PECB ISO-22301-Lead-Implementer Dumps

ISO 22301 Lead Implementer Certification Exam Questions and Answers

Question 1

Scenario:

Prebank is a multinational financial institution. Its services include banking and investing through banking centers, ATMs, and mobile banking platforms. With millions of clients, Prebank's database systems record vast amounts of data and transactions daily. Its main activities depend on the ability of its employees to access clients' data through its database system at any time.

Recently, Prebank's database system stopped working unexpectedly. Soon after, it was discovered that this disruption was caused by the maintenance work on the road outside the company's office building. During the road repair, the workers had unintentionally damaged a water pipe that leaked into Prebank's basement. This leakage affected the company's electrical infrastructure, resulting in a loss of power, which shut down equipment and computers in the server room. Consequently, employees were unable to access Prebank's database system.

After this incident, the employees immediately notified Prebank's IT team. Subsequently, the IT team informed both the maintenance company responsible for the roadworks and the insurance company. The company responsible for maintenance told Prebank's IT team that the maintenance team was not available for the day. Since Prebank did not have a plan for responding to similar disruptions, they had to stop working and go home. Thankfully, the maintenance team arrived at the scene on the next day and made all the necessary repairs, allowing Prebank to resume all its operations.

Following these events, Prebank decided to change its strategy and procedures to prioritize business continuity planning within the company. Its main focus was to address the root cause of disruptions to improve business continuity. As such, the top management decided to implement a Business Continuity Management System (BCMS) based on ISO 22301.

After setting the company's business continuity objectives, the company established a project team, including a project manager and four additional team members. The BCM team was responsible for managing the BCMS implementation process, whereas the top management was responsible for the effectiveness of the BCMS. Through analyzing potential risk scenarios, the team defined Prebank's business continuity strategy as well as the resources for supporting business continuity within the company. This enabled the team to predict the impact of disruptions caused by various incidents,such as power outages. Following these actions, the company established a business continuity plan to manage disruptions effectively without impacting the workflow.

The effective implementation of the BCMS helped Prebank not only minimize losses and ensure continuity in its services but also absorb and adapt to a changing environment.

According to ISO 22301, which of the following features pertains to a disruption?

Options:

A.

Incident that causes a negative deviation from the expected delivery of products and services.

B.

Unstable condition involving an abrupt or significant change that requires urgent attention and action.

C.

Situation where human, material, economic, or environmental losses have occurred.

Question 2

An organization is focused on eliminating the root causes of nonconformities. Which action did they take?

Options:

A.

Correction

B.

Corrective

C.

Detective

Question 3

Scenario:

Headquartered in Sri Lanka, Operons Inc. is a freight forwarding company that adopted a BCMS aligned with ISO 22301. Prior to the certification audit, Operons Inc. measured gaps between their BCMS and the standard's requirements to ensure compliance. The certification body was contracted to conduct the audit, and a biased auditor from a previous ISO 9001 audit was replaced upon request. During the audit, two minor nonconformities were identified, and the audit team issued a recommendation for certification.

Based on Scenario 8, Operons Inc. contracted the same certification body that had conducted the ISO 9001 audit and requested more information about the competence and skills of the audit team. Is this acceptable?

Options:

A.

No, the same certification body cannot be contracted to audit two management systems in the same organization.

B.

No, the auditee cannot ask about the competence and skills of the audit team; that is the responsibility of the certification body.

C.

Yes, competence and skills of the audit team are among the main criteria in selecting a certification body.

Question 4

Why is it important for organizations operating in multiple locations to be aware of compliance requirements?

Options:

A.

To centralize operations

B.

To ensure uniformity in compliance

C.

To bypass legal responsibility

Question 5

Scenario:

Headquartered in Sri Lanka, Operons Inc. is a freight forwarding company that adopted a BCMS aligned with ISO 22301. Prior to the certification audit, Operons Inc. measured gaps between their BCMS and the standard's requirements to ensure compliance. The certification body was contracted to conduct the audit, and a biased auditor from a previous ISO 9001 audit was replaced upon request. During the audit, two minor nonconformities were identified, and the audit team issued a recommendation for certification.

In Scenario 8, the certification body accepts Operons Inc.’s rejection of the auditor and appoints another one. Is this acceptable?

Options:

A.

No, the auditor can be rejected only if a conflict of interest situation is present.

B.

Yes, previously displayed unprofessional conduct is a valid reason to replace an auditor.

C.

Yes, the auditor has previously audited the company against ISO 9001, which is a valid reason for replacing the auditor.

Question 6

Scenario:

Prebank is a multinational financial institution. Its services include banking and investing through banking centers, ATMs, and mobile banking platforms. With millions of clients, Prebank's database systems record vast amounts of data and transactions daily. Its main activities depend on the ability of its employees to access clients' data through its database system at any time.

Recently, Prebank's database system stopped working unexpectedly. Soon after, it was discovered that this disruption was caused by the maintenance work on the road outside the company's office building. During the road repair, the workers had unintentionally damaged a water pipe that leaked into Prebank's basement. This leakage affected the company's electrical infrastructure, resulting in a loss of power, which shut down equipment and computers in the server room. Consequently, employees were unable to access Prebank's database system.

After this incident, the employees immediately notified Prebank's IT team. Subsequently, the IT team informed both the maintenance company responsible for the roadworks and the insurance company. The company responsible for maintenance told Prebank's IT team that the maintenance team was not available for the day. Since Prebank did not have a plan for responding to similar disruptions, they had to stop working and go home. Thankfully, the maintenance team arrived at the scene on the next day and made all the necessary repairs, allowing Prebank to resume all its operations.

Following these events, Prebank decided to change its strategy and procedures to prioritize business continuity planning within the company. Its main focus was to address the root cause of disruptions to improve business continuity. As such, the top management decided to implement a Business Continuity Management System (BCMS) based on ISO 22301.

After setting the company's business continuity objectives, the company established a project team, including a project manager and four additional team members. The BCM team was responsible for managing the BCMS implementation process, whereas the top management was responsible for the effectiveness of the BCMS. Through analyzing potential risk scenarios, the team defined Prebank's business continuity strategy as well as the resources for supporting business continuity within the company. This enabled the team to predict the impact of disruptions caused by various incidents, such as power outages. Following these actions, the company established a business continuity plan to manage disruptions effectively without impacting the workflow.

The effective implementation of the BCMS helped Prebank not only minimize losses and ensure continuity in its services but also absorb and adapt to a changing environment.

What type of hazard caused Prebank's database system to stop working?

Options:

A.

Environmental hazard

B.

Human-caused hazard

C.

Accidents and technological hazard

Question 7

Which of the following statements regarding the BCMS implementation project and operations is correct?

Options:

A.

Projects are focused on sustaining the organization, whereas operations focus on retaining or adding value or capability.

B.

Projects are ongoing, whereas operations are temporary.

C.

Projects are temporary, whereas operations are ongoing.

Question 8

Scenario:

NexTech Innovations, a dynamic tech startup located in Seoul, South Korea, is renowned for its advancements in artificial intelligence and robotics. Serving a global clientele, NexTech encountered a sudden obstacle when a critical supplier abruptly ceased operations, disrupting their supply chain and threatening their ability to deliver products on schedule. Recognizing the need for resilience, NexTech initiated the implementation of a robust business continuity management system (BCMS) based on ISO 22301.

NexTech's top management established a project team of five members and appointed Rebecca, the lead operations manager, as the project manager. The BCM team was tasked with the effective implementation of the BCMS in line with ISO 22301 requirements. Rebecca worked with the top management to analyze the internal context of the company to define the BCMS scope, focusing on assessing and determining who is responsible for coordinating and managing activities at different organizational levels.

The project team divided the implementation project into smaller tasks, identifying the personnel, equipment, and materials needed for each. Rebecca personally handled resource allocation to implement and support the BCMS. Meanwhile, the top management ensured active involvement and commitment at all levels of the organization to enhance the BCMS's effectiveness.

Rebecca and the team drafted and published the business continuity policy on the company’s website. However, some employees found the technical jargon challenging to understand, so comprehensive training sessions were held to address this issue. These measures strengthened NexTech’s resilience and enhanced client trust by proactively addressing potential disruptions.

Rebecca and the BCM team drafted, published, and communicated the business continuity policy on the organization's website. Was this course of action in accordance with best practices?

Options:

A.

Yes, it is the project team's responsibility to draft and publish the policy the moment it is ready for communication.

B.

No, the policy should have been communicated officially to the relevant parties rather than publishing it on the website.

C.

No, the project team must obtain formal approval for the policy before publication.

Question 9

Based on ISO 22301, who is responsible for assigning the roles and responsibilities related to the BCMS implementation within the organization?

Options:

A.

Business continuity management team

B.

Business continuity manager

C.

Top management

Question 10

An organization ensures the continuity of its network by documenting and maintaining a business continuity plan for backup connectivity of all its critical operations. However, the new business continuity manager concluded that this plan is useless as it has not been communicated to all relevant interested parties. What does this situation indicate?

Options:

A.

The business continuity manager has identified the root cause of the nonconformity.

B.

The business continuity manager evaluated the impact of the nonconformity.

C.

The business continuity manager initiated the corrective action process.

Question 11

Scenario:

NexTech Innovations, a dynamic tech startup located in Seoul, South Korea, is renowned for its advancements in artificial intelligence and robotics. Serving a global clientele, NexTech encountered a sudden obstacle when a critical supplier abruptly ceased operations, disrupting their supply chain and threatening their ability to deliver products on schedule. Recognizing the need for resilience, NexTech initiated the implementation of a robust business continuity management system (BCMS) based on ISO 22301.

NexTech's top management established a project team of five members and appointed Rebecca, the lead operations manager, as the project manager. The BCM team was tasked with the effective implementation of the BCMS in line with ISO 22301 requirements. Rebecca worked with the top management to analyze the internal context of the company to define the BCMS scope, focusing on assessing and determining who is responsible for coordinating and managing activities at different organizational levels.

The project team divided the implementation project into smaller tasks, identifying the personnel, equipment, and materials needed for each. Rebecca personally handled resource allocation to implement and support the BCMS. Meanwhile, the top management ensured active involvement and commitment at all levels of the organization to enhance the BCMS's effectiveness.

Rebecca and the team drafted and published the business continuity policy on the company’s website. However, some employees found the technical jargon challenging to understand, so comprehensive training sessions were held to address this issue. These measures strengthened NexTech’s resilience and enhanced client trust by proactively addressing potential disruptions.

According to Scenario 4, what method was used to estimate resources for the BCMS implementation project in NexTech?

Options:

A.

Public estimation data

B.

Alternative analysis

C.

Bottom-up estimation

Question 12

Scenario:

Clicked is a law firm that handles complex clients' needs and offers a wide range of legal and tax services. Clicked’s professionals are equipped with an in-depth knowledge of the legal and regulatory requirements. They are committed to providing their clients with the best services and legal advice. Considering that it is essential to meet their clients' needs, Clicked decided to implement a BCMS based on ISO 22301 to provide them uninterrupted services.

To implement the BCMS, the top management of Clicked decided to contract an external consultant, Tris, as the BCMS project manager, and assembled a team of four members to aid in the process. Prioritizing a smoother integration of the BCMS, the top management focused on incorporating it into the company's existing operational procedures. Additionally, the top management and the project team chose to adopt the Plan-Do-Check-Act (PDCA) model as theirimplementation approach, allowing for a systematic and phased approach to establishing and maintaining the BCMS.

Then, the top management and Tris compiled a document containing the financial benefits and consequences of every decision they were going to make during the implementation of the BCMS. The top management also agreed that the project implementation should be finalized within a six-month timeframe, encompassing planning through the completion of the last implementation stage.

The project team initiated the implementation process by analyzing the company's internal and external context. This involved evaluating Clicked’s compliance with all applicable legal requirements and understanding the key services, necessary activities, and resource allocation, including staff expertise and technological tools. Based on this analysis, the top management and Tris established specific business continuity objectives. Their primary goal was to ensure that all critical legal services could be resumed within a two-hour timeframe following any disruptive incident to minimize client impact.

Clicked decided to contract an external consultant as project manager for the implementation of their BCMS. Is this compliant with ISO 22301?

Options:

A.

Yes, organizations can contract an external consultant as project manager.

B.

No, the project manager responsible for implementation should be an employee of the organization.

C.

No, an external consultant may only be hired as an advisor to the BCMS project team.

Question 13

Scenario:

Belle, a food and beverage processing company, is dedicated to crafting products that meet customers' needs while promoting healthier lifestyles. Central to its mission is a commitment to upholding the highest food safety standards and ensuring the consistent quality of their offerings. From the initial stages of preparation through processing, packaging, and transportation, Belle maintains rigorous control over every aspect of food production.

Recognizing the importance of resilience in potential disruptions, Belle adopted a business continuity management system (BCMS) based on ISO 22301. By implementing this system, Belle aimed not only to ensure uninterrupted product delivery but also to enhance its reputation, foster customer confidence, and gain a competitive edge. To oversee the BCMS implementation, Belle appointed a dedicated business continuity project team responsible for leading the BCMS implementation project. It also assigned a business continuity manager responsible and accountable for the BCMS overall.

Before initiating the BCMS implementation, the BCM team conducted a thorough analysis of the stakeholders involved. Using specialized tools, they categorized stakeholders according to their influence, expected level of involvement, and anticipated contribution throughout the implementation of the BCMS and related activities.

Throughout the BCMS implementation process, Belle’s top management emphasized the integration of business continuity principles into existing processes, aligning them with the organization's strategic objectives. They developed the business continuity objectives and the BCMS scope. To ensure widespread understanding and adoption of the BCMS among employees,the BCM team developed an instructional video explaining the business continuity policy. Recognizing the unfamiliarity of employees with business continuity terminology, the team subsequently devised a comprehensive training program aimed at enhancing staff competence in BCMS matters. This initiative not only educated employees about the policy but also underscored the benefits of improved business continuity performance.

The organization also established evaluation methods to assess the impact of competence trainings. It measured the staff engagement and retention levels, as well as performance against training objectives.

As Belle continued to innovate and expand its product and service offerings, the organization revisited its BCMS scope to remain aligned with evolving priorities. Recent additions to the scope included a new department and two new products aligning with its updated business continuity objectives to enhance the safety of raw materials and key ingredients.

In response to potential disruptive risks, Belle established clear protocols outlining specific actions to be taken, assigning responsibilities, and defining criteria for evaluating the effectiveness of these measures. By proactively addressing risks and fortifying its resilience, Belle aimed to uphold its dedication to delivering safe, top-quality products while also safeguarding the interests of its stakeholders.

Belle decided to modify its BCMS scope, which was established at the beginning of the BCMS implementation process. Is this acceptable?

Options:

A.

Yes, the scope may evolve, ensuring that the BCMS continually supports the organization’s continuity goals.

B.

Yes, BCMS scope must be updated every three months in order to fit the requirements of the relevant standards.

C.

No, BCMS scope is developed as part of the initial implementation project and as such it should not be modified.

Question 14

Scenario:

NexTech Innovations, a dynamic tech startup located in Seoul, South Korea, is renowned for its advancements in artificial intelligence and robotics. Serving a global clientele, NexTech encountered a sudden obstacle when a critical supplier abruptly ceased operations, disrupting their supply chain and threatening their ability to deliver products on schedule. Recognizing the need for resilience, NexTech initiated the implementation of a robust business continuity management system (BCMS) based on ISO 22301.

NexTech's top management established a project team of five members and appointed Rebecca, the lead operations manager, as the project manager. The BCM team was tasked with the effective implementation of the BCMS in line with ISO 22301 requirements. Rebecca worked with the top management to analyze the internal context of the company to define the BCMS scope, focusing on assessing and determining who is responsible for coordinating and managing activities at different organizational levels.

The project team divided the implementation project into smaller tasks, identifying the personnel, equipment, and materials needed for each. Rebecca personally handled resource allocation to implement and support the BCMS. Meanwhile, the top management ensured active involvement and commitment at all levels of the organization to enhance the BCMS's effectiveness.

Rebecca and the team drafted and published the business continuity policy on the company’s website. However, some employees found the technical jargon challenging to understand, so comprehensive training sessions were held to address this issue. These measures strengthened NexTech’s resilience and enhanced client trust by proactively addressing potential disruptions.

Based on Scenario 4, the top management of NexTech ensured the involvement and commitment of all levels of the organization. What did they achieve?

Options:

A.

Fostering ethics and integrity

B.

Engagement of personnel

C.

Segregation of duties and responsibilities

Question 15

What is one of the advantages of measurement and monitoring in the context of a BCMS, among others?

Options:

A.

Verifying compliance with all industry laws and best practices.

B.

Implementing controls to ensure the realization of processes.

C.

Both A and B.

Question 16

What does measurement refer to?

Options:

A.

The process of determining the value and traits of a system, process, or product.

B.

The process of observing a system, process, or product to determine its performance levels.

C.

The process of examining a system, process, or product in order to understand it better.

Question 17

Scenario:

Belle, a food and beverage processing company, is dedicated to crafting products that meetcustomers' needs while promoting healthier lifestyles. Central to its mission is a commitment to upholding the highest food safety standards and ensuring the consistent quality of their offerings. From the initial stages of preparation through processing, packaging, and transportation, Belle maintains rigorous control over every aspect of food production.

Recognizing the importance of resilience in potential disruptions, Belle adopted a business continuity management system (BCMS) based on ISO 22301. By implementing this system, Belle aimed not only to ensure uninterrupted product delivery but also to enhance its reputation, foster customer confidence, and gain a competitive edge. To oversee the BCMS implementation, Belle appointed a dedicated business continuity project team responsible for leading the BCMS implementation project. It also assigned a business continuity manager responsible and accountable for the BCMS overall.

Before initiating the BCMS implementation, the BCM team conducted a thorough analysis of the stakeholders involved. Using specialized tools, they categorized stakeholders according to their influence, expected level of involvement, and anticipated contribution throughout the implementation of the BCMS and related activities.

Throughout the BCMS implementation process, Belle’s top management emphasized the integration of business continuity principles into existing processes, aligning them with the organization's strategic objectives. They developed the business continuity objectives and the BCMS scope. To ensure widespread understanding and adoption of the BCMS among employees, the BCM team developed an instructional video explaining the business continuity policy. Recognizing the unfamiliarity of employees with business continuity terminology, the team subsequently devised a comprehensive training program aimed at enhancing staff competence in BCMS matters. This initiative not only educated employees about the policy but also underscored the benefits of improved business continuity performance.

The organization also established evaluation methods to assess the impact of competence trainings. It measured the staff engagement and retention levels, as well as performance against training objectives.

As Belle continued to innovate and expand its product and service offerings, the organization revisited its BCMS scope to remain aligned with evolving priorities. Recent additions to the scope included a new department and two new products aligning with its updated business continuity objectives to enhance the safety of raw materials and key ingredients.

In response to potential disruptive risks, Belle established clear protocols outlining specific actions to be taken, assigning responsibilities, and defining criteria for evaluating the effectiveness of these measures. By proactively addressing risks and fortifying its resilience, Belle aimed to uphold its dedication to delivering safe, top-quality products while also safeguarding the interests of its stakeholders.

As stated in Scenario 3, the BCM team communicated the importance of the BCMS and explained the policy through a video. Is this acceptable?

Options:

A.

Yes, sharing a video in which the policy is explained is also a valid method of communication.

B.

No, the business continuity policy should only be communicated verbally by the top management.

C.

No, the business continuity policy should be communicated formally, such as through emails, meetings, rather than through alternative means.

Question 18

Scenario:

NexTech Innovations, a dynamic tech startup located in Seoul, South Korea, is renowned for its advancements in artificial intelligence and robotics. Serving a global clientele, NexTech encountered a sudden obstacle when a critical supplier abruptly ceased operations, disrupting their supply chain and threatening their ability to deliver products on schedule. Recognizing the need for resilience, NexTech initiated the implementation of a robust business continuity management system (BCMS) based on ISO 22301.

NexTech's top management established a project team of five members and appointed Rebecca, the lead operations manager, as the project manager. The BCM team was tasked with the effective implementation of the BCMS in line with ISO 22301 requirements. Rebecca worked with the top management to analyze the internal context of the company to define the BCMS scope, focusing on assessing and determining who is responsible for coordinating and managing activities at different organizational levels.

The project team divided the implementation project into smaller tasks, identifying the personnel, equipment, and materials needed for each. Rebecca personally handled resource allocation to implement and support the BCMS. Meanwhile, the top management ensured active involvement and commitment at all levels of the organization to enhance the BCMS's effectiveness.

Rebecca and the team drafted and published the business continuity policy on the company’s website. However, some employees found the technical jargon challenging to understand, so comprehensive training sessions were held to address this issue. These measures strengthened NexTech’s resilience and enhanced client trust by proactively addressing potential disruptions.

To understand the internal context of NexTech, Rebecca and the top management focused on analyzing who coordinates and manages the activities of the company. Which level of the company did they consider in this case?

Options:

A.

Strategic level

B.

Steering level

C.

Operational level

Question 19

Scenario:

Belle, a food and beverage processing company, is dedicated to crafting products that meet customers' needs while promoting healthier lifestyles. Central to its mission is a commitment toupholding the highest food safety standards and ensuring the consistent quality of their offerings. From the initial stages of preparation through processing, packaging, and transportation, Belle maintains rigorous control over every aspect of food production.

Recognizing the importance of resilience in potential disruptions, Belle adopted a business continuity management system (BCMS) based on ISO 22301. By implementing this system, Belle aimed not only to ensure uninterrupted product delivery but also to enhance its reputation, foster customer confidence, and gain a competitive edge. To oversee the BCMS implementation, Belle appointed a dedicated business continuity project team responsible for leading the BCMS implementation project. It also assigned a business continuity manager responsible and accountable for the BCMS overall.

Before initiating the BCMS implementation, the BCM team conducted a thorough analysis of the stakeholders involved. Using specialized tools, they categorized stakeholders according to their influence, expected level of involvement, and anticipated contribution throughout the implementation of the BCMS and related activities.

Throughout the BCMS implementation process, Belle’s top management emphasized the integration of business continuity principles into existing processes, aligning them with the organization's strategic objectives. They developed the business continuity objectives and the BCMS scope. To ensure widespread understanding and adoption of the BCMS among employees, the BCM team developed an instructional video explaining the business continuity policy. Recognizing the unfamiliarity of employees with business continuity terminology, the team subsequently devised a comprehensive training program aimed at enhancing staff competence in BCMS matters. This initiative not only educated employees about the policy but also underscored the benefits of improved business continuity performance.

The organization also established evaluation methods to assess the impact of competence trainings. It measured the staff engagement and retention levels, as well as performance against training objectives.

As Belle continued to innovate and expand its product and service offerings, the organization revisited its BCMS scope to remain aligned with evolving priorities. Recent additions to the scope included a new department and two new products aligning with its updated business continuity objectives to enhance the safety of raw materials and key ingredients.

In response to potential disruptive risks, Belle established clear protocols outlining specific actions to be taken, assigning responsibilities, and defining criteria for evaluating the effectiveness of these measures. By proactively addressing risks and fortifying its resilience, Belle aimed to uphold its dedication to delivering safe, top-quality products while also safeguarding the interests of its stakeholders.

In Scenario 3, at which level did the organization evaluate the effectiveness of the training activities?

Options:

A.

At an organizational level.

B.

At a team level.

C.

At an individual level.

Question 20

According to ISO 22301, what should the top management ensure when establishing the business continuity policy?

Options:

A.

That the policy includes a commitment to satisfy applicable requirements.

B.

That the policy is communicated to and approved by all external parties of the organization.

C.

That the policy specifies all legal and regulatory requirements.

Question 21

Which of the following is a discussion-based exercise?

Options:

A.

Functional exercise

B.

Full-scale exercise

C.

Desktop

Question 22

Scenario:

Initar, an IT security service company in New Jersey, provides 24/7 cloud and IT infrastructure support to mid-sized companies. Recognizing the need for a robust business continuity strategy, Initar transitioned from informal business continuity planning to implementing a BCMS based on ISO 22301.

During the BCMS implementation, a major nonconformity was identified: the BIA report lacked a defined Maximum Tolerable Period of Disruption (MTPD), which is required by ISO 22301. The corrective action process began with the IT team conducting a root cause analysis using a cause-and-effect diagram. Based on the analysis, an action plan was drafted to update all BIAs and establish the MTPD. The plan was approved by the head of the IT department, who monitored its implementation, while the internal auditor reviewed the effectiveness of the corrective action.

Which activity of the corrective action process is NOT performed in Scenario 7?

Options:

A.

Selection of solutions

B.

Identification of the nonconformity

C.

Analysis of the root cause

Question 23

Scenario:

Teleconn, a UK-based telecommunications provider, initiated a BCMS based on ISO 22301 to ensure reliable and consistent services. To monitor the BCMS’s performance, the internal audit function was outsourced to a company specializing in auditing services. The outsourced internal auditor was given unrestricted access to employees and documented information necessary for an effective audit.

Based on Scenario 6, the top management planned to conduct management reviews every three months. Is this compliant with ISO 22301?

Options:

A.

Yes, ISO 22301 does not provide any specific requirements regarding the frequency of management reviews.

B.

Yes, ISO 22301 requires organizations to conduct management reviews every three months.

C.

No, ISO 22301 requires organizations to conduct management reviews every six months.