterprise analysis except for which one?

Options:

A.

Assess capability gaps

B.

Determine solution approach

C.

Define business need

D.

Solution performance assessment

Question 66

In order to have high quality in requirements, all of the following characteristics should exist in the requirements except for which one?

Options:

A.

Cohesive

B.

Consistent

C.

Complete

D.

Constrained

Question 67

When a business analyst wants to present requirements for review, she must consider the requirements, audience, and what other factor to determine the level of formality in the presentation?

Options:

A.

Standards

B.

Organizational process assets

C.

Governance

D.

Regulations

Question 68

Which approach to business analysis activities deals with rapid delivery of the business value?

Options:

A.

Quality-driven

B.

Change-driven

C.

Plan-driven

D.

Stakeholder-driven

Question 69

You are the business analyst for your organization and you're working with the key stakeholders to validate the requirements. In your review, you have determined the business value of each requirement and you've discovered three requirements that do not deliver direct or indirect value to the stakeholders. What should you do with these requirements?

Options:

A.

Determine their purpose in the requirements set.

B.

Justify their existence.

C.

See if the requirements are integrated with other requirements.

D.

Remove them from the requirements set.

Question 70

You are the business analyst for your organization and working with the stakeholders to prioritize the requirements. The stakeholders are concerned about the financial impact of the requirements should some of them fail during the implementation. You would like to rank the risk tolerance of the stakeholders based on their comments about the solution and the requirements. The following are the three categories of risk tolerance associated with the stakeholders except for which one?

Options:

A.

Neutrality

B.

Mitigation

C.

Risk-seeking

D.

Risk-aversion

Question 71

As a business analyst, you should work to identify opportunities to improve the operations of your organization. Which one of the following improvement opportunities aims to improve the experience of the customer?

Options:

A.

Eliminate redundancy.

B.

Automate or simplify the work people perform.

C.

Increase consistency of behavior.

D.

Improve the purchasing process.

Question 72

You are the business analyst for your organization. You are currently working with Susan on creating a model as part of the specify and model requirements process. Susan doesn't understand why you need a model. You explain to Susan that a model is just a simplified representation of a complex reality that is useful for understanding that reality and making decisions regarding it. In fact, you tell Susan, model can do all of the following except one option. Choose the option that model cannot do?

Options:

A.

Define the resources that will be needed on the project team

B.

Define boundaries for the business domain

C.

Describe a situation or problem

D.

Describe thought processes and action flows

Question 73

What can be considered the only input to the task of defining assumptions and constraints?

Options:

A.

Business case

B.

Prioritized requirements

C.

Requirements

D.

Stakeholder concern

Question 74

Which of the following is used as a means of validating a created, selected, or tailored business analysis approach?

Options:

A.

Process modeling

B.

Progressive elaboration

C.

Decision analysis

D.

Structured walkthrough

Question 75

You have identified a task in your task list that cannot be completed until the inspector for the project signs off on the initial deliverables. The inspector's signoff on the initial deliverables is called what?

Options:

A.

Constraint

B.

Assumption

C.

Dependency

D.

Milestone

Question 76

Barry is a project stakeholder that is excited about the deliverable your project wants to create for the organization. He's helpful, provides information, and offers support whenever your project needs it. How would you classify Barry based on this information?

Options:

A.

Positive stakeholder

B.

Cheerleader

C.

Project sponsor

D.

Project team member

Question 77

Beth is a business analyst for her organization and she's discussing the solution with her key stakeholders. Beth is considering that moving to a new operating system, new office software, and new customized applications will be too much for the end users to learn and to manage their ongoing responsibilities. What task is Beth completing in this scenario?

Options:

A.

Manage the stakeholders.

B.

Evaluate solution performance.

C.

Define transition requirements.

D.

Assess organizational readiness.

Question 78

Bradley is working with the business analyst Marsha to prioritize requirements for their organization. Marsha insists that the requirements be ranked on the cost-benefits analysis of the relative value to the organization. What type of prioritization approach does Marsha want to use in this scenario?

Options:

A.

Likelihood of success

B.

Business value

C.

Urgency

D.

CBR Ratio

Question 79

A business analyst (BA) is working to identity the business need, specifically the problems with the current state of a process. At which level of the enterprise can the BA identify problems with the current state?

Options:

A.

Bottom-up

B.

Top-down

C.

From external drivers

D.

From middle-management

Question 80

A stakeholder would like to add requirements to an IT project which is in flight. The project manager wants to revisit the traceability repository prior to committing to the addition of any new requests, because it is used for which of the following activities?

Options:

A.

Creating test plans and test cases

B.

Approving requirement relationships

C.

Developing documentation for technical support

D.

Supporting change and scope management

Question 81

The business analysis (BA) team is evaluating a new commercial off-the-shelf (COTS) application that will be implemented in the coming months. The company has over 20 legacy systems deployed. The Chief Information Officer (CIO) is worried about the need for integration and that some key linkages are missing.

What is the BA team evaluating?

Options:

A.

Technology and infrastructure

B.

Industry standard architecture

C.

Service oriented architecture

D.

Business architecture

Question 82

An organization prefers to execute projects using an adaptive approach. However, the new project is much more complex than previously executed projects. What will the business analyst (BA) recommend?

Options:

A.

Select an extreme programming approach

B.

Review current approach with key stakeholders

C.

Follow a predictive approach

D.

Choose an agile programming approach

Question 83

A business analyst (BA) is identifying the functions and features required for a new enterprise software solution. The BA reviews historical documents about the current business processes and then interviews each stakeholder group, individually, asking Questions about current business processes. The BA compares the information obtained during the stakeholder interviews with the information gathered from the historical documents. Which activity is the BA performing with this approach?

Options:

A.

Verification of requirements

B.

Validation of requirements

C.

Confirmation of elicitation results

D.

Capture of elicitation outcomes

Question 84

A business analyst (BA) is eliciting requirements for a pharmaceutical distribution company with an expansion plan across many states, each with their own tools and methods. To make the requirements as re-usable as possible, what should the BA do?

Options:

A.

Make specific references to applications or departments

B.

Provide details for the requirements

C.

Describe the requirements at a high level of abstraction

D.

Limit the relationships between requirements

Question 85

A business analyst (BA) is planning to elicit requirements. The BA understands the scope of the elicitation and has selected interviewing as an appropriate technique. Which of the following is part of the logistics for these interviews?

Options:

A.

Relationships between elicited requirements

B.

Performance metrics

C.

Definition of the future state

D.

Participants and their roles

Question 86

A senior business analyst (BA) is tasked with verifying a set of requirements written by a junior BA for a

system. During this exercise, the junior BA will ensure that the requirements exhibit atomic characteristics. The senior BA will be verifying that the requirements:

Options:

A.

can be understood independently of other requirements.

B.

are written using terminology common for the audience.

C.

contain no extraneous and unnecessary content.

D.

are aligned with the identified need of the stakeholders.

Question 87

A business analyst (BA) is working on a project involving the purchase of a commercial off-the-shelf (COTS) product. All internal risks have been identified and assessed. What is the BA's next course of action?

Options:

A.

Review the business objectives

B.

Consult the business case

C.

Assess external risks

D.

Perform an environmental scan

Question 88

A new payments system was recently implemented to replace an old legacy system. The system users have lodged a complaint that the new system is slower than the old system but system performance statistics show more efficiency. How does the business analyst (BA) demonstrate to users how the new system is performing?

Options:

A.

Collect system metrics and communicate results in an understandable format

B.

Identify the dependencies of the system with other applications

C.

Analyze the feasibility of including additional hardware resources to the system

D.

Evaluate the payments process to identify areas of improvement in the system

Question 89

A business analyst (BA) has completed documenting requirements and to save time, recommends sharing the requirements document with the development team to fast-track development immediately. What issue may arise by doing so?

Options:

A.

Stakeholders may refuse the solution.

B.

Requirements metrics may not be measurable.

C.

The BA may significantly impact other aspects of the project timeline.

D.

The business need may change.

Question 90

A system owner calls the project team to inquire about a recent change in one of the requirements, and insists that the change was never requested. What should the project team do to investigate the issue?

Options:

A.

Record a defect for fixing

B.

Consult with the project manager

C.

Revert back the changes

D.

Check the audit history of changes

Question 91

A business analyst (BA) is working on a project that follows incremental and iterative approaches. The BA and the stakeholders have shortlisted several user stories to be considered in the project scope. Which of the following methods would enable them to arrive at a common understanding on delivering value in the product and ranking the stories?

Options:

A.

Story decomposition

B.

State modelling

C.

Value stream mapping

D.

MoSCoW prioritization

Question 92

A business analyst (BA) has discovered an old checklist prepared for another initiative, which includes the following characteristics: Complete, Feasible, Unambiguous, Testable. What is the purpose of this checklist?

Options:

A.

To verify requirements

B.

To measure solution performance

C.

To validate requirements

D.

To compare solution options

Question 93

A business analyst (BA) has been spending the majority of the past week cataloguing the new, removed, and modified components of an upcoming project. What is the main purpose of the BA performing this work?

Options:

A.

To establish the key performance indicators

B.

To define the future state

C.

To identify the domain subject matter expert

D.

To document the current state

Question 94

A one-location restaurant has been a huge success and the owner wants to expand into more markets. The owner wants to ensure that the quality of the food and pleasing atmosphere is maintained without introducing new variables. Working with the key members of the organization, the owner determines that training and standard processes must be defined. The owner engages a business analyst (BA) to create training materials and operating procedures based on the existing processes at the original restaurant. During this documentation, the BA identifies some opportunities for improvement. How must the BA proceed?

Options:

A.

Schedule time with the owner to review any opportunities to improve existing processes and obtain

permission to include changes before documenting

B.

Create documentation based on the observed processes because improvements are outside of the scope of the project

C.

Provide documentation of improved procedures based on the observed opportunities for then new location

D.

Perform benchmarking and market analysis to determine whether there are standard procedures in the restaurant industry that support the opportunities identified

Question 95

During a project to replace an existing system, requirements for new functionality were elicited. Upon further investigation, additional types of requirements related to other features and characteristics were also identified. What can facilitate effectively understanding the different types of requirements?

Options:

A.

Fishbone diagram

B.

Classification schema

C.

Process modelling

D.

Scope modelling

Question 96

The business analyst (BA) has scheduled an informal review of audit requirements with the compliance officer. The BA wants to demonstrate that the requirements collectively support one another so begins with reviewing the:

Options:

A.

template architectures.

B.

business rules document.

C.

functional specification.

D.

work breakdown structure.

Question 97

A business analyst (BA) is planning the traceability approach for a project. Why should the BA conduct this planning activity?

Options:

A.

To verify that project information is represented at a high level of abstraction

B.

To document the relationship between the different phases of the project for different stakeholders

C.

To ensure the approach provides enough detail to add value without excessive overhead

D.

To associate information with individual or related groups of requirements

Question 98

A business analyst (BA) is preparing the elicitation activity plan for a project. How will understanding the elicitation scope assist the BA with the elicitation activity?

Options:

A.

By ensuring the requirements are validated in time

B.

By demonstrating how to record elicitation results

C.

By outlining the level of stakeholder collaboration

D.

By determining when elicitation is complete

Question 99

A passport agency has recently deployed an online system where customers can apply for, amend, and renew passports. The expected volumes have not been realized and as a result, the agency has not achieved the projected savings. A business analyst (BA) has been asked to investigate the potential causes of this shortfall by understanding the trends, patterns. and volumes at a detailed level. What method of requirements elicitation should the BA start with?

Options:

A.

Data Mining

B.

Mind Mapping

C.

Business Rules Analysis

D.

Interviews

Question 100

A survey on a new system was conducted after the chief executive officer (CEO), who is also the project sponsor, expressed concerns about the uptake of the new system. The CEO is neither sure that the concerns are valid nor whether the survey was conclusive about the success of the project. The business analyst (BA) has been tasked to address the concerns expressed by the CEO and evaluate the results of the survey. What must the BA do to determine that the system is performing as intended and address the concerns of the CEO?

Options:

A.

Evaluate the new system against competitor applications

B.

Confirm the satisfaction of business requirements

C.

Conduct another survey to validate the original results

D.

Validate performance measures and alignment with KPIs

Question 101

The Business Requirements Document (BRD) prepared by the business analyst (BA) was circulated to stakeholders for approval. Some stakeholders objected to the Use Case diagrams and could not understand them. Why would these be included in the document?

Options:

A.

The models were included as a mistake because Use Case diagrams are technical.

B.

The models are part of the technical documents and not part of BRD documents.

C.

The models are used for analysis and refining requirements and design.

D.

The models did not change the value compared to text-based requirements

Question 102

A business analyst (BA) is tasked with designing a method of ensuring that the requirements captured during the elicitation sessions satisfy the needs and expectations of the customer experience, within an initiative. The BA identifies a way that the stakeholder requirements can be structured to ensure realization of the desired customer experience. Which viewpoint describes the approach taken by the BA to structure the requirements?

Options:

A.

User interactions

B.

Business model

C.

Audit and security

D.

Business process model

Question 103

The business analyst (BA) has prepared a requirements package and it is now ready to present to the stakeholders. What is the purpose of presenting the package?

Options:

A.

To document the project's completion

B.

To define the analysis approach

C.

To verity the project's progress

D.

To ensure a shared understanding of the information

Question 104

Before beginning requirements elicitation, a business analyst (BA) has planned the necessary activities, identified needed stakeholders, and documented this in the Business Analysis Plan. Which approach will help the BA ensure that stakeholders are available when required?

Options:

A.

Talk to the stakeholders' managers to ensure the resources will be available

B.

Send meeting invitations well in advance so stakeholders can plan in time

C.

Conduct a review of the plan with the stakeholders and adjust according to the feedback received

D.

Request an introduction letter from the business sponsor highlighting the importance of the initiative

Question 105

A company wants to increase transaction service offerings using its on-line channels. The existing application already has some of the required functionality. A new project has been initiated to implement the additional capabilities but the company management is unsure of the complexity of the project. What exercise must be carried out to determine the changes needed in the new application?

Options:

A.

Perform gap analysis of current and future states

B.

Identify internal solution component dependencies

C.

Evaluate competitor applications

D.

Assess organizational culture

Question 106

A business analyst (BA) was asked to send the requirement details to the project manager (PM), director, vice president (VP), and Chief Information Officer (CIO). The BA shares the complete set of requirements to the PM and director, while creating a summarized version for the VP and CIO. Which aspect of requirement specification and modeling was the BA performing?

Options:

A.

Perform stakeholder analysis

B.

Organize requirements categories

C.

Determine approval authority

D.

Implement appropriate level of abstraction

Question 107

A lead business analyst (BA) analyzed the performance of all BA's within the organization. How should the BA approach communicating the results to stakeholders?

Options:

A.

Compare a solution used at another company

B.

Identify the performance objectives

C.

Select performance measures

D.

Determine the reporting requirements

Question 108

A business analyst (BA) is working on a project to provide a temporary solution that will last for two months. The BA is feeling overwhelmed with the work needed to create the huge number of links to provide full traceability from solution requirements to design for this solution. How can the BA justify omitting all possible links?

Options:

A.

Such traceability is at a lower level of abstraction for this project

B.

The value each link is delivering in this situation is not high

C.

Traceability is a low priority as the BA has other work to complete

D.

It is impossible for anyone to confirm if such links are correct

Question 109

A business analyst (BA) is informing stakeholders about the importance of quality when eliciting requirements. What characteristic describes a quality requirement?

Options:

A.

Simplistic

B.

Consistent

C.

Critical

D.

Functional

Question 110

A business analyst (BA) is currently verifying the accuracy and consistency of information obtained from the stakeholders. The BA needs to identify additional information. What should the BA do next?

Options:

A.

Perform data modelling

B.

Conduct elicitation activities

C.

Meet with the sponsor

D.

Consult with the project manager

Question 111

Performance measures have been collected and analyzed by a business analyst (BA) to evaluate a solution that was launched a few years ago; however, the performance measures do not indicate whether or not the solution is contributing to the desired value. What is the recommended next step?

Options:

A.

Replace the solution as soon as possible

B.

Identify and collect more measurements

C.

Increase the efficiency of the solution

D.

Reduce the business' expectations of value

Question 112

A business analyst (BA) has been asked to develop a plan to complete the associated business analysis activities for a project in which an organization is switching from a manual to an automated process for receiving payments. As the final step in developing the plan, which technique will the BA use?

Options:

A.

Surveys or QUESTION NO:naires for the current initiative

B.

Functional Decomposition for the current initiative

C.

Lessons learned from previous initiatives

D.

Process modelling from previous initiatives

Question 113

Requirements have been prioritized in the product backlog for inclusion in the upcoming release. One of the project team members fears that at least one requirement from the prioritization list is not finalized and still requires further analysis. Which of the following factors describe the affected requirement?

Options:

A.

Benefit

B.

Dependency

C.

Stability

D.

Risk

Question 114

Due to a change in regulation, a solution being implemented has a new compliance requirement that must be evaluated. The requirements change strategy focuses on total cost of change as the primary driver for decisions. The business analyst (BA) compiled the following impact assessment of the proposed change based on the new compliance requirement.

as

What recommendation should the BA make to the stakeholders based on the above information?

Options:

A.

Approve the requirement

B.

Request additional information

C.

Defer the requirement

D.

Reject the requirement

Question 115

A business analyst (BA) has identified the impacts and resolution for a proposed change. Based on the Responsible, Accountable, Consulted, informed (RACI) matrix, who must approve the change before it is implemented?

Options:

A.

Subject matter expert

B.

Business sponsor

C.

Project manager

D.

System architect

Question 116

A business analyst (BA) creates several use case scenarios to specify the requirements for a system. When the beta version of the system is released, there are problems because several important pieces of information are missing. What should the BA have done to avoid this situation?

Options:

A.

Performed decision analysis

B.

Identified assumptions

C.

Prepared activity diagrams

D.

Analyzed completeness

Question 117

Verification of requirements on the projects have highlighted an issue regarding misunderstanding of design models among key stakeholders. A major reason cited for the misunderstanding was the technical jargon and models used in the documentation. What must the business analyst (BA) do to improve the understanding?

Options:

A.

Ensure completeness within the models used

B.

Verify that elements within the models are used consistently

C.

Represent design models using common terminology

D.

Check for compliance with organization standards

Question 118

What is the purpose of managing the solution scope and requirements from a business analyst's objective?

Options:

A.

To complete business analysis activities as quickly as possible

B.

To obtain and maintain requirements approval from the sponsoring client about the solution scope

C.

To obtain and maintain consensus among key stakeholders for the overall solution scope

D.

To complete business analysis activities as accurately as possible

Question 119

The process of defining the business need uses one output. What is it?

Options:

A.

Feasibility study

B.

Solution scope

C.

Business need

D.

Capability gaps

Question 120

The task of prioritizing requirements creates just one output. What is it?

Options:

A.

Validated requirements

B.

Requirements (prioritized)

C.

Requirements rankings

D.

Requirements assessment

Question 121

You are the business analyst for your organization and you're training Marcy, a new business analyst, on how requirements are formed. Which one of the following best describes how requirements are formed?

Options:

A.

Stakeholders' needs, wants, and expectations

B.

Solutions-based approach

C.

Change-driven approach

D.

Risk and reward solution

Question 122

You are a business analyst for your organization. Your current business analysis endeavor includes working with stakeholders located in offices around the world. Because these stakeholders are dispersed, what is likely to increase in this endeavor as opposed to a collocated group of stakeholders?

Options:

A.

Costs

B.

Face-to-face meetings

C.

Communication needs

D.

Risks

Question 123

As a candidate for the CCBA exam, you should be able to recognize the activities associated with each knowledge area. All of the following are the business analysis planning & monitoring activities except for which one?

Options:

A.

Defining and determining business analysis processes

B.

Planning how requirements will be approached, traced, and prioritized

C.

Identifying stakeholders

D.

Job shadowing

Question 124

Bob and Susan are business analysts for their organization. They are examining two materials that could be used in an upcoming project.

They are testing the materials and measuring the results of each test to compare the materials to each other. This process will help Bob and Susan determine which material is best for their upcoming project. What type of process are Bob and Susan completing with these materials?

Options:

A.

Stress test

B.

Feasibility study

C.

Benchmarking

D.

Alternative identification

Question 125

A business analyst has identified four different solutions for a business need. In the light of solution assessment, how many solution assessment iterations should he do?

Options:

A.

The business analyst can do multiple assessments, one for each solution or to compare multiple solutions.

B.

There is no limit, but the business analyst should perform the same type of assessments for each solution to be balanced.

C.

The business analyst can do one assessment per solution.

D.

There should only be one solution assessment - four is too many. Some of the solutions are better than others.

Question 126

What does the decomposition of activities and tasks based on the work breakdown structure create for the business analyst?

Options:

A.

Activity list

B.

Business analysis plan

C.

Network diagram

D.

Project management plan

Question 127

A business analyst (BA) has completed an impact analysis of a proposed change, gained approval for the change, and has updated the requirements. The project sponsor wants to be updated with an overview of the results. How should the BA communicate the results?

Options:

A.

Schedule a requirements workshop

B.

Present the requirements at a high-level

C.

Email the requirements package

D.

Create use case scenarios

Question 128

Complete this statement. are longer-term, ongoing, and qualitative statements of a state or condition that the organization is seeking to establish and maintain.

Options:

A.

Objectives

B.

Goals

C.

Requirements

D.

Operations

Question 129

You are a Business Analyst for your organization, and you're working with Mary. Mary wants to know what you need to complete the process of planning the business analysis approach if you're already the business analyst for your organization. Why is it important to complete the plan business analysis approach?

Options:

A.

This task describes the amount of time needed for the business analysis approach.

B.

This task describes the amount of budget needed for the requirements elicitation.

C.

This task describes how to select an approach for performing business analysis.

D.

This task describes the processes the business analyst will or will not do based on the time and budget available.

Question 130

Which one of the following statements best describes requirements prioritization?

Options:

A.

It is only used with the plan-driven approach to business analysis.

B.

It is only used with the change-driven approach to business analysis.

C.

It determines how requirements will be prioritized based on the most important stakeholders to the least important stakeholders.

D.

It determines how requirements will be prioritized and how those priorities will be used to define the solution scope.

Question 131

Which stakeholder in the solution assessment task will provide information on technical constraints that could limit the solutions that may be implemented?

Options:

A.

Project manager

B.

Suppliers

C.

Sponsor

D.

Operational support

Question 132

You are the business analyst for your organization and you're creating a business analysis communication management plan. In your plan, you want to address the different locales and culture and the communication needs that may affect the business analysis approach. Which one of the following elements should not be included in the cultural analysis of the plan?

Options:

A.

Relationship to task completion

B.

Relationship to authority

C.

Relationship to religion

D.

Relationship to time

Question 133

You are the business analyst for your organization and you are working with Bill on creating a model. Bill is a little confused about all the different things a model can do for the stakeholders. You explain to Bill that a model can do all of the following except for which one?

Options:

A.

Define the risk and reward for the requirements

B.

Categorize and create hierarchies of items

C.

Define boundaries for business domains

D.

Show business logic

Question 134

You are the business analyst for your organization. You are identifying new opportunities to improve upon your existing web services. Management is open to new opportunities as long as the changes do not take more than 60 days to implement. What type of a factor does the 60-day implementation represent?

Options:

A.

Schedule constraint

B.

Business constraint

C.

Technical constraint

D.

Assumption

Question 135

An organization has invested $750,000 into a technology to help secure, automate, and communicate customer ordering. The solution has worked well for the past six months, but a newer technology has been developed that surpasses the abilities of the current solution and solves many defects and issues the company has with the existing solution. Purchasing the newer solution, however, means that the company will have to discard the solution that's only been in place for the past six months. What term can be assigned to the monies already implemented into the existing solution?

Options:

A.

Opportunity cost

B.

Cost of nonconformance

C.

Sunk costs

D.

Cost-benefits

Question 136

A business analyst (BA) is assessing the completeness and coherence of the requirements. The BA has considered a variety of viewpoints and has a collection of views. What has the BA constructed?

Options:

A.

Requirements architecture

B.

Requirements traceability matrix

C.

Business knowledge model

D.

Solution design

Question 137

You are the business analyst for your organization and you've been working with several stakeholders to

gather requirements for approval.

The requirements have been approved with the exception of a conflict on one requirement. What must you and the stakeholders do in regard to this conflict before the business analysis endeavor may continue?

Options:

A.

The requirement with the conflict should be excluded from the approved set of requirements and must be resolved before it can be joined to the approved set of requirements.

B.

The conflict must be documented as a risk.

C.

The conflict must be resolved before the set of requirements may be approved.

D.

The conflict must be documented in an issues log, assigned to an issue owner, and then the endeavor may continue.

Question 138

As a candidate for CCBA, you should be able to recognize the activities associated with each knowledge area. Which of the following is an elicitation process that is a part of job observation?

Options:

A.

Identifying stakeholders

B.

Job shadowing

C.

Defining and determining business analysis processes

D.

Planning how requirements will be approached, traced, and prioritized

Question 139

Henry is meeting with Janet, the business analyst of the organization. They are discussing an opportunity to create a new service their company can provide, though the startup of the service would take time and an investment. Henry wants Janet to explore the possibility of this new venture. What activity is Henry asking Janet to complete?

Options:

A.

Brainstorm the business need.

B.

Create a data diagram for the service.

C.

Define the business need.

D.

Elicit the requirements of the proposal.

Question 140

Beth is a business analyst for her organization and she's completing the tasks in the requirements management and communication knowledge area. As a result of these tasks, she'll create several things for her organization. Which one of the following, however, is not one of the outputs of the requirements management and communication tasks?

Options:

A.

Traced requirements

B.

Requirement management plan

C.

Requirement package

D.

Approved requirements

Question 141

The project plan called for deliverables to be handed over at the end of the project. Although the client's business team was satisfied, the client's technical team was extremely resistant to this approach. What could the business analyst (BA) do to mitigate the technical team’s resistance?

Options:

A.

Escalate to project sponsor

B.

Meet with technical team

C.

Reassess the project objectives

D.

Email the business team

Question 142

You have been assigned as the Project Manager for a new project that involves the development of a new interface for your existing time management system. You would like to plan the communications that need to be made during the project lifecycle. Which of the following would be a critical tool/technique to help in your communications planning?

Options:

A.

RAM Chart

B.

Affinity Diagram

C.

Stakeholder Analysis

D.

Text-Oriented Chart

Question 143

Complete this sentence in regard to the level of abstraction. Requirements need to say needs to be done, not to do it.

Options:

A.

What, when

B.

Requirements, who needs

C.

What, how

D.

Requirements, how much

Question 144

You are the business analyst for your organization and you're creating a data flow diagram to show how

information is input, processed, stored, and output from a system. Which element of a data flow diagram represents a process that transforms data by combining it with other data?

Options:

A.

Data flow

B.

External entities

C.

Data process

D.

Concatenation

Question 145

A business analyst (BA) has been hired to validate a project's requirements. A series of meetings with stakeholders have been scheduled to walk through each requirement as it relates to the desired future state of the organization. The desired outcome of this exercise is to ensure that all requirements:

Options:

A.

link to user stories.

B.

are articulated correctly.

C.

are funded by the business sponsors.

D.

support the delivery of needed value.

Question 146

You are the business analyst for your organization and you're training Marcy, a new business analyst, on how requirements are defined. Which one of the following best describes how requirements are defined?

Options:

A.

Stakeholders' needs, wants, and expectations

B.

Risk and reward solution

C.

Change-driven approach

D.

Solutions-based approach

Question 147

Ralph is a business analyst for his organization and he's using the plan-driven approach for business analysis. Ralph has captured the requirements of the project, but what must happen before he can begin capturing and defining the requirements at a deeper level of detail?

Options:

A.

The initial requirements must be tested for time, cost, quality, and risk.

B.

The initial requirements must undergo a feasibility study.

C.

The initial requirements must be formally approved by the stakeholders.

D.

The initial requirements must pass through the Delphi Technique.

Question 148

The business need is considered to be the most critical step in the business analysis effort. Why is the definition of the business need considered the most critical step?

Options:

A.

The business need defines the problem the business analyst is finding a solution for.

B.

The business need defines the solution for the business problem.

C.

The business need takes the longest time and costs most of the business analysis efforts.

D.

The definition of the business need determines future solutions, stakeholders, and approaches.

Question 149

Which of the following is used to define and document the business analysis approach?

Options:

A.

Structured walkthrough

B.

Progressive elaboration

C.

Process modeling

D.

Decision analysis

Question 150

Mark is the business analyst for his organization. He is working with the solution development team and he believes that the team does not want to implement a certain portion of the requirements. The team is expressing the difficulty of the requirements and how it will be extremely challenging to complete. When Mark asks about a similar project that the team completed, they insist that this is a different type of requirements though Mark believes that it is not. What is the solution development team appearing to do to the requirements?

Options:

A.

Get the requirements removed from the project scope.

B.

Change the prioritization of the requirements based on overstated complexity of the project work.

C.

Change the prioritization of the requirements based on the past project.

D.

Have the business analyst report the difficulty of the project work to the project customer.

Question 151

What tool is best described as a spreadsheet to use when there's a relatively low amount of requirements that need to be traced?

Options:

A.

Roles and responsibilities chart

B.

Quantitative matrix

C.

Coverage matrix

D.

RACI Chart

Question 152

Which basis for prioritization allows the project team to work initially with lower-risk requirements first?

Options:

A.

Quantitative ranking

B.

Positive risk ranking

C.

Relationship to other requirements

D.

Implementation difficulty

Question 153

Robert is the business analyst for his organization and is preparing to host a workshop for twenty stakeholders. The goal of this workshop is to comprehensively identify the requirements for new software that will be created for Robert's organization. What must first be established in the workshop to ensure that the elicitation process moves smoothly?

Options:

A.

An understanding of the ground rules of the workshop

B.

An understanding of who are the most important stakeholders

C.

An understanding of the business opportunity

D.

An understanding of the requirements elicitation processes

Question 154

Which approach is best to take when a business analyst is assessing the solution options for a business need when there are relatively few criteria involved?

Options:

A.

Focus on the life cycle costs of the solutions.

B.

Focus on the commonalities of the solutions.

C.

Focus on the differences of the solutions.

D.

Focus on the implementation cost of the solutions.

Question 155

A business analyst is meeting with the customer of the project. The customer tells the business analyst that she can only allow the budget of $575,000 for the project. This budget is best described as what type of constraint?

Options:

A.

Technical constraint

B.

Verified constraint

C.

Financial constraint

D.

Business constraint

Question 156

When a business analyst assists in the planning of the solution implementation, she must always consider the constraints for implementation. Which one of the following cannot be considered as an implementation constraint?

Options:

A.

Weather

B.

Freeze periods

C.

Company policies

D.

Business cycle timings