Weekend Biggest Discount Flat 70% Offer - Ends in 0d 00h 00m 00s - Coupon code: 70diswrap

Oracle 1z0-1066-24 Dumps

Page: 1 / 14
Total 138 questions

Oracle Planning and Collaboration Cloud 2024 Implementation Professional Questions and Answers

Question 1

Planner 1 works in Europe and needs to see three measures in kilograms (the default UOM). Planner 2 is US-based and needs to see those same three measures in pounds. Both planners need to use five tables in their plan analyses on a regular basis. At the moment, all five tables are displayed in kilograms.

Which two options would most efficiently address this requirement?

Options:

A.

Create duplicates of the three measures in Manage Planning Measures and change each new measure's UOM from kilograms to pounds, then duplicate the five tables but use the new measures.

B.

There is no efficient solution to this requirement.

C.

Open each table and format measures to duplicate the three measures and then format the duplicated measures to be displayed in pounds.

D.

Planner 2 opens a table, formats each measure to be displayed in pounds. When Planner 1 opens the same table, they reformat back to be displayed in kilograms.

E.

Duplicate all five tables, then format the three measures in the copied tables to be displayed in pounds.

Question 2

Which list of parameters is available for selection when you run the Start Backlog Planning scheduled process?

Options:

A.

Priority Rule. Organization. Demand Class, Item. Customer

B.

Demand Priority Rule. Organization. Demand Class. Item. Customer

C.

Backlog Priority Rule. Organization. Category. Item. Customer

D.

Demand Priority Rule. Organization. Category. Item, Customer

Question 3

As a new planner, you want to test simulation set functionality. You have created a simulation set named 'Test Simulation Set.' In this simulation set, you have already added Item 98573. You would like to change the item specification 'Fixed Order Quantity' to 10 within this simulation set.

Which sequence will allow you to accomplish this task?

Options:

A.

Select and open 'Test Simulation Set' > Search and select Item 98573 > Highlight item > Select 'Action' > Select 'Edit' > Find Fixed Order Quantity specification> under the 'Action' column select 'set value as' > under the 'Value' column enter 10

B.

Select and open 'Test Simulation Set' > Search and select Item 98573 > Highlight item > Select 'View' > Select 'Columns' > Check box next to Fixed Order Quantity specification> the 'Fixed Order Quantity' will now show on the Item 98573 line > Highlight line for Item 98573 and scroll right until you find 'Fixed Order Quantity' > Change value to 10

C.

Select and open 'Test Simulation Set' > Search and select Item 98573 > Highlight item > Select 'Action' > Select 'Edit' > Find Fixed Order Quantity specification> under the 'Action' column select 'reset to original' > under the 'Value' column enter 10

D.

Select and open 'Test Simulation Set' > Search and select Item 98573 > Highlight line for Item 98573 and scroll right until you find 'Fixed Order Quantity' > Change value to 10

Question 4

You are a demand planner and you want to generate forecast for all laptop and desktop products in the US business unit. You are using standard enterprise and product hierarchy. You have created a demand plan and now you must define plan scope.

Identify three valid steps. (Choose three.)

Options:

A.

For plan parameters, select forecasting calendar as Gregorian and time level as week.

B.

For forecasting items, select hierarchy as product, level as category level 1, and laptop and desktop categories as level members.

C.

For plan parameters, select forecasting calendar as Gregorian and time level as month.

D.

For plan organizations, select hierarchy as enterprise, level as country, and US as level member.

E.

For forecasting items, select hierarchy as product, level as product, and all laptop and desktop products as level members.

F.

For plan organizations, select hierarchy as enterprise, level as business unit, and US and level member.

Question 5

A customer would like to account for the production loss in the supply planning process using the item shrinkage rate planning specification.

Which statement reflects the system behavior to meet this requirement?

Options:

A.

Planning process reduces the demand based on shrinkage factor and keeps the supply quantity as is.

B.

Planning calculation does not support shrinkage functionality.

C.

Planning calculates no additional demand but creates the additional required supply based on shrinkage factor.

D.

Planning calculation creates scrap demand to compensate for loss and maintains supply.

Question 6

You are running a demand plan for the first time and you want to generate forecast for the next six months. Which two demand plans run options should be selected? (Choose two.)

Options:

A.

Under data refresh options, select "Refresh with selected current data" and chose sales orders.

B.

Under data refresh options, select "Refresh with current data."

C.

Select sales orders as forecast profile.

D.

Select forecast shipments as forecast profiles.

E.

Under data refresh options, select "Refresh with demand planning data."

Question 7

Your client uses product categories and global sourcing rules for supply planning. However, their newest product doesn't follow these rules. For a specific item in the category, it needs to be sourced from a different supplier globally.

How should they set this up for the easiest maintenance, going forward?

Options:

A.

Create a new global sourcing rule for the item; remove the category level assignments and create new item level assignments for all items in the category pointing each to the correct global sourcing rule.

B.

Create a new local sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.

C.

Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; leave the category as is for the remainder of the products.

D.

Create a new global sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.

E.

Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; alter the category to be category-organization for the remainder of the products.

Question 8

Segmentation was last run many months ago and the replenishment planner is concerned about losing track of items whose policies get changed due to the upcoming resegmentation. There are also a lot of manually assigned segments that must be preserved. Which two approaches for Execute Segmentation should you use in this planner?

Options:

A.

Save the last segmentation result should be selected.

B.

No other setting is needed.

C.

Auto-approve segmentation changes should not be selected.

D.

Retain segment overrides should be selected.

Question 9

In order for Supply and Demand Plans to run successfully, which three Configure Planning Analytic tasks must be completed? (Choose three.)

Options:

A.

Set up Levels and Attributes

B.

Set up Measure Catalogs

C.

Run the Configure Dimension Catalog process

D.

Set up Default Catalogs

E.

Set up Dimension Catalogs

F.

Set up Hierarchy Attributes

Question 10

Which feature is NOT available for Sales and Operations Planning plans?

Options:

A.

View Segmentation Summary

B.

Configure Exceptions

C.

Collect Planning Data

D.

Load Planning Data from Files

Question 11

Which four actions does Demand Management enable you to do? (Choose four.)

Options:

A.

Run an unlimited number of forecast simulations to see impacts of changes in the price, running a marketing campaign, shift in weather, demand upside request, and so on.

B.

Simulate changes to the dependent options forecast for build to stock items.

C.

Perform side-by-side analysis on a multiple number of scenarios, and see the impact on operational and financial objectives.

D.

Simulate how changes to forecasting models and parameters have an immediate impact on the statistical forecast.

E.

Simulate the impact of introducing new products in particular geographic areas.

Question 12

Which three steps are required so that a supply plan can use different service-level percentages for different groupings of items when calculating safety stock?

Options:

A.

Create a supply planning policy assignment set.

B.

Create segment groups.

C.

Assign the percentage on the Safety Stock tab of plan options.

D.

Execute segmentation.

E.

Create a safety stock policy assignment set.

Question 13

The marketing department of a company needs to analyze the forecast based on type of demand (large retailer versus specialty store) and item cost (low versus high).

After creating a segment group with demand class and product for segment granularity, what additional sequence of actions must they also perform to satisfy marketing?

Options:

A.

Define four segments based on demand type and item cost, define each segment's criteria, execute segmentation, and use the selector tool to create a new table or graph.

B.

Define four segmentation based on demand type and item cost, define each segment's criteria, execute segmentation, configure planning analytics to update the dimension catalog, and use the selector tool to create a new table or graph.

C.

Define four segments based on demand type and item cost, execute segmentation, and use the selector tool to create a new table or graph.

D.

Define two segments based on demand type and item cost, execute segmentation, and use the selector tool to create a new table or graph.

Question 14

Which statement is NOT true about item attributes?

Options:

A.

The "forecast control" item attribute must be assigned if configure-to-order (CTO) items are being planned.

B.

Many item attributes can be overridden as part of a simulation set that gets applied to a plan.

C.

Some item attributes can be overridden directly in the Items table for simulation purposes.

D.

Supply plans ignore items with the "planning method" attribute set to MPP.

Question 15

What happens when a demand planner approves a demand plan and then adjusts shipment history and runs demand plan again?

Options:

A.

The approve action takes the data from the two final forecast measures and copies to Approved Final Shipments Forecast and Approved Final Bookings Forecast, respectively. After a forecast is approved, the approved values remain unchanged until the forecast is approved again.

B.

The approve action makes the Adjusted Shipments Forecast and Adjusted Bookings Forecast measures "not editable." After a forecast is approved, the Final Shipments Forecast and Final Bookings Forecast measures remain unchanged until the forecast is approved again.

C.

The approve action makes the Adjusted Shipments Forecast and Adjusted Bookings Forecast measures "not editable." But any subsequent demand plan run can change Final Shipments Forecast and Final Bookings Forecast values.

D.

The approve action takes the data from the two final forecast measures and copies to Approved Final Shipments Forecast and Approved Final Bookings Forecast, respectively. Any subsequent demand plan run can change final shipments or bookings forecast values that will automatically update the approved forecast measures.

Question 16

You are in Implementation project and your customer is a global company with a complex supply chain network. Planners work across different geographies and different line of products. Each planner works with their own set of data and analysis and dashboards.

How do you configure the application so each planner can have their own custom dashboard view-able only to themselves?

Options:

A.

Create public page layouts that are tailored to specific business needs.

B.

You cannot create custom dashboards by user.

C.

Enable layout security checkbox in the Administer Planning Security.

D.

Create private page layouts that are tailored to specific business needs.

Question 17

As part of the agreement with one of our suppliers, you are supposed to order product by the 100s. But if the required supply is only 149, how many should be planned to purchase, and which item attribute will cause this to happen?

Options:

A.

Planned Order for 200. Maximum Order Quantity enabled

B.

Planned Order for 100. with Minimum Order Quantity enabled

C.

Planned Order for 150, with Rounding enabled

D.

Planned Order for 200. with Fixed Lot Size Multiplier enabled

E.

Planned Order for 149, with Fixed Order Quantity enabled

Question 18

Which statement applies only to the planning of back-to-back items and not standard items?

Options:

A.

Planning analyzes supply shortages and capacity overloads using any of the standard planning tools.

B.

Must use Global Order Promising and Supply Chain Orchestration to release and create new supplies

C.

Must have added sourcing rules to the Global Order Promising assignment set.

D.

Planning pegs reserved supplies to sales orders.

E.

Planning collects bookings or shipments history to forecast items.

Question 19

What does the Advanced Plan Option check box "Consider currency conversion rates to plan revenue" do?

Options:

A.

It enables backlog plans to prioritize constrained products based on higher price and to consider exchange rates.

B.

For supply and sales and operations plans, it enables prioritization of constrained products based on higher price and to consider exchange rates.

C.

It enables supply plans with planning method constrained to prioritize constrained products based on higher price and to consider exchange rates.

D.

It enables sales and operations plans with constrained products to prioritize products based on higher price and to consider exchange rates.

Question 20

Which four types of items are eligible to be included as Supply Planned Items in the Supply Plan? (Choose four.)

Options:

A.

Demand plan items

B.

WIP components

C.

All planned items

D.

Purchased Items

E.

Supply plan items

F.

All sales orders

Question 21

Which two statements regarding the Decomposition scheduled process are incorrect? (Choose two.)

Options:

A.

It does not recognize forecast exceptions.

B.

It reads published planning data from interface tables.

C.

It received supplier commits.

D.

It creates or updates an order forecast, used by Supply Chain Collaboration to publish to suppliers.

Question 22

Which is not a potential source for a planning attribute?

Options:

A.

A standard attribute for purchase orders

B.

An extensible flexfield for sales orders

C.

A key flexfield for items

D.

A descriptive flexfield for purchase requisitions or work orders

Question 23

How can you deliver a forecast for drop shipments?

Options:

A.

It cannot be done at this time.

B.

Generate manually using Planning Analytics

C.

Excel upload using File Based Data Import Process

D.

Create based on the supplier performance for drop shipment collection

E.

Create based on the drop shipment or booking history; the ship from will be the drop ship validation organization

Question 24

Which statement order is NOT true about how to effectively address demand at risk?

Options:

A.

Recommendations appear in one of these five categories (or tabs): Expedite Buy Orders. Expedite Planned Orders. Expedite Transfer Orders. Add Resource Availability, and Add Supplier Capacity.

B.

When you accept an expedite recommendation, the order is firmed by using the expedite date as the firm date. So when the plan is run after accepting the recommendation, the planning process assumes the supply is available on the firm date.

C.

Be aware that recommendations to expedite buy orders not only include purchase orders and requisitions, but also planned buy orders.

D.

To maximize effort, use the Recommendations Summary graph and aim for a low number of recommendations with the associated at-risk demand value substantial enough to make a difference in demand fulfillment percentage.

Question 25

Planners are complaining about getting too many exception messages, some of which have minima value for evaluating plan health.

Which three solutions could reduce message clutter? (Choose three.)

Options:

A.

Go to Configure Exceptions, and specify a threshold for various messages.

B.

Go to Configure Exception Sets, and for the currently used exception set. specify a threshold for various messages.

C.

Go to Configure Exception Sets, duplicate the currently used exception set, remove the undesired messages from the duplicate set. then assign the duplicate set to all plans.

D.

Go to Configure Exception Sets, create a new set with only the messages the planners care about, and then, set all supply plans to use this new exception set.

Question 26

Which three steps are required so that a supply plan can use different service-level percentages for different groupings of items when calculating safety stock?

Options:

A.

Create a supply planning policy assignment set.

B.

Create segment groups.

C.

Assign the percentage on the Safety Stock tab of plan options.

D.

Execute segmentation.

E.

Create a safety stock policy assignment set.

Question 27

You have created several infotiles based on the client requirements. You now want to group them together for display. How do you accomplish this?

Options:

A.

First build them into an info set in Manage Infosets. Then open the info set on the plan by going to Open (choose area) > Choose info set.

B.

No need to group them. Open them directly on the plan going to Open (choose area) > Choose Infotile.

C.

First build them into a tile set in Manage Table, Graphs, and Analysis Sets. Then open the tile set on the plan by going to Open (choose area) > Choose tile set.

D.

First build them into a planning group in Manage Planning Groups. Then open the planning group on the plan by going to Open (choose area) > Choose planning group.

E.

First build them into a planning measure in Manage Planning Measures. Then open the planning measure on the plan by going to Open (choose area) > Choose planning measure.

Question 28

You want to understand what your inventory turns are for your organization. Where can you see this information in Planning Central?

Options:

A.

Manage Planning Analytics

B.

Manage Planning Measures

C.

View Planning Analytics

D.

Manage Metrics

E.

Plan Summary

Question 29

Your clients want to simulate how canceling demand may impact a plan. Which two steps must be done to simulate this change? (Choose two.)

Options:

A.

Run plan with 'Do not refresh with current data'

B.

Manage Plans > Edit Plan Options > Add simulation set

C.

Open plan > View Supplies and Demands > Firm the demand and set firm quantity to 0 > Save changes

D.

Open plan > View Supplies and Demands > Remove the sales order from the plan and firm demand > Save changes

E.

Run plan with 'Refresh with current data'

Question 30

You are setting up the plan page layout for your customer.

In which of these requirements would you use an Infotile?

Options:

A.

Showing customer demand trend over a specific time period

B.

Showing inventory values by product category

C.

Showing a breakdown of exception in a pie chart

D.

Showing on-hand value compared to targets

E.

Showing inventory value across time

Question 31

Which four options can be set as a Demand Schedule in Supply Planning plan options? (Choose four.)

Options:

A.

Final Bookings Forecast

B.

Approved Final Shipments Forecast

C.

Final Transfer Order Forecast

D.

Final Shipments Forecast

E.

Approved Final Bookings Forecast

F.

Approved Final Transfer Order Forecast

Question 32

Demand is high leading up to the Christmas holiday every year between Dec 20 and Dec 24 and not on Christmas day (Dec 25). Your customer has two demand plans. Describe the steps to model Christmas causal factor in both demand plans.

Options:

A.

Open a demand plan and add a new customer specific Christmas causal factor. Create a table displaying the causal factor measure and relevant time period and modify as required. Causal factor changes in this demand plan will reflect in the 2nd demand plan also.

B.

Open a demand plan and add a new customer specific Christmas causal factor. Create a table displaying the causal factor measure and relevant time period and modify as required. Causal factor changes are plan specific, so repeat the steps in the 2nd demand plan.

C.

Use FBDI to create a new customer specific Christmas causal factor. Place value of 1 from Dec 20 to Dec 34. Causal factor upload to one demand plan will reflect in the 2nd demand plan also.

D.

Use FBDI to create a new customer specific Christmas causal factor. Place value of 1 from Dec 20 to Dec 24. Causal factor changes are plan specific, so repeat the steps in the 2nd demand plan.

E.

Open a demand plan and edit Christmas casual factor measure. Place value of one from Dec 20 to Dec 24 and zero for non-impacted days including Dec 25. Causal factor changes in this demand plan will reflect in the 2nd demand plan also.

F.

Open a demand plan and edit Christmas casual factor measure. Place value of one from Dec 20 to Dec 24 and zero for non-impacted days including Dec 25. Causal factor changes are plan specific, so repeat the steps in the 2nd demand plan.

Question 33

Your client wants to create a supply plan that only considers sales order and disregards forecast demand within a specific demand horizon. What must you do to accomplish this?

Options:

A.

Manage Plans > Search and select supply plan > Supply tab > Organizations and Schedules tab > Remove all demand schedules

B.

Manage Plans > Search and select demand plan > Demand tab > General tab > Select 'Do no spread forecast'

C.

Manage Plans > Search and select demand plan > Demand tab > General tab > Check Demand Time Fence Control

D.

Manage Plans > Search and select supply plan > Supply tab > General tab > Advanced Options > Check 'Create time fence'

E.

Manage Plans > Search and select supply plan > Supply tab > General tab > Check Demand Time Fence Control

Question 34

You have executed Planning Data Collection and want to confirm that data has successfully been collected. Identify the three data combinations that can be viewed using the Maintain Supply Network Model Page. (Choose three.)

Options:

A.

Customer Location and Carriers

B.

Safety Stock and Subinventories

C.

Sales Channel and Demand Class

D.

Calendar and Master Organization

E.

Supplier Site and Service Level

Question 35

During Implementation of Planning Central, your client has discovered that no Material Planners have been defined in Manage Material Planners in Planning Central.

In this situation, which three statements are true? (Choose three.)

Options:

A.

Your client has not been assigned the Material Planner role.

B.

You have not been assigned the Materials Planner role.

C.

The Planner field will be null for all items.

D.

Collect Planning Data has not been run for Material Planners.

E.

Planned Orders will not release successfully.

Question 36

Which calendar is supported in the supply planning process but does not support bucketing by week?

Options:

A.

Lunisolar

B.

Fiscal

C.

Roman

D.

Gregorian

E.

Julian

Question 37

Which attribute or attributes can you maintain via the Maintain Supply Network Model task?

Options:

A.

For Carriers: Enabled

B.

For Customers. Suppliers, and Organizations: Time Zone

C.

For Organizations: Supply Past Due. Customer, and ABC Assignment Group

D.

For Interlocation Shipping Networks: Carrier. Mode of Transport, and Service Level

Question 38

The supply plan is not very reliable. Components often arrive early or late. A team of planners, buyers, marketers, product engineers, and materials managers are tasked to investigate. They list several possibilities that could explain their plan’s poor results.

If you were a member of the investigation team, which step would you recommend to help troubleshoot this serious issue?

Options:

A.

For inaccurate quantity-on-hand issues, use the Planning Advisor to identify inventory accuracy improvement opportunities.

B.

For incomplete or unreliable demand schedules, use the Planning Advisor to identify forecast accuracy issues.

C.

For incorrect or incomplete bills of materials, use the Planning Advisor to identify bill of material anomalies.

D.

For incorrect or unreliable supplier lead times, use the Planning Advisor to determine lead time accuracy.

Question 39

You want to check how many items have excess inventory. Which three choices will get you there? (Choose three.)

Options:

A.

Open Table, Graph, or Tile Set > Table: Item Exceptions Summary > Filter by Items with Excess Inventory

B.

Manage Plans > Edit Plan Options > Select Supply tab > Navigate to Item area > Filter by Items with Excess Inventory

C.

Open Table, Graph, or Tile Set > Table: Exceptions > Expand Supply Planning Exceptions > Select Items with Excess Inventory

D.

Open Table, Graph, or Tile Set > Table: Items with Exceptions > Filter by Items with Excess Inventory

E.

Open Table, Graph, Tile Set > Table: Items > Select any Item > Drill to: Item Exceptions > Expand Supply Planning Exceptions > Select Items with Excess Inventory > Refresh the search results

Question 40

Your current shipments forecast for Jan 2018 is 1000 and the demand planner determines that the forecast should be 1500. Describe how the demand planner can override shipments forecast. Also, what happens to the final shipments forecast measure when the demand plan is run again and the shipments forecast value changes to 1250?

Options:

A.

Open a table with the Adjusted Shipments Forecast measure and enter 1500. The Final Shipments Forecast measure will change to 1500 and the value will persist during subsequent demand plan runs.

B.

Open a table with the Shipments Forecast measure and override it to 1500. The Final Shipments Forecast measure will change to 1500 and the value will persist during subsequent demand plan runs.

C.

Open a table with the Shipments Forecast measure and override it to 1500. The Final Shipments Forecast measure will change to 1500. During the subsequent demand plan run, the Final Shipments Forecast value will change to 1250.

D.

Open a table with the Adjusted Shipments Forecast measure and enter 1500. The Final Shipments Forecast measure will change to 1500. During the subsequent demand plan run, the Final Shipments Forecast value will change to 1250.

Page: 1 / 14
Total 138 questions